Loading...
14-105052Electrical 04r of Federal Way Community & Econ. Dev. Services Permit #: 14-105052-00-E L 33325 FILE 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2807 Fax: (253) 835-2809Inspection Request Line: (25 3) 835-3050 Project Name: HARRELSON Project Address: 32734 3RD AVE SW Parcel Number: 926491 1570 Project Description: Remodel - adding/altering (8) circuits Owner MARILYN C HARRELSON ARRIIcant HEATHER VAN GUILDER Contractor MAPLE VALLEY ELECTRIC DAVID G HARRELSON MAPLE VALLEY ELECTRIC MAPLEVE904D5 (4/1/16) 32734 3RD AVE SW 26828 W MAPLE VALLEY HWY PMB 275 26828 MAPLE VALLEY HWY SUITE 275 FEDERAL WAY WA 98023-5647 MAPLE VALLEY WA 98038 MAPLE VALLEY WA 98038 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No Electrical Fixtures Circuits - Residential ...................... 8° PERMIT EXPIRES Sunday,itruction c 015 Permit Issued on Tuesday, Se0, : 014 I hereby certify that the above information is correct and th t on the above described property and the occupancy and the use will be in accordance with the la les and rggulations of the State of Washington and the City of F Way. Owner or agent: Date: crff1 Federal Way PERMIT #: Project: • THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 14 -105052 -00 -EL Address: 32734 3RD AVE SW MARILYN C HARRELSON FEDERAL WAY, WA 98023-5647 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. UFER Ground (4295) Ditch cover (403) ❑ Slab/Concrete Floor (4255) Approved By Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) 1:1Approved Temporary Power (4275) Service (4235) By Approved By Approved By Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By DateDate 1 B Y Date Final - Electrical (4055) Approved By Date Rough Electrical Approved 1:1Approved Final Electrical Right of Way -^ Approved By Date By Date By Date