Loading...
18-105615Electrical City of Federal Way Permit #:18 -105615 -00 -EL Community Development Dept. 33325 8th Ave S Federal Way, WA 98003Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax (253) 835-2609 FILE Project Name: LOHER EUGENE TRUST Project Address: 30420 PACIFIC HWY S Parcel Number: 092104 9107 Project Description: Meter inspection to restore power Owner Applicant Contractor LONER EUGENE TRUST BRYAN GREYBEYOND BASIC ELECTRIC BEYOND BASIC ELECTRIC INC 30406 PACIFIC HWY S INC BEYONBES57BE (1/5/19) FEDERAL WAY WA 98003 1918 HILLSIDE DR NE 1918 HILLSIDE DR NE TACOMA WA 98422 TACOMA WA 98422 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Mast or Meter Repair (Comore CONDITIONS: Electrical contractor is required Contractor shall evaluate the existing service; make any repairs required for compliance with the current NEC and WAC 296-46B. Electrical contractor shall meet the inspector at the site to evaluate the installation and provide to the inspector written verification that the service has been evaluated and found to be in safe and compliant condition. If work is found to be in compliance with the code standards then an inspector will approve and place a service approval sticker on the meter base and then you may contact PSE for a service connection. PERMIT EXPIRES Friday, 29 November, 2019 Permit Issued on Thursday, November 29, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: nhil Date: V441wo 1 'M Room -�ti A. MY of 7& Federal Way PERAW #: 1810561500 THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 30420 PACIFIC HWY S Unit 6 Project: LOHER EUGENE TRUST FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on tbe back of this card. 1❑ UFER Ground (4295) Temporary Power (4275) F11 Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved By Date Approved lBy Approved to plus concrete By Date By Date By Date Pool Bonding (4195) ® Temporary Power (4275) © Service (4235) Approved Right of Way Approved Illy Approved By Date By Date Date Date 0 Feeders/Sub-paneb (4045) ® Rough Electrical (4225)g❑ Ceiling Cover (4020) Right of Way Approved 1By Approved Approved lBy Approved By Date By Date Date 10 Final - Electrical (4055) Approved By Date Rough Electrical ❑ Final Electrical Right of Way Approved Approved IBy Approved By Date Date By Date