Loading...
11-100529Project Name: FAITHFULL Project Address: 31021 50TH AVE SW Project Description: Replace existing water heater ` ! Plumbing Permit #: 11 -100529 -00 -PL Inspection Request Line: (253) 835-3050 Parcel Number: 184090 0010 Owner Applicant City of Federal Way LUCIA FAITHFULL Community Development Services FILt P.O. Box 9718 AUBURN MECHANICAL INC Federal Way, WA 98063-9718 FEDERAL WAY WA Ph: (253) 835-2607 Fax: (253) 835-2609 2623 W VALLEY HWY N Project Name: FAITHFULL Project Address: 31021 50TH AVE SW Project Description: Replace existing water heater ` ! Plumbing Permit #: 11 -100529 -00 -PL Inspection Request Line: (253) 835-3050 Parcel Number: 184090 0010 Owner Applicant Contractor LUCIA FAITHFULL CHRISTINE JOHNSON AUBURN MECHANICAL INC 31021 50TH AVE SW AUBURN MECHANICAL INC AUBURMII63BA (9/12/12) FEDERAL WAY WA 2623 W VALLEY HWY N 2623 W VALLEY HWY N 98023-2006 AUBURN WA 98001 AUBURN WA 98001 Water Heaters ................................. 1 PERMIT EXPIRES Monday, August 8, 2011 Permit Issued on Wednesday, February 9, 2011 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy, and the use will be in accordance with the laws,t:rules and regulations of the State of Washington and the City of Federal Way. QLU .1kir , P Owner or agent: Date: j,�* 0 -0 THIS CARD IS TO R IN ON-SITE Crff Fe Construction Ins tion Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 11 -100529 -00 -PL Address: 31021 50TH AVE SW Project: LUCIA FAITHFULL FEDERAL WAY, WA 98023-2006 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Final - Plumbing (4075) Approved Date Plumbing Groundwork (4190) E] Rough Plumbing (4230)Gas Final Electrical Approved Piping (4125) 1:1Approved Approved to cover By Approved Approved to release test By Date By Date By Date Final - Plumbing (4075) Approved Date Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date