Loading...
13-100383City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: FLYNN Project Address: 622 SW 294TH ST t - 3 Building - Single Family Permit #: 13 -100383 -00 -SF Inspection Request Line: (253) 835-3050 Parcel Number: 1196001895 Project Description: ADD - Construct 120 sqft to existing garage and 110 sqft to first floor and covered entry. Owner Anniicant Contractor Lender GREGORY L FLYNN QUALITY NORTHWEST QUALITY NORTHWEST OWNER IS LENDER 622 SW 294TH ST CONSTRUCTION CONSTRUCTION FEDERAL WAY WA 98003 805 S MARINE HILLS WAY QUALINC141DR (4/10/13) FEDERAL WAY WA 98003 805 S MARINE HILLS WAY FEDERAL WAY WA 98003 Census Category: 434 - Residential altladd - no change' uAer f units Includes: #1 #2 # #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load Floor Areas . ft. 0 0 � V P it Info New/ Additional Sq. Feet -1st Floo . ... ........ 0 Ne nal Sq. Feet - 2nd Floor...................0 New / Additional Sq. Feet - 3rd Floor...... .....� New itional Sq. Feet - Basement...................0 Occupancy # 1 -Construction Type............. �.....Ty - B Ne Additional Sq. Feet - Deck ................... ....... 0 New / Additional Sq. Feet - Garage ....................... I Mechanical to be Included? ................................... No Occupancy # 1 - Class .......................................... -3 New / Additional Sq. Feet - Other .......................... 110 Plumbing to be Include ............................ ....No New / Additional Sq. Feet - Total.......................... 230 Occupancy #I - Use ........... .. J ... ......... Residence ( Zoning Designation ................................................ RS 9.6 family) © Fixtures Assriated With This Permit !! CONDITIONS: Defered subm' al of porch p4( ist layout at entry, 4 x 8 beam attachment to porch addition. PERMIT EXPIRES Wednesday, July 24, 2013 Permit Issued on Friday, January 25, 2013 Vlereby certify that the above information is correct and that the construction on the above described property and the occupancyAthne willbe in a ordance with the laws, rules and regulations of the State of Washington nd the City of Federal Way. Owner or agenDate: f ._/l 3 CITY of VA�p Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 13 -100383 -00 -SF Address: 622 SW 294TH ST GREGORY L FLYNN FEDERAL WAY, WA 98023-3541 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Foundation Wall (4115) Drainage/Downspout (4040) Slab/Concrete Floor (4255) Approved to place concrete Approved to backfill Approved to place concrete By F61C Date .,? , By Date By Date Underfloor Framing (4285) SWM Precon Site Mtg (4400)Initial Floor Sheathing (4105) Erosion Control (4365) Shear Walls (4245) Footings/Setback (4110) By Approved By To be done prior to breaking ground By Date Approved to place concrete By Date By Date By Date , Foundation Wall (4115) Drainage/Downspout (4040) Slab/Concrete Floor (4255) Approved to place concrete Approved to backfill Approved to place concrete By F61C Date .,? , By Date By Date Underfloor Framing (4285) Rough Electrical Approved Floor Sheathing (4105) Final Electrical Approved Shear Walls (4245) Approved to sheath floor By Approved to install flooring By Approved to install siding By Date By Date By ! Date c3 — 13 Roof Sheathing (4220) Fire/Draft Stops (4095)Interim Erosion Control (4370) Approved to install roofing Approved Approved By Date .s --2 -13 By Date r1g By Date to scheduling a Framing inspection; ❑ Framing (4120) Insulation (4150) , Plumbing &Mechanical Rough in and Approved to insulate Approved to install wallboard EFire/DraftStop inspections must be signed -off and approved. IBC 1093A By Date By Date /�C�/ Gypsum Wallboard Nailing (4130) Final Erosion Control (4375) Final - Building (4050) Approved to install mud & tape Approved Approved Date , (-4 _ By Date By Date Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date 4%L OF VA0P Federal Way L -J DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES RESUBMITTED 33325 8`" Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 MAR 13 2013 www.ci!3Loffedemlw@X.com CITY OF FEDERAL WAY CDS RESUBMITTAL INFORMATION This completed form MUST accompany a// resubmitta/s "Please note.- Additional orrevisedplans or documents for an active project wilt not be accepted unless accompanied by this completed fonn. Mailed resubmittals that do not include this form or that do not contain the conectnumber ofcopies w411 be retumed or discarded. You are encouraged to submit all items in person and to contact the Permit Counterpn'or to submitting ifyou are not sure about the number of copies required. '- L" CHANGES TO DRAW/NGS MUST BECLOUDED. Project Number: Project Name: V Project Address: &**222-�� !-. w. 9�d?.•3 Project Contact: ,Z fry Phone: 2,%C3 -33x -73J-1 RESUBMITTED ITEMS: # of Copies "* Deta edil Description of Item el k 6 X /a Wmk On "rcpt f o "Always submit the same number of copies as required foryourinitial application.""` Resubmittal Requested by: Letter Dated: t / Member) Bulletin #129 — January 1, 2011 Page i of l k:\Handouts\Resubmittal Information R�cew CM Federal Way 2013 InN 2 Y pF PERMIT NUMBER O / Ci PERMITOWPLICAVION o o _ CIT C — TARGET DATE SITE ADDRESS 6 yt s Fi/rYQl Val, ?P623 SUITE/UNIT # ,W .. Lua. PROJECT VVALUATION ZONING ASSESSOR'S TAS PARCEL i �J 0 Ole L O - O TYPE OF PERMIT 56 BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT �C/ n /7 4 Jo/ 1 .t / Dif PROJECT DESCRIPTION '7LO 4i0 I ¢ qa�&Z& Q f 1 O C t d �' T % 3 %- X a C ` EC Detailed description of work to be included on this permit only PROPERTY OWNER NAME r e /7all c i / /7 PRIMARY PHONE �3 - 9w - 7146,V NAILING A96RZW q1Y s� E.KAM + CTr d e ra./ Wa �i 10 IF 02,3 1 i f �U, l td ' Con,sf-• -2S' -335-73S NAMING ADD g SIL CONTRACTOR a/e-YO- l Lem STATIt '7 003 's3-9yi-PFFR WA STATE CONTRACTOR'S LICENSE # urP,4 / G i I ESpIItATION DATE i i J.7 FEDERAL WAY BUSINESS LICENSE # 9- B6-0o�38-vo i J1; ' # / �; // � j � y U 11 7 N w PRI &- PHONE S3 - 335"-7 �3�5' / APPLICANT u / G ADDRESS /7l/` s Lt)4 c- e de of l L JO STATE zn`9 800,3 F S -9y/ -299y PROJECT //?f fe PRIMARY CONTACT�t /Yj .3GNE -% �S o G _So. ma Yin e/ /i f CU O ItKAM (The individual to receive andADDRE88 respond to all correspondence concerning this application)C Te d e vu wa STATE uxT z� ?.Foo3 FAS ? 3 -loll -�' � PROJECT FINANCING Nn=' OWNER: -FINANCED Required value of $5,000 or more (RCW 19.27.095) MAILING ADDRESS, CITY, STATE, ZIP PHONE I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certVy that to the best Of my knowledge, the information submitted in support of this permit application is true and correct. I certqy that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its offlcem and employees, upon the accuracy of the information supplied to the city as apart ofapplication. -7 SIGNATURE: DATE ` 112-311, �-- PRINT N Bulletin #100 -January 1, 2013 Pagel of 3 k:\Handouts\Pennit Application VALUE OF MECHAMCAL WORK MECHANICAL PERMIT $ Indicate how many of each type of flxture to be installed or relocated as part of this project, Do not include exi rkg fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS (commercial) BOILERS FURNACES HOT WATER TANKS (Gan COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT Indicate how many of each type of fixture to be installed or relocated as part of this project Do not indude existing res to remain. BATHTUBS (orTub/showercombo) LAVS (Hand sioka) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS SHOWERS VACUUM BREAKERS ❑ Yes X No ❑ Yes iK No uneF. RTRR.S SUMPS WASHING MACHINES TOTAL FDCrURES GENERAL INFORMATION CRITICAL AREAS ON FROPERTY? WATER PHRVEYOR 1 kc ha SEWER PIIRVSYOR �lj ke- 4a,n VALIIB OF EMISTING IMPRRVEMEIITS 3,S^v 0 ) Q vt v, s EXISTING/PREVIOUS USE LOT SIZE (Im Square Feet) EICISTING FIRS SPRINKLER SYSTEM? PROPOSED FIRE UPPRBSSION SYSTEM? ❑ Yes X No ❑ Yes iK No COMMERCIAL - NEVADDITION AREA DESCRIPTION Area Occupancy Group(s) Construction # of Additional Information in Square Feet Type_ I stories ADDITION COMMERCIAL - REMODEUTENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Groups) Construction # of Additional Information is Square Feet I I I Type I Stories TENANT AREA ONLY Bulletin #100 — January 1, 2013 Page 2 of 3 k: flandoutsTennit Application