Loading...
15-105586.. i City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: TETZLOFF Project Address: 33527 5TH PL SW Building - Single` Family Permit #: 15 -105586 -OO -SF Inspection Request Line: (253) 835-3050 Parcel Number: 729805 0050 Project Description: REM - Convert existing loft closet space into a bathroom. Plumbing and mechanical included Owner MARK TETZLOFF AR121acant TONY RODRIQUEZ Contractor CLEAR NRG LLC Lender 33527 5TH PL SW CLEAR NRG LLC CLEARNL896CP (2/17/17) Occupancy Load FEDERAL WAY WA 98023 932 N 127TH ST 932 N 127TH ST SEATTLE WA 98133-8031 SEATTLE WA 98133-8031 Census Category: 434 - Residential altladd - no Includes: #1 Occupancy #I-- Construction Type..............srly - B Occupancy #I - Class ......................................... Occupancy # 1 -Use ................... a...... sidence t family) #2 0 of units #4 0 UWAF unit InOrman N / Additional Sq. Feet - Basement...................0 echanical to be Included? .................................... es Plumbing to be Included?.......................................Yes (1 N? Nkch;3p cal Fixtures Fans....................... .... VPlumbing Fixtures Dra' .................... Lavatories....................................... 1 Showers...................... Water os ............................... 1 PERMIT EXPIRES Monday, May 2, 2016 Permit Issued on Wednesday, November 4, 2015 Ihere certify that the above information is correct and that the construction on the above described property and the ccupancy and he use will be in accordance with the laws, rules and regulations of the State of Washington or and the City of Federal Way.ner r agent: Date: (1 1$ Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load Floor Areas . ft. 0 Ad? New / Additional Sq. Feet - 3rd Floor..................0 Occupancy #I-- Construction Type..............srly - B Occupancy #I - Class ......................................... Occupancy # 1 -Use ................... a...... sidence t family) #2 0 of units #4 0 UWAF unit InOrman N / Additional Sq. Feet - Basement...................0 echanical to be Included? .................................... es Plumbing to be Included?.......................................Yes (1 N? Nkch;3p cal Fixtures Fans....................... .... VPlumbing Fixtures Dra' .................... Lavatories....................................... 1 Showers...................... Water os ............................... 1 PERMIT EXPIRES Monday, May 2, 2016 Permit Issued on Wednesday, November 4, 2015 Ihere certify that the above information is correct and that the construction on the above described property and the ccupancy and he use will be in accordance with the laws, rules and regulations of the State of Washington or and the City of Federal Way.ner r agent: Date: (1 1$ THIS CARD IS TO REMAIN ON-SITE �,n °F THIS Inspection Record Fed@rad Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 15 -105586 -00 -SF Address: 33527 5TH PL SW Project: MARK TETZLOFF FEDERAL WAY, WA 98023-6197 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Roof Sheathing (4220) Approved to install roofing By Date El Gas Piping (4125) Approved to release test By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 SWM Precon Site Mtg (4400) ❑ In.itial Erosion Control (4365) Floor Sheathing (4105) Plumbing Groundwork (4190) - Mechanical (4065) Approved Approved to install mud & tape To be done prior to breaking ground Approved Approved to cover By Date By Date By Date Roof Sheathing (4220) Approved to install roofing By Date El Gas Piping (4125) Approved to release test By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Underfloor Framing (4285) Approved Floor Sheathing (4105) ti Date - Mechanical (4065) Shear Walls (4245) Approved to install mud & tape Approved to sheath floor Approved Approved Approved to install flooring Date By Approved to install siding By Date By Date Date By Date Roof Sheathing (4220) Approved to install roofing By Date El Gas Piping (4125) Approved to release test By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Mechanical Rough -in (4165) Approved By Date Interim Erosion Control (4370) Approved By Date Insulation (4150) Approved to instal, wallboard By Date Rough Plumbing (4230) Approved By ,- ., ti Date - Mechanical (4065) Right of Way Approved to install mud & tape Fire/Draft Stops (4095) Approved Approved By Date By Date By Framing (4120) Approved to insulate By Date Mechanical Rough -in (4165) Approved By Date Interim Erosion Control (4370) Approved By Date Insulation (4150) Approved to instal, wallboard By Date Gypsum Wallboard Nailing (4130) Final Erosion Control (4375)Final Final - Building (4050) - Mechanical (4065) Right of Way Approved to install mud & tape Approved Approved Date Date Approved By Date By Date By Date Final - Plumbing (4075) 1:1Approved Final - Building (4050) Approved Right of Way By Approved By Date Date By Date Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date F s � GT. of Federal Way REC0 VED NOV 2015 CITY OF FEDERAL WAY CDS PERMIT APPLICATION PERMIT NUMBER _ 1 �/ 55 — TARGET DATE I ' SrrE AaaREss SmlmiiiNrr t 33 6_21T� PROJECT VALUATION $ 38f7vo. cs� ZOl"G (LS (0 ASSESSOR'S TAV PARCEL i 7 2. `_j 8 b S- O O 5� O TYPE OF PERMIT BuIM12% PLUMBING �<MEcHANJCAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT A PROJECT DESCRIPTION{ Detailed description of work to be included on this permit only NAME Kw 1"t• �ef�Io� :: 6 (4S PROPERTY OWNER . AIIdNG ADDRBs - 35Z 7 5�` ?L 50 "'-33'5&7 .71 E cNkSarJ C= Fe vJ WA � 9.9023 { L . C4�A NAM ADDRESS . 127�H` 3Z. T CONTRACTOR `•►T 5,,,-cirt-E I saT VA STATE C7'E s EXPBtATiOlI TE FEDERAL WAY BIISM:88 LICENSE t CGDE? NCEI �G S(/�(� N"'mCToG OT t 3t S N AD hi Z Tl"I V r APPLICANT ` st A -rac- Wh '`��it 33 Zo(o . 70?• 9719 RAM � rc. PRIMARY PaoNB PROJECT CONTACT +` c., AD �9 � ' fi r' aIA C5 Q �=G �Z E-UAM rrhe individual to receive and respond to all correspondence concerning this application) �J W6. _ ST h z>P p8S j 2 (o TAX PROJECT FINANCING NAME OWNER -FINANCED Required value of $5,000 or more NAWNG ADDRESS, CITY. STATE. Z@ PHONE tRCW 19.22095) I certify under penalty of perjury that I am the property oumer or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized bg the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for comptiance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold the City of F Way as to any dabs (including costa, expenses, and attorneys' fees scarred do def of c[aim), may be made by any person, including the undersigned, and fisted against the city. the investigation and but only where each of reldance of the city, including its officers and employees, upon the accuracy of the information supp ' the as t th' Uw0cation. e� 2 DATE Z 3 SIGNATURE ::n- PRINT Bulletin #100 —January 1, 2013 Page 1 of 3 kMandoutsWetmit Application 0, 1l� VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ 5w. d O Indicate how many of each #me officture to be installed or relocated as peut of this project. Do not &wWde res to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS (commmiQ BOILERS FURNACES HOT WATER TANKS (r—) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES GENERAL INFORMATION CRITICAL R SO�v"tti4��- WATER P -I/R1�S�riG%SEWtERPURVEYOR VALUE OFPLUM&WO WORK PLUMBING PERMIT EXISTnfGIPZMOUS USS LOT SIZE (fn Sgeere Feet) p� $ ! 7,00.00 Indkate how ynany of each fime o re to be installed or relocated as of this project. Do not include ex1st&wftxtures to remain. BATHTUBS (m•91ab/9bmw Oomba) LAVS tN—d sum TOILETS _L WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS (s(�a/uta" WATER HEATERS (fid HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL R SO�v"tti4��- WATER P -I/R1�S�riG%SEWtERPURVEYOR VA1,UZ OF 87QSMO TRUMOVENIENTS EXISTnfGIPZMOUS USS LOT SIZE (fn Sgeere Feet) p� E%I8TIR6 FIRE SYSTEM? ❑Yes No PROPOSED FIRE S R SYSTEMA ❑Yes No %iVjV11VinW%L JjjL— 1fFa VV1Z73""AX ivi% AREA DESCRIPTION Arca Occupancy Groups) Construction p of Stories Additional information is Square Feet ' ::. ♦\WPI �II�a : ..� -: � . '.. . ADDITION COMMERCIAL - REMODEL/nNANT IWRO EVEIVENTSN NTSNE S AREA DESCRIPTION Area Occupancy Groups) Construction 0 of Stories Additional Information in Square Feet TOTAL.. BUQ.DINa, _ . TzwANT AREA ONLY pI20JECT ARFA ONLY Bulletin #100 — January 1. 2013 Page 2 of 3 k WandoutsTennit Application