Loading...
16-102909A Mechanical City of Federal Way Community & Econ: Dev. Services Permit #: 16 -102909 -00 -ME 33325 8th Ave S FILE Federal way. WA 98003 Inspection Request Line: 253 83 Ph: (253) 835-2807 Fax: (253) 835-2809 p eQ � � 5,3050 Project Name: QUINTANA Project Address: 32939 49TH PL SW Parcel Number: 8029510220 Project Description: Change out existing gas furnace and add 4 ton Air Conditioner. Electrical connection for gas furnace replacement. Owner AR.licant Contractor ANTHONY M QUINTANA JAIMIE HOW BRENNAN HEATING & A/C LLC (GENERAL DEBORAH G QUINTANA BRENNAN HEATING & A/C 01) 32939 49TH PL SW 4601 S 134TH PL BRENNHA971R9 (12/29/17) FEDERAL WAY WA 98023 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Work Valuation?.................................11195 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Air Conditioners - Stand Alone Un 1 Furnaces ......................................... 1 PERMIT EXPIRES Sunday, December 112016 Permit Issued on Tuesday, June 14, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington anthe Ci of I Way. Owner or agent Date: crnr can II�� THIS CARD IS TO ON-SITE • Federal /�� Construction In ectil Record �"J INSPECTION REQ TS: (253} 833050 PERMIT #: 16 -102909 -00 -ME Address: 32939 49TH PL SW Project: ANTHONY M QUINTANA FEDERAL WAY, WA 98023-3326 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (41 Gas Piping ❑ Final- Mechanical Appmved Right of Way —, Approved to release test Approved By Date By Date Date _ Z Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way —, By Date By Date By Date