Loading...
13-1030311-1 Mechanical Permit #: 13 -103031 -00 -ME Inspection Request Line: (253) 835-3050 Project Name: BELL '�0 41 Project Address: 31222 41ST PL SW Parcel Number: 873199 0085 Project Description: Replacing existing Furnace with New Furnace Owner A nAg; licant Contractor IAN D BELL City of Federal way ANDERSON NESLER COMPANY INC Community & Econ. Dev. Services ANDERSON NESLER COMPANY 33325 8th Ave S FILE Federal Way, WA 98003 PO BOX 597 Ph: (253) 835-2607 Fax: (253) 835-2609 PACIFIC WA 98047 1-1 Mechanical Permit #: 13 -103031 -00 -ME Inspection Request Line: (253) 835-3050 Project Name: BELL '�0 41 Project Address: 31222 41ST PL SW Parcel Number: 873199 0085 Project Description: Replacing existing Furnace with New Furnace Owner A nAg; licant Contractor IAN D BELL CHARLIE NESLER ANDERSON NESLER COMPANY INC JERETTA E BELL ANDERSON NESLER COMPANY ANDERNC921JP (4/17/14) 31222 41ST PL SW 136 STEWART RD SE SUITE 1G PO BOX 597 FEDERAL WAY WA PACIFIC WA 98047 MILTON WA 98354 98023 x Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures' Furnaces ......................................... 1 PERMIT EXPIRES Monday, January 6, 2014 Permit Issued on Wednesday, July 10, 2013 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent OL I I Ilk I viwiii Date: r�. THIS CARD IS TO MAIN ON-SITE CITY OF ! Construction In ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 13 -103031 -00 -ME Address: 31222 41ST PL SW Project: IAN D BELL FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Approved Piping (4125) Approved to release test Final Electrical Final - Mechanical (4065) Approved By Date By Date By Date Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date