Loading...
18-104518City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835.2607 Fax (253) 835-2609 > .. Electrical Permit #:18 -104518 -00 -EL FILE Inspection Request Line: (253) 835-3050 Project Name: GLEN PARK AT WEST CAMPUS APARTMENTS BLDG 42 Project Address: 952 SW CAMPUS DR Project Description: Replace meter with a remote meter Parcel Number: 192104 9047 Owner Applicant Contractor BEAR CAPITAL JOINT VENTURE MARK JENSENINNOVATIVE SYSTEMS INNOVATIVE SYSTEMS TECHNOLOGY PO BOX 811097 TECH, INC. INC (EL 01) CHICAGO IL 60681-1097 1402 LAKE TAPPS PKWY SE SUITE 104-147 INNOVST881B4 (1/24/20) AUBURN WA 98092 402 LAKE TAPPS PKWY SE SUITE 104-14' AUBURN WA 98092 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Mast or Meter Repair (Resider. 1 PERMIT EXPIRES Thursday, 26 September, 2019 Permit ]Issued on Wednesday, September 26, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. ^ Owner or agent: i i K I K 1 C Date: tITY OW '4 Federal Way THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PEW PERAW #: 18104518 00 Address: 952 SW CAMPUS DR Bldg 42 Project: BEAR CAPITAL JOINT VENTURE FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not an -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground (4295) 0 Ditch cover (4030) El Slab/Concrete Floor (4255) ❑ Approved Approved IBY Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) 0 Temporary Power (4275) © Service (4235) ❑ Approved Approved IBY Approved By Date By Date By Date 7❑ Feeders/Sub-panels (4045) ® Rough Electrical (4225) Final Electrical Ceiling Cover (4020) ❑ Approved Approved Approved By Date By Date By Date © Final - Electrical (4055) Approved By Date N �;L�otv'f Rough Electrical El Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date