10-102806City of Federal Way
Community Development Services
P.O. Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
Mechanical
Permit #: 10 -10206 -00 -ME
Project Name: GUILAO
Project Address: 31704 42ND AVE SW
Project Description: REPLACE 40 GALLON HOT WATER HEATER
Inspection Request Line: (253) 835-3050
2 to $a
Parcel Number: 873198 2730
Ownr
Applicant
Contractor
THELMA AND ROY GUILAO
WESCO NORTHWEST PERMIT
WASHINGTON ENERGY SERVICES CO
31704 42ND AVE S
NORTHWEST PERMIT/ WESCO
(GENERAL)
FEDERAL WAY WA 98023-2175
1345 W GULF RD
WASI-HES97IOB (9/2/11)
POINT ROBERTS WA 98281
2800 THORNDYKE AVE W
SEATTLE WA 98199
Mechanical Valuation............................................750
Is this an Online or O.T.C. application?.................Yes
Hot Water Tanks ............................ 1
PERMIT EXPIRES Tuesday, December 28, 2010
Permit Issued on Thursday, July 1, 2010
1 hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way. '
Owner oragent: ONLItAir / Date: '
0
FtMM4e:> iz1qAo
THIS CARD IS TOAIN ON-SITE
crcncF Construction Ins ction Record
Federal Way INSPECTION REQU TS: (253) 835-3050
PERMIT #: 10 -102806 -00 -ME Address: 31704 42ND AVE SW
Owner: THELMA AND ROY GUILAO FEDERAL WAY, WA 98023-2175
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Rough Electrical
Approved
Piping (4125)
Final - Mechanical (4065)
Approved
Right of Way
Approved
Approved to release test
By
Approved
By
Date
By
Date
By
Date
❑
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date