14-100402C"'of Federal Way
Community & I=con. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609 r f
f
Building - Commercial
Permit #: 14 -100402 -00 -CO
Inspection Request Line: (253) 835,3050
Project Name: THE COMMONS AT FEDERAL WAY - DSG DEMO
Project Address: 1819 S COMMONS
Parcel Number: 762240 0010
Project Description: ALT - Selective demolition of interior work, exterior walls and some site improvements in
accordance with scoping/phasing plan preparatory to construction of DSG shell, including
temporary structural support and construction barricades.
Owner
Ani{ Iicant
Contractor
Lender
STEADFAST COMMONS II LLC
JAMES PALDA
S D DEACON CORP OF
18100 VON KARMAN SUITE 500
STEADFAST COMPANIES
WASHINGTON
IRVINE CA 92612
18100 VON KARMAN SUITE 500
SDDEACW 108NT (6/20/14)
IRVINE CA 92612
2375 130TH AVE NE SUITE 200
BELLEVUE WA 98009
Census Category: 437 - Commercial alt / add / conversion
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load
Floor Areas . ft. 0 0 0 0
Additional Permit information'
Mechanical to be Included?....................................No Number of Stories ................................................. 1
Permit for Building Shell Only?............................No Plumbing to be Included? ...................................... No
No Fixtures Associated With This Permit 11
CONDITIONS:
NOTE: Approval of demolition work does not guarantee land use approval.
I hereby certify that the
the occupancy and tl�e
Owner or agent:
PERMIT EXPIRES Tuesday, July 29, 2014
Permit L§sued on Thursday, January 30, 2014
will be in
F')"kI-ek gJ zz�I �
s correct and that the construction on the above described property and
rdance with the laws, rules and regulations of the State of Washington
and the of Federal Way.
Date:
ary of
Ferrera! Way
PERMIT #:
Project:
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
14 -100402 -00 -CO Address: 1819 S COMMONS
STEADFAST COMMONS II LLC FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Shear Walls (424;
Approved to install siding
Interim Erosion C
Approved
By Date
13 Insulation (4150)
Approved to install wallboard
By Date
0 Roof Sheathing (4220)
Approved to install roofing
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
❑ Fire/Draft Stops (4095)
Approved
By Date
Framing (4120)
Approved to insulate
Date..
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
0
SWM Precon Site Mtg (4400)11
Initial Erosion Control (4365)
Drainage/Downspout (4040)
Footings/Setback (4110)
Erosion Control (4375)
Approved
Approved
To be done prior to breaking ground
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Shear Walls (424;
Approved to install siding
Interim Erosion C
Approved
By Date
13 Insulation (4150)
Approved to install wallboard
By Date
0 Roof Sheathing (4220)
Approved to install roofing
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
❑ Fire/Draft Stops (4095)
Approved
By Date
Framing (4120)
Approved to insulate
Date..
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
0
Foundation Wall (4115)
E]
Drainage/Downspout (4040)
Erosion Control (4375)
Re -steel (4215)
Approved
Approved to place concrete
Approved
By
Approved to backfill
Approved
By
Approved to place concrete or grout
By
Date
By
Date
By
Date
0
Slab/Concrete Floor (4255)
Underfloor Framing (4285)
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
Shear Walls (424;
Approved to install siding
Interim Erosion C
Approved
By Date
13 Insulation (4150)
Approved to install wallboard
By Date
0 Roof Sheathing (4220)
Approved to install roofing
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
❑ Fire/Draft Stops (4095)
Approved
By Date
Framing (4120)
Approved to insulate
Date..
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
0
Final - Fire Department (4060)
Final - PlanningFinal
Final Electrical
Erosion Control (4375)
Right of Way
Approved
Date
Approved
By
Date
Approved
By
Date
By
Date
By
Date
Final - Building (4050)
Approved ''AA
By SS Date aln' /14
fK SGo'f OO ISL e0'
Rough Electrical
Approved
1:1Approved
Final Electrical
1:1Approved
Right of Way
By
Date
By
Date
By
Date
4�D SECEIVED
`
MY JAN 2 i 2014 PERMIT APPLICATION
Federal Way
CITY OF FEDERAL,WAY �1iJ
/ /l �\ CDS
PERM1 IT NUMBER / _ / / / / Y_v � c�
vvv ill/// TARGET DATE
SITE ADDRESS
4a1 S n & M09A-s
SUITE/UNIT #
PROJECT vn..uaTION
ZONING
ASSESSOR'S TAX/PARCEL #
TYPE OF PERMITY-BUILDING
❑ PLUMBING ❑ MECHANICAL INDEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT'
PROJECT DESCRIPTION
Detailed description of work to
be included on this permit only
PROPERTY OWNER
NAMEe-
`4' te7uvve ,rZ� f l
PRIMARY PHONE
i`t`( 5S 2c� �
MAILING ADDRESS
B -MAIL
CITY
STATE
ZIP
5 \��
CONTRACTOR
NAME
Zf c_>
PHONE
`t z c� Vr l `l Cc;C
MAILING ADDRESS
E-MAIL
P(e.2 &2
STATE'
ATq
ZIP uArAk
zy-�. $ ,1�5
WA STATE CONTRACTOR'S LICENSE ^#
' � �— �✓ 1 06 A-)7_
EXPIRATION DATE
FEDERAL WAY BUSINESS LICENSE #
NAME
PPJ31ARY PHONE
MAILING ADDRESS
E-MAIL
APPLICANT
CITY
STATE
ZIP
FAX
PROJECT CONTACT
NAME
-
PRIMARY PHONE
MAILING ADDRESS
1-f_4_41> C
E-MAIL
(The individual to receive and
respond to all correspondence
CITY
STATE
ZIP
FAX
concerning this application)
PROJECT FINANCING
NAM
OWNER -FINANCED
Required value of $5, 000 or more
(RCW 19.27.095)
MAILING ADDRESS, CITY, $ ATE, ZIP_ A
/
°7) / ({Uv f C4 ( q 6t�+
7 PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim/, which may be made by any person, including the undersigned, and filed against the city,
but only where such cl arises o t of the reliance of the city, including its officers and employees, upon the accuracy of the
information suIldthe c p of this application.
SIGNATURE: DATE /A 5 /
PRINT NAME:�$Cri"
J
Bulletin #100 -January 1, 2013 Page 1 of 3
k:\Handouts\Permit Application
9
OF �
Federal Way
F-1
L _1
DE1QfiQRItff9UNrrY DEVELOPMENT SERVICES
33325 8`h Avenue South
Fed3-6325
JAN 2 7 2014 253-835-2607; Fax 253-835-2609
l Way, WA 1
CITY OF FEDERAL WAY www.cityoffederalway.com
CDS
RESUBMITTAL INFORMATION
This completed form MUST accompany all resubmittals
"Please note. Additional or revised plans or documents Foran active project will not be accepted
unless -accompanied by this completed form. Mailed resubmittals that do not include this form or that
do not contain the correct number of copies will be retumed or discarded. You are encouraged to
submit all items in person and to contact the Permit Counterpnor to submitting ifyou are not sure
about the number of copies required. **
ANYCHANGEs ro DRA wNGs musrw czouDED.
Project Number:
Project Name:
CD CD Z—
Cv
Project Address:
Project Contact: Phone: &:23
RESUBMITTED ITEMS:
# ofCopies "'
Always submit the same number of copies as required fioryour inIftal application **
Resubmittal Requested by: er Dated: /
em r
Bulletin #129 — January 1, 2011
Page 1 of 1
k: W andouts\Resubmittal Infonnation