Loading...
13-101890w City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2807 Fax: (253) 835-2809 it Plumbing Permit #: 13 -101890 -00 -PL Inspection Request Line: (253) 835-3050 Project Name: PRECISION COLLISION Project Address: 1908 S 341ST PL Unit 1 Parcel Number: 390380 0070 Project Description: Installation of indoor carwash bay with oil/water intercepter. Owner ARRIIcant Contractor PRECISION COLLISION AUTO BODY SUPERIOR PLUMBING INC SUPERIOR PLUMBING INC 1908 S 341ST PL SUITE 1 11631 23RD AVE SW SUPERP102304 (9/28/13) FEDERAL WAY WA 98003 BURIEN WA 98146 11631 23RD AVE SW BURIEN WA 98146 Plumbing Fixtures Drains............................................. 1 PERMIT EXPIRES Saturday, Permit Issued on Monday, I hereby certify that the above information is correct and that the the occupancy and the use �V?V accordance with the laws, and the City of Feder Owner or agent 5k 201 on the above described property and ulaVns of the State of Washington cm of V `3 Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON-SITE Construction Insection Record INSPECTION REQUESTS: (253) 835-3050 13 -101890 -00 -PL Address: 1908 S 341ST PL Unit 1 PRECISION COLLISION AUTO BOI FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Final - Plumbing (4075) Approved By Date ❑ Rough Electrical E]Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Plumbing Groundwork (4190) Rough Plumbing (423) Gas Piping (4125) Approved to cover Approved Approved to release test By Date ,I By By Date By Date 0 Final - Plumbing (4075) Approved By Date ❑ Rough Electrical E]Final Electrical Right of Way Approved Approved Approved By Date By Date By Date 'RFcfAV J Federal Way �� APR 2 9 20i 3 PERMITIPPLICATION cir' OF FE�EJ�Q` PERMIT NUMBER 3 _ 1 dS ±!2 V _ TARGET DATE(Rc SITE ADDRESS SUITE/UNIT # PROJECT VALUATION ZONING A33ESSOR' ARCEL # TYPE OF PERMIT ❑ BUILDING UMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT 15( ' i cm PROJECT DESCRIPTION Detailed description of work to ` 1)< be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER _ ') �;-` CJL, MAIILIIIG ADDRESS E-MAIL STATE ZIP N i nL)0U- PHONE L?Z u MA1MD90 ADDRESS 1` S E-M&H, \tM I CONTRACTOR CITY STATE ZIP `�('/� /' FAS WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # NAME PRIMARY PHONE APPLICANT MAILING ADDRESS E-MAIL CITY STATE ZIP FAX CONTACT mm'�U.A"PROJECT PRIMARY PHONE 2c't—O KTN G ADDRESS MALI (The individual to receive and respond to all correspondence CITY _ ,STATEzi FAX concerning this application) PROJECT FINANCING NAME OWNER -FINANCED Required value of $5,000 or more (RCW 19.27.095/ MAILING ADDRESS, CITY, STATE, ZIP PHONE I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied he city as a part of this application. �A SIGNATURE: DATE e�Zq 13 yJ,, PRINT N Jim (11 .16 / Bulletin # 100 — January 1, 2013 Pagel of 3 k:\Handouts\Permit Application W Iw D 4 General Proiect Notes APPLICABLE CODES On July 1, 2010, the following codes with Washington State Amendments will be in effect: - 2009 International Building Code, WAC 51-50 (Including the 2009 International Existing Building Code) 2009 International Mechanical Code, WAC 51-52 2009 International Fuel Gas Code 2009 International Fire Code, WAC 51-54 2009 Uniform Plumbing Code, WAC 51-56 and 51-57 (UPC) 2009 Washington State Energy Code I. GENERAL A. The Contractor shall verify all dimensions, elevations, and site conditions before starting work; and the Engineer shall be immediately notified, in writing, of any discrepancies. B. The Contractor shall determine the location of utility services in the area to be excavated before beginning excavation. Do necessary excavation to complete the work shown. The excavation shall be principally of the open trench methods meeting safety requirements. C. All material and workmanship shall conform to the requirements of the following Codes (latest edition): 1. American Concrete Institute (ACI) 2. Concrete Reinforcing Steel Institute (CRSI) Manual of Standard Practice (for placing and detailing of all reinforcing) 3. American Institute of Steel Construction (AISC) 4. American Welding Society (AWS) Standards for Welding as modified by A.I.S.C. Spec D. The scope of this project includes, but is not limited to, the complete furnishing and installation of all equipment, materials, components and labor for 2009 Uniform Plumbing Code, WAC 51-56 and 51-57 (UPC). E. Proper separation of sewer and water shall be maintained to comply with 2009 Uniform Plumbing Code, WAC 51-56 and 51-57 (UPC). F. The plumbing system shall be tested in accordance with 2009 Uniform Plumbing Code, WAC 51-56 and 51-57 (UPC). G. Co-ordinate all installations with other trades. H. The Contractor is responsible for all utility hook-ups and any costs associated with the utilities. It is the Contractor's responsibility to contact the utility companies. I. The Contractor shall make all provisions for entry of his equipment including building openings and do necessary work to restore site and building to original condition. J. Each Contractor shall mark a set of drawings to show as -built conditions. This work shall be completed and accepted by Engineer before approval of final payment. K. Each Contractor shall submit four (4) sets of shop drawings for all equipment. GENERAL NOTE 1. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS PRIOR TO BIDDING AND BEGINNING ANY WORK. _ 2. INSTALL PLUMBING SYSTEM PER STATE AND LOCAL CODES. EXISTING SHOP OIL / WATER INTERCEPTOR 4"o SS CLEAN OLDCASTLE OUT FEX' MODEL# EX RR OW 25 SA WITH SEALED EX 4"o SS _o MECH COVER -- a zW HU N LL W WO S. 341 ST PLACE (-, OVERALL PLAN 1 " = 40'-0" -- CLEANOUT XISTING TRENCH DRAIN REMOVE FLOOR AREA FOR INSTALL OF OIL AND WATER SEPARATOR. INSTALL NEW 6" THICK CONCRETE SLAB W/ #4' 18" OC EW. SLOPE FLOOR TO TRENCH DRAIN. 3"o CAST IRON VENT THROUGH ROOF RECEIVED APR 2 9 2013 CITY OF FEDERAL WAY CDS -GROUP Ona firm - stars m finish'" ARCHITECTS • ENGINEERS • PLANNERS LAND SURVEYORS • SCIENTISTS Mlmesota: MankAo • Fm1baJt Iowa: S- Lake • Algona • Sac City Wish: La Crosse Web: w is-q,Pcam DATE: 4-23-13 THIS DOCUMENT IS THE PROPERTY OF 18S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT PRECISION COLLISION WASH -BAY UP GRADE 1908 S. 341ST PLACE FEDERAL WAY WASHINGTON I PROJECT NO. 13-15396 1 FILE NAME 15396 Federal Way.rvt REVIEWED BY BDG ISSUE DATE 423.13 CLIENT PROJECT NO. TITLE OVERALL PLAN REFERENCE SCALE I SHEET 1"=1" A1.21 0 1/4"1/2" 1" 2' Vv A 5'- 2 1/2" - - - - - - -- - - - - --- - - -- r- 3"e VENT 1 1/4" DIA LIFT HOLE 1 EACH SIDE, 2 SIDES CONTRACTOR TO PLUG (GROUT) AFTER INSTALLATION INLET PIPE WITH SAMPLING TEE BY OTHERS N N 0 N t N N 7" DIA HOLE FLOW DIFFUSER BAFFLE PIPE THAT PENETRATES ROOF STORM COLLAR GALVANIZED STEEL PLATE AND CONE FLASHING EXISTING ROOF TO REMAIN, MAINTAIN ROOF WARRANTY SEALANT - STAINLESS STEEL t CLAMP RING STRIP IN FLASHING AS PER ROOFING MFR'S STANDARD DETAIL POLYISOCYANU RATE INSULATION METAL ROOF DECK 1" CLR, TYP GALVANIZED CLOSURE COLLAR TYPICAL PIPE ROOF PENETRATION NOT TO SCALE GALVANIZED "C" CHANNEL SLOT FOR BAFFLE AND WEIR PLATES, TYPICAL 3/4" INSERT WITH HEX BOLT 2 EACH SIDE, 2 SIDES I FOUTLET PIPE WITH SAMPLING TEE BY OTHERS Wo VENT o, F - 7" DIA HOLE TRENCH DRAIN WITH REMOVABLE GRATE CONCRETE TRENCH DRAIN ENCASEMENT INSTALLED PER MANUFACTURERS INSTRUCTIONS a 2 TRENCH DRAIN DETAIL QDGROUP -l.n ARCHITECTS• ENGINEERS• PLANNERS• LAND SURVEYORS • SCIENTISTS Minn— Wr"o- FarlbMt ima: Swim Lake • Algona- Sac City Wlxonsin: U Crosse Web: w is-a,ocom THIS DOCUMENT IS THE PROPERTY OF IdS GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPUCATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT PRECISION COLLISION WASH -BAY UP GRADE 1908 S. 341ST PLACE FEDERAL WAY WASHINGTON OIL RETAINING BAFFLE U FLOOR - CLEANOUT ACCESS COVER Revision sDescde = Mark Oafs Description GRIT/SLUDGE a~. RETAINING WEIR er p , t cr 00 Q L CAST IRON CLEANOUT FERRULE AND PLUG PROJECT NO. 1315398 14 °000°0 GRANULAR BACKFILL, FILENAME 15398Fed" W .nrt MECHANICAL COMPACTED DRAWN BY URG V- 5 1/2" 8" 1 ' - 10 1/2" 1 ' - 2 1/2' a DESIGNED BY Designer REVIEWED BY BDG ISSUE DATE4-23-13 N CLIENT PROJECT NO. GENERAL NOTES: 1. ALL BAFFLES AND WEIRS TO BE STEEL. 2. CONTRACTOR TO SUPPLY AND INSTALL ALL PIPING AND SAMPLING TEES, GROUT ALL PIPES, FILL WITH CLEAN WATER PRIOR TO START-UP OF SYSTEM AND VERIFY ALL BLOCKOUT SIZES AND LOCATIONS. 3. PROVIDE WITH SEALED COVER. ZIL/WATR INTERCEPTOR TO SCALE CCLEANOUT DETAIL LNOT TO SCALE TITLE MECHANICAL DETAILS SHEET A1.22 J r 1 1/4" DIA LIFT HOLE 1 EACH SIDE, 2 SIDES CONTRACTOR TO PLUG (GROUT) AFTER INSTALLATION INLET PIPE WITH SAMPLING TEE BY OTHERS N N 0 N t N N 7" DIA HOLE FLOW DIFFUSER BAFFLE PIPE THAT PENETRATES ROOF STORM COLLAR GALVANIZED STEEL PLATE AND CONE FLASHING EXISTING ROOF TO REMAIN, MAINTAIN ROOF WARRANTY SEALANT - STAINLESS STEEL t CLAMP RING STRIP IN FLASHING AS PER ROOFING MFR'S STANDARD DETAIL POLYISOCYANU RATE INSULATION METAL ROOF DECK 1" CLR, TYP GALVANIZED CLOSURE COLLAR TYPICAL PIPE ROOF PENETRATION NOT TO SCALE GALVANIZED "C" CHANNEL SLOT FOR BAFFLE AND WEIR PLATES, TYPICAL 3/4" INSERT WITH HEX BOLT 2 EACH SIDE, 2 SIDES I FOUTLET PIPE WITH SAMPLING TEE BY OTHERS Wo VENT o, F - 7" DIA HOLE TRENCH DRAIN WITH REMOVABLE GRATE CONCRETE TRENCH DRAIN ENCASEMENT INSTALLED PER MANUFACTURERS INSTRUCTIONS a 2 TRENCH DRAIN DETAIL QDGROUP -l.n ARCHITECTS• ENGINEERS• PLANNERS• LAND SURVEYORS • SCIENTISTS Minn— Wr"o- FarlbMt ima: Swim Lake • Algona- Sac City Wlxonsin: U Crosse Web: w is-a,ocom THIS DOCUMENT IS THE PROPERTY OF IdS GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPUCATED WITHOUT PRIOR WRITTEN CONSENT. PROJECT PRECISION COLLISION WASH -BAY UP GRADE 1908 S. 341ST PLACE FEDERAL WAY WASHINGTON OIL RETAINING BAFFLE U FLOOR - CLEANOUT ACCESS COVER Revision sDescde = Mark Oafs Description GRIT/SLUDGE a~. RETAINING WEIR er p , t cr 00 Q L CAST IRON CLEANOUT FERRULE AND PLUG PROJECT NO. 1315398 14 °000°0 GRANULAR BACKFILL, FILENAME 15398Fed" W .nrt MECHANICAL COMPACTED DRAWN BY URG V- 5 1/2" 8" 1 ' - 10 1/2" 1 ' - 2 1/2' a DESIGNED BY Designer REVIEWED BY BDG ISSUE DATE4-23-13 N CLIENT PROJECT NO. GENERAL NOTES: 1. ALL BAFFLES AND WEIRS TO BE STEEL. 2. CONTRACTOR TO SUPPLY AND INSTALL ALL PIPING AND SAMPLING TEES, GROUT ALL PIPES, FILL WITH CLEAN WATER PRIOR TO START-UP OF SYSTEM AND VERIFY ALL BLOCKOUT SIZES AND LOCATIONS. 3. PROVIDE WITH SEALED COVER. ZIL/WATR INTERCEPTOR TO SCALE CCLEANOUT DETAIL LNOT TO SCALE TITLE MECHANICAL DETAILS SHEET A1.22 STRUCTURAL SPECIFICATIONS If. FOOTINGS AND FOUNDATIONS A. Soil Bearing Design Value: 1. 1,500 psf 2. Bearing value is to be verified in field by Geotechnical Engineer. B. Protect foundation excavations from frost; do not place concrete on frozen ground. III. REINFORCED CONCRETE A. Concrete shall have a minimum compressive strength (f'c) at 28 days and a Maximum Water/Cement Ratio (MaxW/CR)as follows: 1. Floors on Grade f'c-3500 psi MaxW/CR=0.45 B. Cement shall conform to ASTM C150, Type I. C. Ready -mix concrete shall be mixed and delivered in accordance with ASTM C94. D. Concrete work shall conform to all requirements of ACI 301 (latest PLUMBING SPECIFICATIONS 1. install plumbing system per state and local codes. 2. Pipe Hangers and Supports: A. Hangers for Pipe Sizes 1/2 to 1-1/2 inches malleable iron, adjustable swivel, split ring. B. Hangers for Pipe Sizes 2 to 4 inches and Cold Pipe Sizes 6 inches and Over: Carbon steel, adjustable, clevis. C. Multiple or Trapeze Hangers: Steel channels with welded spacer and hanger rods. D. Wall support for pipe sizes to 3 inches: Cast iron hook. E. Vertical Support: Steel riser clamp. F. Copper Pipe Support: Carbon steel ring, adjustable, copper plated. G. Support horizontal piping as follows: edition) "Specifications for Structural Concrete for Buildings", Pipe Size Max Hanger Spacing Hanger Diameter except as modified by these Notes. 1. 1/2" to 1-1/4" 6'-0" 3/8" DRAWN BY LAR/JRG 2. 1-1/2" to 2" 10'-0" 3/8" E. Admixtures may be used with prior approval of the Engineer. Admixtures 3. 2-1/2" to 3" 10'-0" 1/2" shall comply with ASTM C494 and be of a type that increases the 4. 4" to 6" 10'-0" 5/8" workability of the concrete, but shall not be considered to reduce the 5. PVC (All Sizes) 2'-8" 3/8" specified minimum cement content (calcium chloride shall not be used). 6. 8" and Under C.I. 5'-0" 5/8" Bell and Spigot F. Contractor shall submit mix designs for approval 14 days prior to (or No -Hub) and fabrication and installation. All concrete mixes shall be designed at joint and certified by a materials testing company. H. Shield for Insulated Piping 2 Inches and Smaller: 18 gauge galvanized G. Place vapor barrier directly below floor slab. Wet cure slab for a minimum steel shield over insulation in 180 degrees segments, minimum 12 inches long of seven (7) days. at pipe support. H Concrete floor shall be cured in accordance with ASTM C309. Concrete I. Shield for Insulated Piping 21/2 Inches and Larger (Except Cold Water floor shall be protected from moisture loss for a minimum of 14 days, Piping): Pipe covering protective saddles. using an approved sheet membrane in accordance with C171, J. Steel Hanger Rods: Threaded both ends, threaded one end, or 1. Slabs to be left exposed: 'Steel trowel' as described in ACI 302. 1R, minimizing continuous threaded. burnish marks and other appearance defects. K. Inserts: Malleable iron case of galvanized steel shell and expander J. Apply Chemical Curer/Sealer/Dustproofer/Hardener: Apply product per plug for threaded connection with lateral adjustment, top slot for manufacturer's instrucions. reinforcing rods, lugs for attaching to forms; size inserts to suit 1.) Acceptable Prodcut: Ashford Formula by Curecrete Distribution, Inc. threaded hanger rods. K. In areas with floor drains, maintain floor elevation at walls; pitch surcaces uniformly 3. Sleeves: to drains as indicated on drawings. IV. REINFORCING STEEL A. Bar reinforcement shall be ASTM A615, Grade 60. B. Minimum lap splices of reinforcing bars shall be as follows unless noted otherwise. 1. #4 Bars & smaller V-6" and staggered splices C. Concrete: Class B as defined in ACI 318-05. D. Reinforcing steel shall be provided with the following amounts of cover for cast -in-place concrete unless noted otherwise: 1. Concrete placed against earth.... 3" 2. Concrete surface (formed) exposed to earth or weather: a. #5 bar and smaller ................ 1-1/2" b. Stirrups & Ties ...................... 1-1/2" E. All reinforcing steel, anchor bolts, dowels, and inserts shall be secured in position with wire positioners, or equal, before placing concrete or grout. F. Contractor shall submit reinforcing steel shop drawings for approval before fabrication and installation. A. Sleeves for Pipes through Non -Fire Rated Floors: Form with 18 gauge galvanized steel. B. Sleeves for Pipes through Non -Fire Rated Beams, Walls, Footings and Potentially Wet Floors: Form with steel pipe or 18 gauge galvanized steel. C. Set sleeves in position in formwork. Provide reinforcing around sleeves. D. Where piping or ductwork penetrates floor, ceiling or wall, close off space between pipe or duct and adjacent work with fire stopping insulation and caulk seal airtight. Provide close fitting metal collar or escutcheon covers at both sides of penetration. E. Caulk: Silicone sealant of quality specified in Division 1. F. Install chrome plated steel escutcheons at finished surfaces. 4. Sanitary sewer system: underground soil, waste and vent piping shall be service weight cast iron pipe with fittings conforming to ASTM -74. Joints shall be made using elastomeric compression type gasket. Hubless cast iron pipe and fittings will be acceptable. Plastic pipe Schedule 40 (ABS or PVC) and fittings conforming to ASTM D2661 and D2665 laid on a continuous granular bed shall be acceptable. Solvent weld joints in PVC pipe shall be made using a primer which is of contrasting color to the pipe and cement. The Contractor shall verity location of existing sanitary sewer. 5. Above ground drain, waste and vent piping shall be hubless cast iron pipe and fittings. Plastic pipe Schedule 40 (ABS or PVC) shall be acceptable, except that no stack or horizontal drain piping of plastic pipe shall exceed 35 feet in total length. Solvent weld joints in PVC pipe shall be made using a primer which is of contrasting color to the pipe and cement. 6. Plumbing Fixtures & Equipment: A. Floor Trench Drain — MIFAB T1400 trench drain shall be provided and installed by the contractor. The contractor shall provide the connection to the plumbing system. B. Clean Outs — CO: WADE #W6000 Series. C. Oil / Water Separator — Model OW 25 -SA: Shall be by Oldcastle precast, or approved equal. Tank shall have 100 gallon capacity. Tank shall have a sealed cover. Inlet and outlet shall be 4" diameter and vent shall be 3" diameter. Exposed vapor vent piping shall be cast iron. END OF SPECIFICATION MROUP Am firm - Blatt Ia ❑nisM' ARCHITECTS• ENGINEERS• PLANNERS• LAND SURVEYORS • SCIENTISTS Mlnnesma: Mank—• Farib.11 Iowa Stam Lake • Algona - Sac City Wtto h: La Crosse Web: www.is-gr6com nATI=• A -91-1't THIS DOCUMENT IS THE PROPERTY OF 18S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT, PROJECT PRECISION COLLISION WASH -BAY UP GRADE 1908 S. 341ST PLACE FEDERAL WAY WASHINGTON PROJECT NO. 1315396 FILE NAME 15396 Federal Wa .rvt DRAWN BY LAR/JRG DESIGNED BY Designer REVIEWED BY BDJ ISSUE DATE 04-23-13 CLIENT PROJECT NO. TITLE SPECIFICATIONS Sr=EET A1.23