Loading...
14-100402C"'of Federal Way Community & I=con. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 r f f Building - Commercial Permit #: 14 -100402 -00 -CO Inspection Request Line: (253) 835,3050 Project Name: THE COMMONS AT FEDERAL WAY - DSG DEMO Project Address: 1819 S COMMONS Parcel Number: 762240 0010 Project Description: ALT - Selective demolition of interior work, exterior walls and some site improvements in accordance with scoping/phasing plan preparatory to construction of DSG shell, including temporary structural support and construction barricades. Owner Ani{ Iicant Contractor Lender STEADFAST COMMONS II LLC JAMES PALDA S D DEACON CORP OF 18100 VON KARMAN SUITE 500 STEADFAST COMPANIES WASHINGTON IRVINE CA 92612 18100 VON KARMAN SUITE 500 SDDEACW 108NT (6/20/14) IRVINE CA 92612 2375 130TH AVE NE SUITE 200 BELLEVUE WA 98009 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load Floor Areas . ft. 0 0 0 0 Additional Permit information' Mechanical to be Included?....................................No Number of Stories ................................................. 1 Permit for Building Shell Only?............................No Plumbing to be Included? ...................................... No No Fixtures Associated With This Permit 11 CONDITIONS: NOTE: Approval of demolition work does not guarantee land use approval. I hereby certify that the the occupancy and tl�e Owner or agent: PERMIT EXPIRES Tuesday, July 29, 2014 Permit L§sued on Thursday, January 30, 2014 will be in F')"kI-ek gJ zz�I � s correct and that the construction on the above described property and rdance with the laws, rules and regulations of the State of Washington and the of Federal Way. Date: ary of Ferrera! Way PERMIT #: Project: THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 14 -100402 -00 -CO Address: 1819 S COMMONS STEADFAST COMMONS II LLC FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Shear Walls (424; Approved to install siding Interim Erosion C Approved By Date 13 Insulation (4150) Approved to install wallboard By Date 0 Roof Sheathing (4220) Approved to install roofing By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date ❑ Fire/Draft Stops (4095) Approved By Date Framing (4120) Approved to insulate Date.. Suspended Ceiling Grid (4265) Approved to drop tile By Date 0 SWM Precon Site Mtg (4400)11 Initial Erosion Control (4365) Drainage/Downspout (4040) Footings/Setback (4110) Erosion Control (4375) Approved Approved To be done prior to breaking ground Approved Approved to place concrete By Date By Date By Date Shear Walls (424; Approved to install siding Interim Erosion C Approved By Date 13 Insulation (4150) Approved to install wallboard By Date 0 Roof Sheathing (4220) Approved to install roofing By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date ❑ Fire/Draft Stops (4095) Approved By Date Framing (4120) Approved to insulate Date.. Suspended Ceiling Grid (4265) Approved to drop tile By Date 0 Foundation Wall (4115) E] Drainage/Downspout (4040) Erosion Control (4375) Re -steel (4215) Approved Approved to place concrete Approved By Approved to backfill Approved By Approved to place concrete or grout By Date By Date By Date 0 Slab/Concrete Floor (4255) Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date Shear Walls (424; Approved to install siding Interim Erosion C Approved By Date 13 Insulation (4150) Approved to install wallboard By Date 0 Roof Sheathing (4220) Approved to install roofing By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date ❑ Fire/Draft Stops (4095) Approved By Date Framing (4120) Approved to insulate Date.. Suspended Ceiling Grid (4265) Approved to drop tile By Date 0 Final - Fire Department (4060) Final - PlanningFinal Final Electrical Erosion Control (4375) Right of Way Approved Date Approved By Date Approved By Date By Date By Date Final - Building (4050) Approved ''AA By SS Date aln' /14 fK SGo'f OO ISL e0' Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date 4�D SECEIVED ` MY JAN 2 i 2014 PERMIT APPLICATION Federal Way CITY OF FEDERAL,WAY �1iJ / /l �\ CDS PERM1 IT NUMBER / _ / / / / Y_v � c� vvv ill/// TARGET DATE SITE ADDRESS 4a1 S n & M09A-s SUITE/UNIT # PROJECT vn..uaTION ZONING ASSESSOR'S TAX/PARCEL # TYPE OF PERMITY-BUILDING ❑ PLUMBING ❑ MECHANICAL INDEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT' PROJECT DESCRIPTION Detailed description of work to be included on this permit only PROPERTY OWNER NAMEe- `4' te7uvve ,rZ� f l PRIMARY PHONE i`t`( 5S 2c� � MAILING ADDRESS B -MAIL CITY STATE ZIP 5 \�� CONTRACTOR NAME Zf c_> PHONE `t z c� Vr l `l Cc;C MAILING ADDRESS E-MAIL P(e.2 &2 STATE' ATq ZIP uArAk zy-�. $ ,1�5 WA STATE CONTRACTOR'S LICENSE ^# ' � �— �✓ 1 06 A-)7_ EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # NAME PPJ31ARY PHONE MAILING ADDRESS E-MAIL APPLICANT CITY STATE ZIP FAX PROJECT CONTACT NAME - PRIMARY PHONE MAILING ADDRESS 1-f_4_41> C E-MAIL (The individual to receive and respond to all correspondence CITY STATE ZIP FAX concerning this application) PROJECT FINANCING NAM OWNER -FINANCED Required value of $5, 000 or more (RCW 19.27.095) MAILING ADDRESS, CITY, $ ATE, ZIP_ A / °7) / ({Uv f C4 ( q 6t�+ 7 PHONE I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim/, which may be made by any person, including the undersigned, and filed against the city, but only where such cl arises o t of the reliance of the city, including its officers and employees, upon the accuracy of the information suIldthe c p of this application. SIGNATURE: DATE /A 5 / PRINT NAME:�$Cri" J Bulletin #100 -January 1, 2013 Page 1 of 3 k:\Handouts\Permit Application 9 OF � Federal Way F-1 L _1 DE1QfiQRItff9UNrrY DEVELOPMENT SERVICES 33325 8`h Avenue South Fed3-6325 JAN 2 7 2014 253-835-2607; Fax 253-835-2609 l Way, WA 1 CITY OF FEDERAL WAY www.cityoffederalway.com CDS RESUBMITTAL INFORMATION This completed form MUST accompany all resubmittals "Please note. Additional or revised plans or documents Foran active project will not be accepted unless -accompanied by this completed form. Mailed resubmittals that do not include this form or that do not contain the correct number of copies will be retumed or discarded. You are encouraged to submit all items in person and to contact the Permit Counterpnor to submitting ifyou are not sure about the number of copies required. ** ANYCHANGEs ro DRA wNGs musrw czouDED. Project Number: Project Name: CD CD Z— Cv Project Address: Project Contact: Phone: &:23 RESUBMITTED ITEMS: # ofCopies "' Always submit the same number of copies as required fioryour inIftal application ** Resubmittal Requested by: er Dated: / em r Bulletin #129 — January 1, 2011 Page 1 of 1 k: W andouts\Resubmittal Infonnation