Loading...
18-101510City of Federal way C—unity Development Dept - 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 8355-2607 Fax (253) 835-2609 Project Name: PAVILION APARTMENTS BLDG 9 Project Address: 1900 SW CAMPUS DR Building - Multi Family Permit #:18 -101510 -00 -MF Inspection Request Line: (253) 835.3050 Parcel Number: 132103 9103 Project Description: RPP - Repair/replace damaged decks as needed. No plumbing or mechanical. Units 201,202,203,204,301,302,303,304 Owner Applicant Contractor Lender PRIME CATALINA CAMPUS ISRAEL RODRIGUEZFULCRUM FULCRUM CONST BLDG SERVS OWNER IS LENDER DRIVE I LLC CONSTRUCTION AND BUILDING LLC 50 CALIFORNIA ST #2525 SERVICES LLC 12125 SW 2ND ST SAN FRANCISCO CA 94111 PO BOX 706 BEAVERTON OR 97005 BEAVERTON OR 97075 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? ..................................... No Number of Stories ................................................... 2 Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ No Total Valuation: 12,000.00 Permit for Building Shell Only? .............................. No PERMIT EXPIRES Saturday, 8 December, 2018 Permit Issued on Monday, June 11, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON-SITE V&- Federal WayConstruction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 1810151000 Address: 1900 SW CAMPUS DR Bldg 09 Project: PRIME CATALINA CAMPUS DRIVI FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 1❑ Initial Erosion Control (4365) ® Re -steel (4215) Footings/Setback (4110)3❑ Slab/Concrete Floor (4255) Foundation Wall (4115) Approved to backfill To be done PRIOR to breaking ground Approved to place concrete or grout rBy Approved to place concrete By Approved to place concrete By Date By By Date By Date ® DrainagdDownspont (4040) ® Re -steel (4215) ® Slab/Concrete Floor (4255) Interim Erosion Control (4370) Approved to backfill Approved to install roofing Approved to place concrete or grout rBy Approved to place concrete By Date By Date By Date Prior to scbedallag a Fra®log inspection; Underfloor Framing (4285) ® Floor Sheathing (4105) ® Shear Walls (4245) Interim Erosion Control (4370) Approved to sheath floor Approved to install roofing Approved to install flooring Approved Approved to install siding By Date By Date By Date Prior to scbedallag a Fra®log inspection; Roof Sheathing (4220)rBy Framing (4120) FhwDraft Stops (4095) Insubtion (4150) Electrical, Plumblatli & Mechanical Reagi-i Interim Erosion Control (4370) Approved to insulate Approved to install roofing Approved to install wallboard Approved Approved Approved By Date By Date By By Date Prior to scbedallag a Fra®log inspection; �3 Framing (4120) ® Insubtion (4150) Electrical, Plumblatli & Mechanical Reagi-i Approved to insulate Approved to install wallboard and Fire/Draft Stop i.spectlees swat be signed- Approved off and approved IBC 109.3.4 By Date By Date 5 Gypsum Wallboard Nailing (4130)® Suspended Ceiling rid 4265) 0 Final - S K F & R (4060) Approved to install mud & tape JBy Approved to drop file Approved By Date Date By Date 18 Final Erosion Control (4375) ® Final - Building (4050) Approved Approved By Date 10y�b Date ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date PE IT APPLICATION le2�rml6y .111--- tE) PERMIT CENTE ��rlve�e South +Federal Way, WA 98003-6325 253-835-2607 + FAX 253-8 609 + perynitcenter@cityoffederalway.com /�� APR 0 6 2018 ` �C( PERMIT NUMEER_L� _.' 1 5 t b -A PAYof FED[ J -ICI_ f ; UNITY DEVs, TE SITE ADDRESS g-3 SUITE/UNIT iF �% tnt,2oz�L�3, Ivy 'J v) C-�L"��C�J eta. �i L' W" VQ 1 Z. i 302 a3 30� PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL i 9 / O 21 pO0 - t 3 — ! — — — — TYPE OF PERMIT UILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT '�A t �' C>Ili 1k" (_ Ili PROJECT DESCRIPTION Detailed description of work to be included on this perrnit only NAME PRIMARY PHONE tQkf=- T Lt tJA- C to RS s`7 /- W 066 PROPERTY OWNER 4MLINGADDRESS l QC] 3� M 1S D�- E-MAIL �cl„ar Tr�Pr k WTE P 02-� �o �2 �)I� NAMEPHO1fE C -3- --63s MAILING ADDRESS E-MAIL CONTRACTOR - d ' x CITY STATE ZIP FAX 2, I WA STATE CONTRACTOR'S LICENSE i P EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE f -06 LC1ZC i 2 /tot K ZO-17- NAME i---�RJ M C© tJ T (C* -)-I _PWMARY PHONE - S MAILING ADDRESS � Vv MAIL ll Sf 'j J�cJvVI't APPLICANT 2FAX �1 �`' CITY'" z � 6e� 1 I r rPRIMARY PHONE PROJECT CONTACT Ica 10 MAILING ADDRESS C> -7 (r.— r � J tl r cd rA X. c (The individual to receive and respond to all correspondence CWV �o STATE ZtP FAX concerning this application) PROJECT FINANCING NAME ❑ OWNER -FINANCED When value is $5,000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such clairN, which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as apart of this applicot-10—n. Ll ; —Zvl S PRINT NAME: Bulletin #100 —January 29, 2016 Page 1 of 2 k:\Handouts\Permit Application l3L cos