Loading...
10-102957City of Federal Way Community Development Services P.O. Box 9718 J Federal Way, WA 98063-9718 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BARBER SHOP Project Address: 30315 PACIFIC HWY S • Building - Commercial Permit #: 10 -102957 -00 -CO Inspection Request Line: (253) 835-3050 Parcel Number: 042104 9237 Project Description: TI - Landlord portion of tenant improvements including suspended ceiling. Mechanical for ductwork; no plumbing. Owner Applicant Contractor Lender VAN WONG PRIME CONSTRUCTION & PRIME CONSTRUCTION & VC INVESTMENTS LLC DEVELOPMENT DEVELOPMENT 2101 SE 2ND PL 7728 228TH ST SW PRIMECD925RK (12/12/10) RENTON WA 98056-8864 EDMONDS WA 98026 7728 228TH ST SW EDMONDS WA 98026 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 _ Occupancy Class: B Construction Type: Type V - B Occupancy Load: Floor Areas . ft. 1,415 1 0 1 0 1 0 Existing Sprinkler System in Building?.................No Mechanical to be Included ......... .......::.........Yes Number of Stories.................................................1 Permit for Building Shell Only? .............................. No Plumbing to be Included?.......................................No New / Additional Sq. Feet - Total.......................... 0 Occupancy # 1 -Use ............................................... Barber/Beauty Shop Zoning Designation ..................................... :.......... BC 1NWfixtures Assn+ lai dtt� l CONDITIONS: Subject to field inspection with plans. PERMIT EXPIRES Sunday, January 9, 2011 Permit Issued on Tuesday, July 13, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and ft use wilt be its aocordanoe with the laws, rules and reguietions of the State of Washington an�the ty of Federal Way. Owner or agent: — Date: C� Cn-r OF Federal Way PERMIT #: Owner: THIS CARD IS TO REMAIN ON-SITE Construction Inction Record INSPECTION REQ S: (253) 835-3050 10 -102957 -00 -CO Address: 30315 PACIFIC HM S VAN VUONG FEDERAL WAY, WA 98003-4124 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg (4400) El Initial Erosion Control (4365) ❑ Footings/Setback (4110) Approved to insulate Approved Approved to install wallboard To be done prior to breaking ground Approved to install mud & tape Approved to place concrete By Date By Date By Date ❑ Re -steel (4215) El El Slab/Concrete Floor (4255) Date Approved to insulate Underfloor Framing (4285) Approved to install wallboard Approved to place concrete or grout Approved to install mud & tape Approved Approved to place concrete Date Date Approved to sheath floor By Date By Date ❑ By Date ❑ Mechanical Rough -in (4165) Approved By _25�' Date ;/r/, Interim Erosion Control (4370) Approved By - Date Gas Piping (4125) Approved to release test By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Floor Sheathing (4105) El Approved to install flooring By Date Approved to insulate Approved to install wallboard Fire/Draft Stops (4095) Approved to install mud & tape Approved By Date ❑ Mechanical Rough -in (4165) Approved By _25�' Date ;/r/, Interim Erosion Control (4370) Approved By - Date Gas Piping (4125) Approved to release test By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Framing (4120) El Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) Approved to insulate Approved to install wallboard Approved to install mud & tape By Date By Date By Date ❑ Suspended Ceiling Grid (4265) Final - Fire Department (4060) Final - Planning (4070) Approved to drop tile Approved Approved By Date rz ^ By Date By Date E] Final Erosion Control (4375) Final - Mechanical (4065) Final - Building (4050) Approved Approved Approved By Date ByW'j Dat _ .1 By Date Q ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date AO - 0 � __!!L -5 JL - co PL DE EN FP %pap SITE ADDRESS CD5 4 SUITE/UNIT # F - ederalWay RECEIVEOPERM IT COMWWITY DEVELOPMENT SERVICES '& 1)PLICATION 2.5:3-835-2607• FAX 253-835-2609 - JUL ZONINd WAY $ rry OF FEDERAL AO - 0 � __!!L -5 JL - co PL DE EN FP %pap SITE ADDRESS CD5 4 SUITE/UNIT # '3 c �4 i �- PROJECT VALUATION ZONINd dSSESSOR'S TAX/PARCEL # $ a, j - TYPE OF PERMIT XBUILDING El PLUMBING 2'MECHANICAL 0 DEMOLITION L1 ENGINEERING D FIRE PREVENTION NAME OF PROJECT (Terimir Natoelliorwow7wr Lost Nari2e) 12 C L PROJECT DESCRIPTION f Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER MAILING ADDRESS E-MAIL �2-"C' CITY� STATE! I Z71- �1, " (-.-. NAME PHONE MAILING ADDRESS 11-1L4 6c E-MAIL CONTRACTOR I.LA-ve CITY! 1 STA?l 4ZEP `7 /FAX WA S*TE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # 44 NAME PHONE APPLICANT MAILING ADDRESS E-MAIL CITY STATE ZIP FAX PROJECT CONTACT NAME PHONE (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence concerning this application) ao_ aL loc V-0 CITY STATE ZIP FAX ALTERNATE CONTACT NAME: PHONE E-MAIL PROJECT FINANCING NAME E] OWNER -FINANCED Required value of $5, 000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW19.27095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. r certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. rfurther agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as apart of this application. SIGNATURE: DATE PRINT NAME: Bulletin #100 — April 14, 2010 Pagel of k:\Handouts\Perrnit Application e (54 -1 VALUE OF MECHANICAL WORK $ D, V (a copy of bid or estimate must be provided) Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS QTHER (Describ�)� AIR CONDITIONER FIREPLACE INSERTS HOODS (commercmq BOILERS FURNACES HOT WATER TANKS Ices) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES In how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. BATHTUBS (or Tub/Shower combo) LAVS (Ii—dSmk.) TOILETS WATER PIPING DISHrBIBBS URINALS OTHER (Describe) DRAI SHOWERS VACUUM BREAKERS DRINFOUNTAINS SINKS (kitchen/Utility) WATER HEATERS (mectne) HOS_ SUMPS WASHING MACHINES CRITICAL AREAS ON PROPERTY? WATERPURVE SEWER PURVEYOR VALUE OF EXISTING IMPROVEME NTS EXISTING (PREVIOUS USE LOT SIZE (In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESS N SYSTEM? i-, Yes Ei ,No El Yes G3� FOR OFFICE USE - - i:i;E<::;i:_.:n;:'i?>.<"fE'ir i; ii`ii`iisi2asit)aai'<isiitiisiist};ittiii?`i`?i ........................... ........... :....::::........................................::v:................................ .. ... :. ... .) ... .. }:: -y .ffiffi:•: isp: ':: iii:•i::ii4%'i i'iii:: ilii: iiiiiii:•ii:i:iii:::?:!4iiiii:+.;ii<::<i::<:::jjy: ;: ;i:ii:;•iiiiiii:: is •j4re.g... :.::::::::::::::: :..>i::•ii:.:.i::.>::.»:.::::::::::::::.>:.>:.>:.::»>:.::o:.::.s:.;:>i>:>i>i::i. '..'.. :y,,. .. .:...R ...... F:^.9 '................3V...l:?:.........................:............................................... :..ii:•::.i•.::.i?: iii>i>:•:ii:ii>ii>::i:•i:o-i>: i::isii:::;.>::i>:;.>:•ii;:cii:•>....3i.%3:..:.:.:.:..::: V::}.T.,................................................. ....:.:.:.................................... AREA DESCRIPTION Area Occupancy Groups) Construction # of Additional Information c ..,.e ase+ TvDe Stories Bulletin #100 — April 14, 2010 Page 2 of 3 k:\-Iandouts\Pemut Application