11-101712r w
City of Federal Way
Community Development Services
P.O. Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: TYUTYUNNIK
Project Address: 33017 36TH AVE SW
Project Description: REMOVE/REPLACE GAS WATER HEATER
Med anlcal
Permit #: 11 -101712 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number: 873213 0300
Owner
Applicant
Contractor
SERGEY & OLGA TYUTYUNNIK
JULIE CASKEY
FAST WATER HEATER CO (GENERAL)
33017 36TH AVE SW
FAST WATER HEATER COMPANY
FASTWWH948BC (1/4/12)
FEDERAL WAY WA 98023
12601 132ND AVE NE
12601 132ND AVE NE
KIRKLAND WA 98034
KIRKLAND WA 98034
Mechanical Valuation............................................1169
Hot Water Tanks ............................ 1
Is this an Online or O.T.C. application?.................Yes
PERMIT EXPIRES Monday, October 31, 2011
Permit Issued on Wednesday, May 4, 2011
1 hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
� and the City of Federal Way.
Owner or agent: &JL" -e Date: r -?b) I (r'
THIS CARD IS TOMAIN ON-SITE
•
C" or- Construction In ection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 11 -101712 -00 -ME Address: 33017 36TH AVE SW
Project: SERGEY & OLGA TYUTYUNNIK FEDERAL WAY, WA 98023-2615
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
r
Mechanical Rough -in (4165)Gas
Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Dat
r
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date