Loading...
18-103115r � - City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: RETREAT MEADOWS LOT 47 Project Address: 151 SW 358TH ST Project Description: ADD - Construction of a retaining wall. I � Building - Single Family Permit #:18 -103115 -00 -SF Inspection Request Line: (253) 835-3050 Parcel Number: 724290 0470 Owner Applicant Contractor Lender LENNAR NORTHWEST INC JULIE FISONLENNAR LENNAR NORTHWEST INC OWNER IS LENDER 33455 6TH AVE S SUITE 1-B NORTHWEST INC 33455 6TH AVE S SUITE I -B FEDERAL WAY WA 98003 33455 6TH AVE S UNIT 1-B FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Census Category: 565 - Fence/retaining wall Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) I hereby certify that the and the occupancy Owner or agent: PERMIT EXPIRES Wednesday, 6 February, 2019 Permit Issued on Friday, August 10, 2018 information is correct and that the construction on the above described property use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. n / Date. �/ � THIS CARD IS TO REMAIN ON-SITE urn or Inspection Record Federal WayTHIS INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 1810311500 Address: 151 SW 358TH ST Project: LENNAR NORTHWEST INC FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. E SWM Precon Site Mtg (4400) 0 Initial Erosion Control (4365) 3❑ Footings/Setback (4110) Date Approved 1By To be done PRIOR to breaking ground Approved to place concrete By By Date Date By Date By Date ® Foundation Wall (4115) El Drainage/Downspout (4040) ® Slab/Concrete Floor (4255) Approved to place concrete 113Y Approval to backfill Approved to place concrete ]By By Date Date Date UZI Underfloor Framing (4285) ® Floor Sheathing (4105) Final Electrical Shear Walls (4245) Right of Way Approved to sheath floor Approved Approval to install flooring Approval to install siding By Date By Date By Date Date Prior to schedWhW a �g 0 Framing (4120) ® Insulation (4150) Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approval to install wallboard and FirdDraR Stop hurpecdow mast be signed - off and approved. IBC 109.3.4 By Date By Date Rough Electrical Final Electrical Right of Way Approved Approved Approval By Date By Date By Date January 10, 2019 ES -6215 Lennar NW, Inc. 33455-6 111 Avenue South, Unit 1-13 Federal Way, Washington 98003 Attention: Mr. Andrew Zinniger Earth Solutions NW«, Earth Solutions NW LLC Geotechnical Engineering, Construction Observation/Testing and Environmental Services Subject: Final Report — Lock and Load Walls Retreat Meadows Southwest 356th Street and 7st Avenue Southwest Federal Way, Washington Dear Mr. Zinniger: In accordance with your request, Earth Solutions Northwest, LLC (ESNW) prepared this letter summarizing the construction observations of the completed lock and load walls on site. An ESNW representative was on site December 31, 2018 to observe the existing / completed lock and load walls located at lot 38, and lots 43 through lot 47. Lock and load mechanically stabilized earth (MSE) walls were constructed to support the transition between newly established finished lot grades, as well as the transition between lot 47 and the newly established grades for the on-site right-of-way of 1St Place Southwest. The exposed wall height ranged between approximately 4 to 5.33 feet (or less). ESNW representatives observed suitable, native soil exposed at the wall keyway areas when probed at the toe of the existing walls. Our representative confirmed the keyway and retained soil mass along retaining wall alignments to be suitable for support of the final wall configuration. Drainage for the lock and load wall consisted of at least 18 inches of 5/8 -inch clean rock placed behind the wall face, and a four -inch diameter perforated pipe was placed behind the toe of the wall to be tied into the on-site storm system. ESNW observed geogrid reinforcement (Synteen SF -55 or equivalent) placed behind the engineered fill (MSE) portion of the lock and load walls. ESNW observed that geogrid reinforcement was placed in accordance with the lengths, strengths, and frequency specified in the approved plans and our geotechnical recommendations. ESNW observed wall backfill comprised of 5/8 -inch minus crushed rock at wall sections over 4 feet in overall height, and silty sand with gravel backfill at walls four feet in height (or less). ESNW observed dense, well compacted soil conditions behind each wall. 1805 - 136th Place N.E., Suite 201 - Bellevue, WA 98005 - (425) 449-4704 - FAX (425) 449-4711 Lennar NW, Inc. January 10, 2019 ES -6215 Page 2 Based on our observations and testing, the lock and load walls constructed in accordance with the project plans and our geotechnical recommendations. We trust this letter meets your current needs. If you have any questions, please call. Sincerely, EARTH SOLUTIONS NW, LLC *,� ),;,A D A r,o rl N '4 f +r r t � 3601. t3 ..� ! ; �• t tt y } B. Tyler Scalise Raymond A. Coglas, P.E. Assistant Field Supervisor Principal Engineer cc: Lennar NW, Inc. Attention: Mr. Patrick Stauffer (Email only) Earth Solutions NW, LLC RECEIVED Jul f y CITY OF �•. JUL 17 2018 PERMIT APPLICATION Federal Way('�t'1(t� FEDEPAL W,'y t tdru "ry DEVELOPMR1 TI PERMIT NUMBER I F _ t.0 3 1 Is - TARGET DATE SITE ADDRESS SUITE/UNIT t 151 SW 3581h Street, Federal Way, WA PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL i $ 10,000.00 RS7.2 -7- -2- 4 --2- -9- Q - --0- -4- --1- --0- TYPE OF PERMIT BUJLVINc (PLUMBING 'MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT Retreat Meadows Lb -}- 47 Build New retaining wall on Lot 47 PROJECT DES9CRIPTION Detailed description of work to be included on this permit only N Lennar Northwest Inc. 13 PROPERTY OWNER >»A.NDSAve S., Unit 1-B ju'�%fison@lennar.com CITY Federal Way STATE WA 98003 Rutz Lennar Northwest Inc. PH IS3-590-2213 MnT9jPetri 'kve S., Unit 1-B j lie .fison@lennar.com CONTRACTOR c "Federal Way *TVA ZIF 98003 IP"N WA STATE CONTRACTOR'S LICENSE M CC LENNNANI893QG EXPIRATION DATE 11/ 7 X2019 FEDBRAL WAY BUSINESS LICENSE N NAURJulieFison PRI 3Y M2213 APPLICANT KAILMG ADDRESS 6th Ave S., Unit 1-B E-jKutle.fison@lennar.com 1""u Lle.fison@lennar.com c"T"Federal Way V% ZIP98003 FAx N p��8 PROJECT CONTACT Julie Fison 13 14JK1JJ S_., Unit 1-B ju`"ie"fison@lennar.com (The individual to receive and respond to all correspondence bt1lsAVe O Tederal Way iW %003 concerning this application) PROJECT FINANCING NAMnar Northwest Inc. _ --- When value is $5,000 or more (RCW 19.27.09s/ e[11 TSN¢ iD sAve �S�T,TI ZIP -B jJ4JJ btjl 253-590-2�1�` 'B I certgq under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and flied against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. SIGNATURE: Julie Fison DATE ' PRINT NAME: Julie Fison ' MECHANICAL PERMIT VALUE OFMECHANICAL WORK Indicate how many o each type offixture to be installed or relocated as part of this project. Do not include existing res to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS (commercial) BOILERS FURNACES HOT WATER 26iN9 p-jankless COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR VALUE OF PLUMBING WORK PLUMBING PERMIT N/A Lakehaven Utilty District N/A $ Indicate how mar!y o each type offixture to be installed or relocated as part o this project. Do not include existingfixtures to remain. BATHTUBS IorTub/Shower combo) LAVS (Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS INitchen/Unlityl WATER HEATERS (nectric) HOSE B1BBS SUMPS WASHING MACHINES TOTAL FIXTUREt3 GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS N/A Lakehaven Utilty District N/A EXISTING/PREVIOUS USE LOT SIZE ttn Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? Vacant o Yes N No ❑ Yes & No COMMERCIAL — NWADDITION AREA DESCRIPTION Area in Occupancy Group(s) Construction # of Additional Information S uare Feet a Stories NIsVv BvlLaii�a ADDITION COMMERCIAL — REMODEL/TENANT IMPROVEMENTS Bulletin #100 — February22, 2016 Page 2 of 2 k:\Handouts\Permit Application