13-102149Mechanical
City Ser FILE Permit #: 13 -102149 -00 -ME
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line:
Ph: (253) 835-2607 Fax: (253) 835-2609 � � 253 835-3050
Project Name: GRGURICH
Project Address: 33103 30TH AVE SW Parcel Number: 954280 0950
Project Description: REPLACE 60K GAS FURNACE
Owne
ARRlicant
Contractor
FRANK P GRGURICH
NORTHWEST PERMIT/ WESCO
PACIFIC AIR SYSTEMS (GENERAL)
33103 30TH AVE SW
1345 W GULF RD
PACIFAS093KA (9/8/13)
FEDERAL WAY WA
POINT ROBERTS WA 98281
12811 PACIFIC HWY SW
98023
LAKEWOOD WA 98499
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanics! Fixtures '
of
Furnaces ......................................... 1
PERMIT EXPIRES Monday, Novembi.00
r, 2013
Permit Issued on Wednesday, Ma 2013
1 hereby certify that the above information is correct and th nstruction on th ve described property and
the occupancy and the use will be in accord cerw I ,rules an of the State of Washington
_ _ an ederal Way.
Owner or agent:
�xQ
i
Date:
r THIE,CARD IS TO REMAIN ON-SITE
MY CW Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 13 -102149 -00 -ME Address: 33103 30TH AVE SW
Project: FRANK P GRGURICH FEDERAL WAY, WA 98023-2721
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card
Mechanical Rough -in (4165)Gas
Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
1:1Approved
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Date
Rough Electrical
Approved
0
Final Electrical
Approved
1:1Approved
Right of Way
By
Date
By
Date
By
Date