Loading...
14-106107City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 fax: (253) 835-2609 F L Project Name: WA677 STEEL LAKE AT&T Project Address: 29859 16TH AVE S Building - Commercial Permit #: 14 -106107 -00 -CO Inspection Request Line: (253) 835-3050 Parcel Number. 052104 9016 Project Description: ADD - Modification. to existing site by upgrading antennas and adding ancillary equipment Owner AnI21icant Contractor Lender TRI POINT HOLDINGS INC DAN BAUM MASTEC NETWORK SOLUTIONS PO BOX 6229 GLOTEL INC FEDERAL WAY, WA 98063 1203 114TH AVE SE MASTENS876KN (5/14/17) BELLEVUE WA 98004 1203 114TH AVE SE BELLEVUE WA 98004 Census Category: 437 - Commercial alt / add / Vn 11 Includes: # 1 #2 #4 Occupancy Class: Construction Type: Occupancy Load- Floor oadFloor Areas . ft. 0 0z 0 Mechanical to be Included? ....................................[ Permit for BuildingSheHJOnly? New / Additional Sq. Feet - Total...... I I hereb erti thrlt the occ y aril Owner or Of Of Stories.................................................0 Bing to be Included?......................................No Zoning Designation...............................................RS 9.6 lit 11 9PIRES V RMIT Monday, January 4, 2016 Permit Issued on Wednesday, July 8, 2015 above information is correct and that the construction on the above described property and use will be in accordance with the laws, rules and regulations of the State of Washington 7and the City of Federal Way. % V'" ( Date: �r S CITY OF lklv�& Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 14 -106107 -00 -CO Address: 29859 16TH AVE S TRI POINT HOLDINGS INC FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Final - Building (4050) Approved By Date SWM Precon Site Mtg (4400) 0 Initial Erosion Control (4365) Final Electrical Approved Footings/Setback (4110) Approved By To be done prior to breaking ground Approved to place concrete By Date By Date By Date Final - Building (4050) Approved By Date Foundation Wall (4115) Drainage/Downspout (4040)11 Final Electrical Approved Re -steel (4215) Approved to place concrete By Approved to backfill Approved to place concrete or grout By Date By Date By Date Floor Sheathing (4105) 0 Underfloor Framing (4285) Slab/Concrete Floor (4255) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date 0 Fire/Draft Stops (4095) Roof Sheathing (4220) Shear Walls (4245) Approved to install siding Approved to install roofing Approved By Date By Date By Date Framing (4120) Interim Erosion Control (4370)Ere/Draft scheduling a Framing inspection; Approved Plumbing &Mechanical Rough4n and Approved to insulate By Date top inspections must be signed -off and By Date approved. IBC 1093.4 Suspended Ceiling Grid (4265) Gypsum Wallboard Nailing (4130) Insulation (4150) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date 0 Final Erosion Control (4375) Final - Planning Final - S K F & R (4060) Approved Approved Approved By Date By Date By Date Final - Building (4050) Approved By Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date 11 r •MY Way PERMIT APPLICATION PERMIT NUMBER ( _ l 0 7 (2-0 ppCelylD 3b -y9 NOV 2 6 2014 crry dr°Mw& m� SITE ADDRESS V 36 °1 6 ft ave S SUITE/UNIT M PROJECT VALUATION $ 5,99 ZONING s�, ASSESSOR'S TAR/PARCEL # q- -92 TYPE OF PERMIT BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT 7 PROJECT DESCRIPTION Detailed description of work to MO&=AAA a G 'j 1� b Am" '' A 41 Sy be included on this permit only ►1`�1� 7ti ;%l ft �S PROPERTY OW NAM&� 1 X�NEER C PRIMARY H NE MAILING AD ESS V o V,L E-MAIL CITY STATE ZIP NAMj�W M Ala IIA -64- PHONE ING ADDRE1J\SS E-MAIL CONTRAC CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE k EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE N NAMEIa r + n�'l PRIMARYpHON Q I/p APPLICANT MAILING ADDR S �� 1 s�� 6 n E-MAIL CIT / q�V V C ll16 STATE�ZIP o0 -7 FAX PROJECT CONTACT NAME ICA PRIMARY PHONE MAILIN6 ADDRESS E-MAIL (The individual to receive and respond to all correspondence CITY STATE ZIP FAX concerning this application) PROJECT FINANCING NAME NER-FINANCED Required value of $5,000 or more (RCW 19.27.095) MAILING ADDRESS, CITY, STATE, ZIP PHONE I cert(& under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the as a art oft s application.] SIGNATURE: " DATE v `� PRINT NAME: WiV 1'a ga ALL -t Bulletin 4100 —January 1, 2013 Page 1 of 3 k:�Handouts\Permit Application No u Becky Chapin • From: Daniel Baum <dbaum@glotelinc.com> Sent: Wednesday, lune 03, 2015 3:32 PM To: Becky Chapin Cc: Scott Sproul Subject: RE: WA677 Steel Lake Attachments: WA677-Steel Lake_LTE_2C_100CD_04.30.15 sealed.pdf, WA677 Steel Lake LTE 2C - FE Consent Letter 5.29.15.pdf Hi Becky and Scott this sites SOW has changed so now they wont have to remove the pole and it is only an antenna swap. Please see attached dwgs and let me know what will be required to submit. I also have the parks dept consent attached Thank you Daniel Baum 206 661-8053 dbaum@glotelinc.com 15375 SE 301h Place Suite 160 Bellevue, WA 98007 From: Becky Chapin [mailto:Becky.Chapin@cityoffederalway.com] Sent: Monday, December 08, 201410:50 AM To: Daniel Baum Cc: Scott Sproul Subject: WA677 Steel Lake Hi Daniel, The letter that was attached to the building permit with the signature of landlord consent, does not address a light pole switch/height increase that the plans depict. I spoke with Steve Ikerd, Parks Deputy Director. Parks will need a formal request to change the pole and drawings of the proposed new pole with details about the relocated lights. Once Parks Dept. approves the new light pole: 1. Provide the approval email/letter from Parks Dept. to Becky in Planning; and 2. Resubmit the following for the building permit application (File # 14 -106107 -CO) - contact Assistant Building Official Scott Sproul, 253-835-2633 or scoff.sproul(a-cityoffederalway.com if you have questions: a. footing and foundation details for the new pole, b. engineering for the new pole; and c. attachment details for lights and antennas. If you have any emails that have useful information regarding the light pole change feel free to send them my way, otherwise, let me know if you have any questions. Thanks, Becky Chapin Associate Planner May 4, 2015 City of Federal Way 33325 8d' Avenue S, Federal Way, WA 98003 RE: AT&T Cell Site Modification - Landlord Consent Site Number: WA677 Steel Lake, FAN 10031010 Site Address: 2985916` Avenue S, Federal Way, WA 98003 To Whom it May Concern; • Reference is made to the original Site Lease Agreement (the "Agreement") dated May 28nd, 2002, as amended by First Amendment to Site Lease Agreement dated September 1, 2007 and Second Amendment to Site Lease Agreement dated August 9d'. 2012, by and between City of Federal Way, a municipal corporation (hereafter "City") and New Cingular Wireless PCS, LLC, a Delaware limited liability company d/b/a AT&T Wireless Services of Washington, LLC., an Oregon limited liability company (hereafter "AT&T). AT&T will be upgrading their existing wireless facility at the above referenced address. Pursuant to Paragraph 1 of the Agreement, AT&T may not add Equipment to the Leased Premises without first obtaining the City's written approval. AT&T's scope of work for this modification is as follows: AT&T proposes to modify existing unmanned telecommunication facility by replacing (3) existing panel antennas with (3) new panel antennas on the existing steel light pole. AT&T will also add (1) new battery rack with (4) new batteries, and (1) new LTE equipment within an existing LTE rack, to be located in AT&T's existing equipment shelter. The specific details of this proposal are provided in the construction drawings dated 4/30/15, which have been provided to you. By executing below, you acknowledge your consent to the proposed modification. According to the Agreement, your consent is anticipated in a timely fashion. I would appreciate if you would sign, scan and email this letter back to me at ccommerford@glotelinc.com. You will be contacted by a representative on behalf of AT&T, prior to start of construction to coordinate access to the site. If you have any questions, please contact me at (503)348-5070. Thank you for your cooperation. City Consent.Provided by: Sincerely, � �5� Craig Commerford Site Development Specialist Glotel Inc. Authorized AT&T Wireless Representative Name: �IASok) ci Er24c*-� Title: M94$FAGtL/Tif. S Date: daAl4,(-P- • btl�Pn K3 DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES RESUBMITTED 333258 th Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 JUN 10 2015 www.citvoffederalway.com CITY OF FEDERAL WAY CDS RESUBMITTAL INFORMATION This completed form MIDST accompany all resubmitta/s. "Please note. Addition/or revised plans or documents for an active project w// not be accepted unless accompanied by this completed form. Mai/ed resubmitta/s that do not include this form or that do not contain the correct number of copies wi//be returned or discarded. You are encouraged to submit all items in person and to contact the Permit Counterpnor to submitting /fyou are not sure about the number of copies required. -- ANYCHANGES ro DRAw/NGS MUST BECLOUDED. Project Number: 1 - -L10 7--06 _ Project Name: (A)A & 7 % Nf T�ee— Lt,4�e /4 7� T Project Address: Project Contact: Phone: �� �1� &6 -3 - RESUBMITTED -3RESUBMITTED ITEMS: # of Copies" I Detailed Description of Item ** Always submit the same number of copies as required foryourinitia/ application ** Resubmittal Requested by: LSIVanhmeff rC [4t l Letter Dated: 1, r, -A,—/ 0d / .)i1 J4 I� RESUB 0'� F Disftution Date: �$ = B. e t/Div ,Narrje # Description Buildin tannin / PW Fire Other Bulletin # 129 — January 1, 2011 Page 1 of I k:\landouts\Resubmittal Infonnation