Loading...
14-1004284 % City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 63uilding - Commercial Permit #: 14 -100428 -00 -CO 4 - Inspection Request Line: (253) 835-3050 Project Name: THE COMMONS AT FEDERAL WAY - J KINLOW DEMO Project Address: 1819 S COMMONS Parcel Number. 762240 0010 Project Description: ALT Selective demolition of rear portion of existing tenant space in accordance with scoping/phasing plan preparatory to construction of DSG shell. Owner ARRlican Contractor Lender STEADFAST COMMONS II LLC JAMES PALDA S D DEACON CORP OF 18100 VON KARMAN SUITE 500 STEADFAST COMPANIES WASHINGTON IRVINE CA 92612 18100 VON KARMAN SUITE 500 SDDEACW108NT (6/20/14) IRVINE CA 92612 2375 130TH AVE NE SUITE 200 BELLEVUE WA 98009 Census Category: 437 - Commercial alt / add / conversion Includes. #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load- Floor oadFloor Areas . ft. 0 1 0 0 0 Additional Permit Information Mechanical to be Included?...................................No Number of Stories ................................................. 1 Permit for Building Shell Only?............................No Plumbing to be Included? ...................................... No New / Additional Sq. Feet - Total .......................... 0 No Fixtures Associated With This Permit 11 CONDITIONS: NOTE: Approval of demolition work does not guarantee land use approval. I hereby certify that the the occupancy and the Owner or agent: PERMIT EXPIRES Tuesday, July 29, 2014 Permit Issued on Thursday, January 30, 2014 will be in s correct and that the construction on the above described property and rdance with the laws, rules and regulations of the St to of Washington and the City of Federal Way. —� Date: FINALED THIS CARD IS TOMAIN ON-SITE CITY OF Construction In ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 14 -100428 -00 -CO Address: 1819 S COMMONS Project: STEADFAST COMMONS II LLC FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. E] SWM Precon Site Mtg (4400) Initial Erosion Control (4365) ❑ Footings/Setback (4110) 1:1Approved Approved By To be done prior to breaking ground Approved to place concrete By Date By Date By Date E] Foundation Wall (4115) Drainage/Downspout (4040) Final Electrical Approved Re -steel (4215) 1:1Approved Approved to place concrete By Approved to backfill Approved to place concrete or grout By Date By Date By Date E] 0 Slab/Concrete Floor (4255) Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date Shear Walls (4245) Roof Sheathing (4220) Fire/Draft Stops (4095) Approved to install siding Approved to install roofing Approved By Date By Date By Date Interim Erosion Control (4370) Prior to scheduling a Framing inspection; n Frami g (4120) Approved lectrical, Plumbing& Mechanical Rough -in and I Approved to insulate By Date re/Draft Stop inspections must be signed -off and BY Date approved. IBC 109.3.4 Insulation (4150) Gypsum Wallboard Nailing (4130) [:] Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date Final - Fire Department (4060) Final Erosion Control (4375) a Final - Building (4050) Approved Approved Approved By Date By Date Date�— Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date .3 Federal Way R6C61V6D APPLICATION JAN 2 7 2014 / CITY OF FEDERAL WAY PERMTr NUMBER _ / 2 4 S_ — 1 /' �- U // TARGET DATE SITE ADDRESS It (` C \ SUITE/UNIT • //J /f I 5� ///l J PRojEdr VALUATION ZONING ASSESSOR'S TAX/PARCEL 1 $ to once i7 fir Z Z 6 ca Z- Gj TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL INDEMOLITION ❑ ENGINEEEERING ❑FIRE PREVENTION NAME OF PROJECT .� /(14 J K S " PROJECT DESCRIPTION lW1�C CA Detailed description of work to u-t� 07/ LC' Uv be included on this permit only NAME ` V L G PRIMARY PHONE PROPERTY OWNER cc.tcpsa T YY' .�5 2 O� MAILING ADDRESS I// .. 10toC� Ud�,l""TRs+Vi*, EMAII. CITY _ "ATE ZIP NAME PHONE If t 5 'L$ `j 11 OC30 MAILING ADDRESS AA -- �-� Z-40 E-MAIL I . CONTRACTOR 619"5. STATE C-c>/t- ZIP I8W J 41 Z'8 %1 4(0,0 WA STATE CONTRACTOR'S LICENSE ERPIRATION DATE FEDERAL WAY BUSINESS LICENSE T/ S� c- ( � A..)[ NAME AA As •2s cam— ' PRIMARY PHONE MAILING ADDRESS E -MAD, APPLICANT CITY STATE ZIP FAR NAME PRIMARY PHONE PROJECT CONTACT d'CJ- MAILING ADDRESS E-MAIL (The individual to receive and respond to all correspondence CITY STATE ZIP FAX concerning this application) PROJECT FINANCING NAME _ OWNER -FINANCED Required value of $5,000 or more (RCW 19.27.095) MAILING ADDRBCS, CITY, STATE, ZIP �� ►+. 'L}`'V -� C•F 100 i �' PHONE 3 '41 4 1 I certify under penalty of perjury that I am the property owner or authorised agent of the property owner. I certgy that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim/, which may be made by any person, including the undersigned, and flied against the city, but only where ch c arises o t of the reliance of the city, including its officers and employees, upon the accuracy of the information su i the c p of this application. SIGNATURE: DATE , Z / PRINT NAME: J Bulletin #100 -January 1, 2013 Page 1 of 3 k:\Iiandouts\Pelmit Application LI Marty Gillis From: JJ Engler <jj.engler@deacon.com> Sent: Tuesday, January 28, 2014 12:36 PM To: Marty Gillis Cc: James Palda Subject: Dick's Sporting Goods - Testing Agency Hi Marty, 0 We plan on using Krazan & Associates will be our special inspector on the Dick's job. Bill Thorne is the contact. Thank you, J.J. Engler Project Manager S.D. Deacon Corp. of Washington M:206.940.8172 T: 425.284.4000 F: 425.284.4100 Seattle I Portland I Sacramento I Pleasanton I Irvine www.deacon.com r Approved Transaction l pscleanair.org • Puget Sound Clean Air Agency Notification Case #: 201400243 littps://*e.pscleanair.orgf Asbestos/Approved.aspx This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $210.00 Credit Card Transaction # VPEFA4E37C20 Transaction Date 01/22/14 Owner's Name Commons Mall LLC Phone (949) 623-7709 Project Street Address 1819 South Commons City Federal Way Zip 98003 Contact Person 3.3. Encler Phone (206) 940-8172 Mailing Address 18100 Von Karma Ste. 300 Irvine, CA 92612 This project includes asbestos removal. Project Size linear feet / 4250 square feet Project Start Date 02/03/14 Completion Date 02/15/14 Asbestos will be removed by a licensed asbestos abatement contractor Contractor KD&S Environmental, Inc. Contractor Job # Contact Sandie Pennant Phone (360) 249-5540 Mailing Address P.O. Box 312 Montesano, WA 98563 (1) I certify that the information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification if: • The type of project has changed. The project types are asbestos and demolition. • • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. • W J LL Create Another Notification View History Loa Out R ES U B M IiTE D If you have questions, contact us at asbestos@pscieanalr.org or 206.689.4058. JAN 2.7 2014 CITY OF FEDERAL WAY CDS 1 of 1 1/22/2014 4:20 PM • bttp://www.lni.wa.gov/sopics/atoz/asbestos/FormDataDisplay.a... Dept. of Labor & Industries, Division of Occupational Safety & . • Health Asbestos Project Notification Form Form ID: 808674#1402KDSEn767843 Notice Date: 1/22/2014 Start Date: 2/3/2014 Completion Date: 2/15/2014 Status: Initial Site Work Hours: 0730 - 1730 Site Work Days: Monday Tuesday Wednesday Thursday Friday Contractor: K D & S Environmental Inc • Job Site C.A.S.: 2014008387A Your e-mail address: sandie@kdsenv.com Contractor Phone Number: 360-249-5540 Property Owner Name: James Pala Owner's Agent: JJ Encler Company: Commons Mall LLC Address: 18100 Von Karma Ste.300 City: Irvine State: CA Zip+4: 92612 Phone: 9949-623-7709 Job Site • Address: 1819 South Commons 1 of 3 1/22/2014 4:06 PM 9 bttp://www.lni.wa.gov/sletopics/atozlasbestos/FormDataDisplay.a... Building Name: The Commons @ Federal Way • Room: Dicks Sporting Goods City: Federal Way Zip + 4: 98003 County: King Facility Type: Retail space Age: 1970 Size: 45,000 Type of activity: RemodelMaintenance Quantity of Asbestos to Be Removed Indoors Quantity: 4250 square feet Popcorn ceiling • VAT Sheet vinyl Quantity: linear feet Control Measures Neg. pres. enclosure Wet methods Critical barriers Manual methods Respiratory Protection 1/2 mask APR Type C pressure demand Comments: 2,000 sq.ft. popcorn 1,500 sq.ft. VAS 750 sq.ft. VAT i� 2 of 3 1/22/2014 4:06 PM • http://www.InLwa.gov/sltopies/atoz/asbestos/FormDataDisplay.a... Date/Time Submitted .. 1/22/2014 4:05:50 PM • 3 of 3 1/22/2014 4:06 PM litu c? :I 0 IS TRAFFIC ire SIGNAL PROPOSED 'YLm SIGN CITC nirrff iminr of A LI WORKAREA - JAN 27 2014TO OCT I, 2014 - MALLACCESS OPEN ATALLTIMES WORKAREA - JAN 27,2014 TO OCT I, 2014 - FENCED WITH WINDSCREEN OTHERTHAN AT MALL INTERIOR CEN THEA 61,1 CONSTRUCTION HAUL ROUTE -JAN 27, 2014TO OCT 1,2014- ROADWAY OPEN AT ALLTIMES 11-26-13 CONSTRUCTION STAGING, OFFICES & CONTRACTOR PARKING -JAN 27, 2014TO OCT 1,2014- FENCED WITH WINDSCREEN 01-10-14 REV 01-20-14 REV FENCE LINE 01-23-14 REV PHASE 2: DICK'S SPORTING GOODS CONSTRUCTION PHASING PLAN: JAN 2014 - OCT 2014 CONI3ft3Nrft c&ECONO:IK DEVELOPMENT DEPARTMENT 3332.5 8'" Avenue South Federal Way. WA 98003-6325 CITY OF 'c' <_� 2oi-83?-�6t)7, Fa:;353-835.261;�) svtiv�v.citvoiFeder;sis�ay.cism A demolition permit is required to remove arty structure or structures on a subject property. Check with the City's Planning Division to see if the proposal exceeds thresholds that trigger an environmental review. An environmental review and submittal of an environmental checklist may be required, which will extend the time period before a demolition permit can be issued. © Prior to submitting a demolition permit, the following items (as applicable) must be signed by the respective agency (see attached Demolition Permit Contact List). tVOTt. TO APPLICANT.- Utilities .shati be diseonnected and services perlbrmea; if applicable, prior to issuance of tlw demolition permit. All applicable i!ems below are to be ttngs4 n-I&W4hy the respective agency represetrtatives. 1. ASBESTOS ABATEMENT 6. ELECTRICITY (Copy of approval form an asbesbo�s ' y from Puget Sound Clean Air (Electricity to be shut off and meter removed) Agency Provided �" _ v —/� 5 3 0 3 5 26o� �— (Puget sound Energy) (G of srel WayllildUig Official) 2. GAS SUPPLY (Gas to 4e shut o ,ane removed and final bill paid) (Puget bound Energy) 3. SEPTIC SYSTEM (Tank to be reoved or tank to be drained and filled) �t f A (King County Environmental Services) 4. SANITARY SEWER (Check applicable box) osewer line rapped at property line Existing sewer fine to remain and be used by proposed new structure (Lakehaven Utility District) S.GARBAGE (Ali old garbage disposed off and final bill paid) (Waste ManagementtOther Company) ❑ Completed Construction Permit Application form © Provide the following fees 1. Demolition Permit Fee 2. Automation Fee 3. WA State Surcharge 7. FUEL STORAGE TANKS (Above or. below grade fuel tanks, have been pumped or removed undel-Tirf Department permit prior to any dismantle/excavation) {South King Fire and Rescue) S. WATER - Public Source (Check applicable box) o Meter to be removed and final utility bill paid Xleter to remain and be protected (Water Supplier) ****** OR x***** 9. WATER - Private Well (Check applicable box) ❑ Private l filled and capped ❑ Priv fio be used for other purposes (King County Environmental Services) Based on valuation. See tabic on pg 4 of'the eonstntction permit appl cation. $20.00 $4.50 E3uitetin t+122—February 14, 2013 Page t of 1 k:41andouisDernolition PennitRequirements