12-103880� t
t
• Mechanical
City of Federal Way
Community & Econ. Dev. Services Permit #: 12 -103880 -00 -ME
333 W 8th Ave S
Federal Way, WA 98003 FILE
Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (253) 835-3050
Project Name: SUNG
Project Address: 536 SW 336TH ST Parcel Number: 729805 0110
Project Description: like for like gas furnace replacement
Furnaces ......................................... 1
PERMIT EXPIRES Mo F
Permit Issue am; y,
I hereby certify that the above informs, ct that the
the occupancy and the use will be in 40 nce the laws,
and Q of Fed
rI NOW
Owner or agent: 0 111%111
***41 P/ \ 9
PR012
on on the above described property and
regulations of the State of Washington
Date:
THIS CARD IS TO REMAIN ON-SITE
CITY OF - Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 12 -103880 -00 -ME Address: 536 SW 336TH ST
Project: JENNY SUNG FEDERAL WAY, WA 98023-8308
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El
Mechanical Rough -in (4165)
Gas Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Date
El
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
CITY OF Building Division
33325 Eighth Avenue South
Federal Wa Federal Way, 98003-6325
4:*��4Ly Phone 253-835-2607 Fox
253-835-2609
CORRECTION NOTICE
ADDRESS: S% PERMIT#: /z-/03eev
/ ice w,:1- 7Z5)'- Ze2Wa,15- R�/u-
Washington State Energy Code reference: 101.3.2.6 Mechanical Systems: Those
parts or systems which are altered or replaced shall comply with coon 503 of this
Code when a space -conditioning system is altered by the installation or replacement
Hanaler, outdoor
condensing unit of a split system air conditioner or heat pump, cooling or heating
replacement space -conditioning equipment shall be sealed, as confirmed through
._1A .,o. a^�' �� -,,a a:iwoetio igsiingin fe- d—'
sealing of existing duct systems as specified in the RS -33, to one of the following
w4iiremmt- F.ereptin - 1 T An t e;,0- that 9rp .t. o. A tO I--- Y 1_
previously sealed as confirmed through field verification and diagnostic testing in
accordance with procedures in RS -33. 2. Ducts with les- than 40 linear feet in
unconditioned spaces. 3. Existing duct systems constructed, insulated or sealed with
asbestos.
Z /!F1z ric.E:y`�'ecrayy-'
IF YOU HAVE QUESTIONS CALL ixb (253) 835- 2623
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835- 050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
DATE
/gIc
INSPECTOR
DO NOT REMOVE THIS NOTICE
Page _�_ of