18-105273r
City of Federal Wry
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax (253) 8352609
Project Name: BUI
Project Address: 33401 10TH CT SW
FILE
Project Description: GAS FURNACE REPLACEMENT
Mechanical
Permit #:18 -105273 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number: 926496 0700
Owner
Applicant
Contractor
TAI VAN BUI
RACHAEL AILSHIEPACIFIC HEATING &
PACIFIC AIR SYSTEMS (GENERAL)
33401 10TH CT SW
COOLING
PACIFAS093KA (9/8/19)
FEDERAL WAY WA
8607 DURANGO ST SW
12811 PACIFIC HWY SW
98023-5311
LAKEWOOD WA 98499
LAKEWOOD WA 98499
Additional Permit Information
Mechanical Work Valuations .................................. 6669 Is this an Online or O.T.C. application?.................. Yes
Furnaces 1
PERMIT EXPIRES Monday, 6 May, 2019
Permit Issued on Wednesday, November 7, 2018
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the Ci of Federal Way.
Owner or agent: ON11 Date:
lookk
crrY OF
Federal Way
PERMIT M 18105273 00
i
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 33401 10TH CT SW
Project: DEVAN T BUI FEDERAL WAY WA 98023-5311
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0
Mechanical Rough -in (4165)
FAI
Gas Piping (4125)
0
Final - Mechanical (4065)
❑
Approved
Approved to release test
Approved
By
0,%kkr, Date
By
Date
By
Date
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date