14-103916City of. Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FROSTAD
Project Address: 37676 18TH PL S
Building ginglie Family
Permit #: 14 -103916 -00 -SF
Inspection Request Line: (253) 835-3050
Parcel Number: 721265 0910
Project Description: REP - Tear off shakle roofing; 1/2" CDX sheathing and composition shingle roof system.
Owner
KATHRYN A FROSTAD
Anulicant
AMERICA 1 ST ROOFINGBLDRS
Contractor
AMERICA I ST ROOFINGBLDRS
Lender
37676 18TH PL S
FILE
AMER11R056BU (12/28/15)
FEDERAL WAY WA 98003
MUKILTEO WA 98275
City of. Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FROSTAD
Project Address: 37676 18TH PL S
Building ginglie Family
Permit #: 14 -103916 -00 -SF
Inspection Request Line: (253) 835-3050
Parcel Number: 721265 0910
Project Description: REP - Tear off shakle roofing; 1/2" CDX sheathing and composition shingle roof system.
Owner
KATHRYN A FROSTAD
Anulicant
AMERICA 1 ST ROOFINGBLDRS
Contractor
AMERICA I ST ROOFINGBLDRS
Lender
37676 18TH PL S
3816 SOUTH RD SUITE A
AMER11R056BU (12/28/15)
FEDERAL WAY WA 98003
MUKILTEO WA 98275
3816 SOUTH RD SUITE A
MUKILTEO WA 98275
Census Category: 555 - Non-structural roofing pen.4s
a
Includes: #1 #2 3
Occupancy Class:
Construction Type,
Occupancy Load
Floor Area . ft. 0 .. 0
New / Additional Sq. Feet - 3rd Floor.
Mechanical to be Included? ................
I here b fy he e
the occ n and th 1
&MIT EXOS Sunday, February 1, 2015
Permit Issued on Tuesday, August 5, 2014
,e information is correct and that the construction on the above described property and
will be in accordance with the laws, rules and regulations of the State of Washington
r I and the City of Federal Way.
• - - 101r&I ��� I Wi�7 �. Date:
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
14 -103916 -00 -SF Address: 37676 18TH PL S
KATHRYN A FROSTAD FEDERAL WAY, WA 98003-7574
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Fire/Draft Stops (4095) Interim Erosion Control (4370) prior to scheduling s Framing inspection;
Approved Approved Electrical, Plumbing & Mechanical Rough -in and
FirdDraft Stop inspections must be signed -off and
By Date By Date approved. IBC 1093.4
0
SWM Precon Site Mtg (4400)
❑
Initial Erosion Control (4365)
0 Roof Sheathing (4220)
Underfloor Framing (4285)
Approved to install flooring
Approved
Approved to install siding
To be done prior to breaking ground
By
Approved to sheath floor
By
Date
By
Date
By
Date
Fire/Draft Stops (4095) Interim Erosion Control (4370) prior to scheduling s Framing inspection;
Approved Approved Electrical, Plumbing & Mechanical Rough -in and
FirdDraft Stop inspections must be signed -off and
By Date By Date approved. IBC 1093.4
0
Floor Sheathing (4105)Shear
Walls (4245)
0 Roof Sheathing (4220)
Approved to install flooring
Right of Way
Approved to install siding
Approved to install roofing
By
Date
By
Date
DateO rr
Fire/Draft Stops (4095) Interim Erosion Control (4370) prior to scheduling s Framing inspection;
Approved Approved Electrical, Plumbing & Mechanical Rough -in and
FirdDraft Stop inspections must be signed -off and
By Date By Date approved. IBC 1093.4
0
Framing (4120)
Insulation (4150)
Gypsum Wallboard Nailing (4130)
Right of Way
Approved to insulate
Approved
By
Approved to install wallboard
Date
Approved to install mud & tape
By
Date
By
Date
By Date
Final Erosion Control (4375)
Final - Building (4050)
Approved
Right of Way
By
Approved
By
Date
Date
By
Date
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way
By
Date
By
Date
By
Date
CITY OF
Federal Way
4.00
PERM
�
AUG 0520
PERMIT NUMBER _
TARGET DATE
rn E L WAV
SITE ADDRESS �y� /I
SUITE/UNIT #
PROJECT VALUATION
ZONING
ASSESSOR'S TAR/PARCEL #
$ SDI S , DD
TYPE OF PERMIT
OBUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
IK_200la
PROJECT DESCRIPTION
Detailed description of work to
✓<//��
)N 6� u-, 17%! OF E F.--nNU
be included on this permit only
PROPERTY OWNER
NAME
PRIMARY PHONE
MAILING ADDRESS
3767 1�" � PL s
E-MAIL
CITY
STA' , TS
ZIP
5F/ 6 SjQLI i1
CONTRACTQR
NAME
/ �r
PHONE
MAILING ADDRESS
E-MAIL
RiM F / l�Cl+ / ST'12oOF/n .
CITY
L
Mv�ci�o
8TATE
vv,�-
ZIP
9P275
FAX
WA STATE CONTRACTOR'S LICENSE #
� f1L1� �-0S-&10V
EXPIRATION DATE
I Z� 3 /
FE ERAL WAY BUSINESS LICENSE #
%3 Y / S-�J
NAME
PRIMARY PHONE
APPLICANT
MAILING ADDRESS
E-MAIL
CITY
STATE
ZIP
FAX
NAME
PRIMARY PHONE
PROJECT CONTACT
MAILING ADDRESS
EMAIL
(The individual to receive and
respond to all correspondence
CITY
STATE
ZIP
FAX
concerning this application)
PROJECT FINANCING
NAME
OWNER -FINANCED
Required value of $5, 000 or more
(RCW 19.27.095)
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the Information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
Issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as apart of this application.
% ?
SIGNATURE: DATE / �J
PRINT NAME:
Bulletin #100 — January 1, 2013 Page 1 of 3 k:\Handouts\Permit Application