17-102734I- {
c- s
Electrical
C7tyufFederAWay FILEPermit#• -C�anity Development Dept, 17 102734 -
00 -EL
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 8352607 Fax (253) 8352609
Project Name: AVERY AT THE RESERVE APARTMENTS BLDG 29 UNIT 202
Project Address: 125 SW CAMPUS DR Parcel Number: 192104 9017
Project Description: Replace lights, dishwasher, hood, GFCI on the bathroom and (2) outlets in the kitchen.
Owner
Applicant
Contractor
CA RESERVICE OWNER LLC
CARLOS OROPEZAHI VOLTS ELECTRIC
HI VOLTS ELECTRIC LLC
3990 RUFFIN RD SUITE 100
LLC
HIVOLVE884KN (5/15/18)
SAN DIEGO CA 92123
34008 9TH AVE S SUITE 120
34008 9TH AVE S SUITE 120
FEDERAL WAY WA 98003
USA
FEDERAL WAY WA 98023
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
PERMIT EXPIRES Thursday, 7 June, 2018
Permit Issued on Wednesday, June 7, 2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
vv n
THIS CARD IS TO REMAIN ON-SITE
Federal WayConstruction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERIMT #: 1710273400 Address: 125 SW CAMPUS DR Bldg 29
Project: CA RESERVICE OWNER LLC FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0
UFER Ground (4295)
0
Ditch cover (4030)
Temporary Power (4275)
0
Slab/Concrete Floor (4255)
Right of Way
Approved
IBY
Approved
Approved
Approved
Approved to place concrete
By
Date
By
Date
Date
By
Date
®
Pool Bonding (4195)
®
El
Temporary Power (4275)
®
Service (4235)
Right of Way
Approved
IBY
IBY
Approved
Approved
Approved
By
Date
By
Date
Date
By
Date
El
Feeders/Sub-panels (4045)
®
Rough Electrical (4225)
Final Electrical
0
Ceiling Cover (4020)
Right of Way
Approved
IBY
Approved
Approved
Approved
By
Date
By
Date
By
Date
® Final - Electrical (4055)
Approved
I.
By Date t'I•g��
Rough Electrical
Final Electrical
E]
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date