14-103525c
City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
112h: (253) 835-2607 Fax: (253) 835-2609
Project Name: CHAN
BILE
Project Address: 32608 49TH CT SW
Project Description: change out gas furnace and water heater
Mecl anical
Permit #: 14 -103525 -00 -ME
Inspection Request Line: (253) 835,3050
Parcel Number: 873219 0830
Owner
guRlicant
Contractor
MATTHEW N CHAN
JAIMIE HOW
BRENNAN HEATING & A/C LLC
JOANNE F CHAN
BRENNAN HEATING & A/C
(GENERAL)
30809 36TH CT SW
4601 S 134TH PL
BRENNHA971R9 (12/29/15)
FEDERAL WAY WA
SEATTLE WA 98168
4601 S 134TH PL
98023
MKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Furnaces ......................................... 1 Hot Water Tanks............................ .1
PERMIT EXPIRES Monday, January 12, 2015
Permit Issued on Wednesday, July 16, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
,,, and the Ci of Federal Way.
Owner w agent: Date:
111111111VIIIII'Mula
S
CITY OF
Federal Way
PERMIT #:
14 -103525 -00 -ME
THIS CARD IS TOMAIN ON-SITE
Construction In ection Record
INSPECTION REQ TS: (253) 835-3050
Address: 32608 49TH CT SW
Project: MATTHEW N CHAN FEDERAL WAY, WA 98023-1917
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)
Gas Piping (4125)11
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By Date
Date
Cjv�,, t
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date