10-103989A City of Federal Way
Corrimunity Development Services
P.O. Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: RANKOS
Project Address: 30855 50TH PL SW
Project Description: Heat pump and air handler replacement
Mechanical
Permit #: 10-103989-00-M E
Inspection Request Line: (253) 835-3050
Parcel Number: 112103 9058
Owner
li n
Contractor
GREGORY AND DEANNA RANKOS
CHRIS CALHOUN
NARROWS HEATING & AIR
30855 50TH PL SW
NARROWS HEATING & A/C
CONDITIONING (GENERAL)
FEDERAL WAY WA 98023
5121 S BURLINGTON WAY
NARROI*216J3 (4/5/12)
TACOMA WA 98409
5121 S BURLINGTON WAY
TACOMA WA 98409
arm - R a a z
a" ��,a.�
Mechanical Valuation............................................7000.00 Is this an Online or O.T.C. application? ................. Yes
14
Air Handling Units ......................... 1 " Compressors / Heat Pumps......:..... 1
PERMIT EXPIRES Saturday, March 19, 2011
Permit Issued on Monday, September 20, 2010
1 hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
AA ''and the rrCity of Federal Way. [�(
Owner or agent: Date: -/�2Q In
FILE
T`H'IS CARD IS TO REMAIN ON-SITE
Federal Way Construction Inspection Record
y INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 10 -103989 -00 -ME Address: 30855 50TH PL SW
Owner: GREGORY AND DEANNA RANKO%c FEDERAL WAY, WA 98023-2008
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0
Mechanical Rough -in (4165)El
Gas Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
El
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Date
El
Rough Electrical
Approved
Final Electrical
Approved
El
Right of Way
Approved
By
Date
By
Date
By
Date