14-100419Electrical
City of Federal Way
Community &Econ. Dev. Services�' •Permit #. 14 -100419 -00 -EL
33325 8th Ave S
Federal Way, WA 98003
LE
Ph: (253) 835-2607 Fax (253) 835-2609 Inspection Request Line: (253) 835-3050
Project Name: WYNSTONE EAST LOT 72
Project Address: 910 SW 339TH ST Parcel Number. 957850 0720,
Project Description: install low volt tstat wire for new construction installation
Owner
ARplican
Contractor
LENNAR NORTHWEST INC
CARA WERMUTH
SOUND HEATING & A/C (ELECTRICAL)
12815 CANYON RD E SUITE F
SOUND HEATING & A/C
SOUNDHAO06DA (5/17/14)
PUYALLUP WA 98373
5526 184TH ST E
5526184TH ST E SUITE A
PUYALLUP WA 98375
PUYALLUP WA 98375
Additional Permit information
Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No
Electrical Fixtures
Thermostat ..................................... 1 i
t
PERkrl
,,%, f-:XPIRES Saturday, July 26, 2014 '•
emit='fssued on Monday, January 27, 2014
I hereby certify that the above information is correct and thailhe.construction on the above described property and
the occupancy and the use will be in accordance with the,laws, rulei and regulations of the State of Washington
and the City of a eiaj Way.
Owner or agent: a Rho Date:
W11100 1111VE
r;
F.
9
TF,IS CARD IS TO REMAIN ON-SITE
Federal W Construction Inspection Record
Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 14 -100419 -00 -EL Address: 910 SW 339TH ST
Project: LENNAR NORTHWEST INC FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
UFER Groun
Approved
By Date
13
Pool Bonding (4195)
Approved
By
Date
I 1By
Approved to place concrete
0
Feeders/Sub-panels (4045)
Approved
By
Date
0
Final - Electrical (4055)
Date
Approved
BY
�,--AA
V 4 Date
(4 1
13
Ditch cover (4030)
Slab/Concrete Floor (.
By
Approved
I 1By
Approved to place concrete
By
Date
Date
E]
Temporary Power (4275)
Approved
By
Date
n
0
Rough Electrical (4225)
Approved
By Q
Date `5
El
Service (4235)
Approved
By
Date
n
0
Ceiling Cover (4020)
Approved
By
Date
El
Rough Electrical
Approved
Final Electrical
n
Right of Way
Approved
Approved
By
Date
By
Date
By
Date