13-101612City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax. (253) 835-2609
Project Name: GERASIMOV
Project Address: 30055 6TH AVE SW
Building - Single Family
Permit #: 13 -101612 -00 -SF
Project Description: ADD - Raise roof of existing shed to add loft storage.
Inspection Request Line: (253) 835-3050
Parcel Number. 039600 0010
Owner
INTEGRAL INVESTMENTS NV
ARRIIcan
SERGEY GERASIMOV
Contractor
OWNER IS CONTRACTOR
Lender
LLC
30055 6TH AVE SW STE 200
30055 6TH AVE SW STE 200
FEDERAL WAY WA 98023
FEDERAL WAY WA 98023
Census Category: 434 - Residential alt/add - no change in number of units
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:-
Floor
oadFloor Areas . ft 0 1 0 0 0
Additional Permit Information
New / Additional Sq. Feet -1 st Floor .................... 0 New / Additional Sq. Feet - 2nd Floor ................... 0
New / Additional Sq. Feet - 3rd Floor ................. —0 New / Additional Sq. Feet - Basement .................. 0
New / Additional Sq. Feet - Deck ......................... 0 New / Additional Sq. Feet - Garage....................... 0
Mechanical to be Included?...................................No New / Additional Sq. Feet - Other .......................... 0
Plumbing to be Included9......................................No New / Additional Sq. Feet - Total..........................
No Fixtures Associated With This Permit It
PERMIT EXPIRES Wednesday, November 20, 2013
Permit Issued on Friday, May 24, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent 21" Date: 5, 2 c(, 'J
Y OF 446t THIS CAIS TO REMAIN ON-SITE
FedRD
Federal Way Construction ION Ins sctio nRecord
INSPE
PERMIT #: 13 -101612 -00 -SF Address: 30055 6TH AVE SW
Project: INTEGRAL INVESTMENTS NV LLC FEDERAL WAY, WA 98023-3520
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ SWM Precon Sit
Approved
By Date
Foundation Wall (4115)
Approved to place concrete
By Date
Underfloor Framing (4285)
Approved to sheath floor
By VA,6 Date 10 t0
To be done prior to breaking ground
BY Date
Drainage/Downspout (4040)
Approved to backfill
BY Date
0 Floor Sheathing (4105)
Approved to install flooring
By V -A6 Date 10 N 113
Footings/Setback (4l
Approved to place concrete
BY Date
0
Slab/Concrete Floor (4255)
Fire/Draft Stops (4095)
Approved to place concrete
By
Date
1
Approved
Shear Walls (4245)
Approved to install siding
By
Date
❑ Kooi hheathing (4220)
Approved to install roofing
Fire/Draft Stops (4095)
Interim Erosion Control (4370)
1
Approved
Approved
By M6 Date 10 Q
t3
BY
Date
BY
Date
rior to scheduling a Framing inspection;
Framing (4120)
Insulation (4150)
rical, Plumbin & Mechanical Rou h -in and
g g
E
Approved to insulate
Approved to install wallboard
raft Stop inspections must be signed -off and
approved IBC 109.3.4
By
Date
By
Date
Gypsum Wallboard Nailing (4130)
Approved to install &
0
Final Erosion Control(4375) 4375
Final -Building (4050)
mud tape
r
App oved
Approved
By Date
By
Date
BY
Date
Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date —j
By Date