10-102914City of Federal Way
Community Development Services
P.O. Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: BERLAGE
Project Address: 34518 5TH PL SW
Building - Single Family
Permit #: 10-102914-00-S F
Inspection Request Line: (253) 835-3050
Parcel Number: 132170 0190
Project Description: ADD - Construct (2) decks (1 with walkway) both include stairs down to the ground
Owner
Applicant
Contractor
Lender
BRIAN BERLAGE
JAY CLOUSE
34518 5TH PL SW
34518 5TH PL SW
7318 22ND AVE N
FEDERAL WAY WA 98023-8300
FEDERAL WAY WA 98023-8300
SEATTLE WA 98117
Census Category: 434 - Residential altladd - no change in number of units
Includes: # 1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Areas . ft. 0 0 1 0 1 0
PERMIT EXPIRES Wednesday, January 5, 2011
Permit Issued on Friday, July 9, 2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: t AU Date: c1
CITY 6F V;&�'
Federal Way
PERMIT #:
Owner:
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
10 -102914 -00 -SF Address: 34518 5TH PL SW
BRIAN BERLAGE FEDERAL WAY, WA 98023-8300
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑
SWM Precon Site Mtg (4400)
Final Erosion Control (4375)
Initial Erosion Control (4365)
E]
Footings/Setback (4110)
Approved
Approved
Approved
To be done prior to breaking ground
By
Approved to place concrete
By
Date
By
Date
By
Date711
❑
Foundation Wall (4115)
Final Erosion Control (4375)
Drainage/Downspout (4040)
Final - Building (4050)
Approved
Slab/Concrete Floor (4255)
Approved
Approved to place concrete
By
Date
Approved to backfill
By
Date
Approved to place concrete
By
Date
By
Date
Framing (4120)
By
Date
Approved to insulate
❑
By
13
By
Underfloor Framing (4285)
Floor Sheathing (4105)
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
By
Date
Roof Sheathing (4220)
Approved to install roofing
By • Date
Prior to scheduling a Framing inspection;
Electeical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
Gypsum Wallboard Nailing (4130)
Fire/Draft Stops (4095)El
Final Erosion Control (4375)
Interim Erosion Control (4370)
Final - Building (4050)
Approved
Right of Way
Approved
Approved
By
Date
By Date
By
Date
Date
By
Date
Framing (4120)
Insulation (4150)
Approved to insulate
Approved to install wallboard
By
Date
By
Date
Gypsum Wallboard Nailing (4130)
Rough Electrical
Approved
Final Erosion Control (4375)
❑
Final - Building (4050)
Approved to install mud & tape
Right of Way
Approved
Date
Approved
By Date
By
Date
Date
By
Date
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way
By
Date
By
Date
By
Date