Loading...
15-10400141 t 4 0 . - *City of Federal Way Community & Econ. Iev. Services V:1LE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MAPLEWOODS CONDOMEWUMS UNIT D-3 Project Address: 32130 45TH PL SW Unit D3 Quilding - Multi' Hy Permit #: 15 -104001 -00 -MF Inspection Request Line: (253) 835-3050 Parcel Number: 512600 0270 Project Description: REP - Exterior sheathing and interior sheetrock replaced due to rot damage Owner ARplicant Contractor Lender KYLE A FRANKLIN HARBOR ROCK CONSTRUCTION HARBOR ROCK CONSTRUCTION 32130 45TH PL SW UNIT D-3 LLC LLC FEDERAL WAY WA 98023 DBA INNOVATIVE CONCRETE SO] INNOVCS931KT (06/04/15) 3110 JUDSON ST PMB 206 DBA INNOVATIVE CONCRETE SO FEDERAL WAY WA 3110 JUDSON ST PMB 206 FEDERAL WAY WA Census Category: 434 - Residential alt/add - no change in number of units Includes. #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load Floor Areas . ft. 0 1 0 0 1 0 Additional Permit Information Mechanical to be Included?...................................No Number of Stories ................................................. 2 Permit for Building Shell Only?............................No Plumbing to be Included? ....................................... No No Fixtures Associated With This Permit 11 PERMIT EXPIRES Saturday, February 6, 2016 Permit Issued on Monday, August 10, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington d the City of Federal Way. Owner or agent: Date: /�� & A. . 1 • THIS CARD IS TO *MAIN ON-SITE CIT; or - Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 15 -104001 -00 -MF Address: 32130 45TH PL SW Unit D3 Project: KYLE A FRANKLIN FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Insulation (4150) Approved to install wallboard By L Date _ 1 Final - S K F & R (4060) Approved By Date Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date $. Final Erosion Control (4375) Approved By Date Suspended Ceiling Grid (4265) Approved to drop tile By Date 0 Final - Building (4050) Approved By A L Date q Il Ls SWM Precon Site Mtg (4400) Initial Erosion Control (4365) [] Footings/Setback (4110) 1:1Approved Approved By To be done prior to breaking ground Approved to place concrete By Date By Date By Date Insulation (4150) Approved to install wallboard By L Date _ 1 Final - S K F & R (4060) Approved By Date Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date $. Final Erosion Control (4375) Approved By Date Suspended Ceiling Grid (4265) Approved to drop tile By Date 0 Final - Building (4050) Approved By A L Date q Il Ls Foundation Wall (4115) Drainage/Downspout (4040) [] Re -steel (4215) 1:1Approved Approved to place concrete By Approved to backfill Approved to place concrete or grout By Date By Date By Date Slab/Concrete Floor (4255) Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date Shear Walls (4245)11 Roof Sheathing (4220) Fire/Draft Stops (4095) Approved to install siding Approved to install roofing Approved By Date By Date By Date Interim Erosion Control (4370)EFire/Draft scheduling a Framing inspection; Framing (4120) Approved lumbing & Mechanical Rougb-in and Approved to insulate By Date top inspections must be signed -off and BY Date approved. IBC 1093.4 Insulation (4150) Approved to install wallboard By L Date _ 1 Final - S K F & R (4060) Approved By Date Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date $. Final Erosion Control (4375) Approved By Date Suspended Ceiling Grid (4265) Approved to drop tile By Date 0 Final - Building (4050) Approved By A L Date q Il Ls Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date CITY OF PERMIT PPLICATION Federal Way RECEIVED _ AUG 10 2015 PERMIT NUMBER 15 _ C _� — — — — — — — — — Y TARGET DATE CITY OF FEDERAL WAY CDS SITE ADDRESS y C -37zoo Lift pc ,St/ 41W Bulletin SUITE/UNIT # - I> PRO�fJECTDATION ZONING ASSESSOR'S TAX/PARCEL# � 0 �_ — U— -/—["/`'/—J TYPE OF PERMIT auILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT ! • AA� Q PROJECT DESCRIPTION Detailed description of work to t �� 1� CI l (44,0*'- be included on this permit only PROPERTY OWNER NAME K 1� w k i t ^ D� �` Iy{�M` ' PRIMARY PHONE MAILING AD15RESS E-MAIL CITY STATE ZIP NAME♦ /f 0 PHONE MAILING ADDRESS _ � / E-MAIL CONTRACTOR CITY K- -AJ At� STATE wa ZIP 7 t' 3 FAX WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # NAME r, ^� 1 ` s4v-(A 7,7-,7 PRIMARY PHONE ' _ V t MAILING ADDRESS o p sa. a 30b E-MAIL APPLICANT CITY^ STATE V_~p_ Zq FAX NAME PRIMARY PHONE PROJECT CONTACT MAILING ADDRESS E-MAIL (The individual to receive and respond to all correspondence CITY STATE ZIP FAX concerning this application) PROJECT FINANCING NAME OWNER -FINANCED Required value of $5,000 or more (RCW 19.27095) MAILING ADDRESS, CITY, STATE, ZIP PHONE I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal Iaws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of th a plication. '161 ' d - SIGNATURE: DATE 9'11611d- - PRINT NAME: (A - PRINT Bulletin # 100 - January 1, 2013 Page I of 3 UHandoutsTermit Application