Loading...
11-10155340 , City of Federal Way Community Development Services P.O. Box 9718 Federal Way, WA 98063-9718 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BARRIGA LLENA Project Address: 30420 PACIFIC HWY S Suite 2 Ouilding - Comkziercial Permit #: 11 -101553 -00 -CO CInspection Request Line: (253) 835-3050 Parcel Number: 092104 9107 Project Description: REP - Fire repair to kitchen, new insulation. Non-structural wall in bathroom to be replaced. Separate electrical permit. Owner Applicant Contracto Lender EUGENE LOHER CHRIS ANABLE POSSIBILITIES UNLIMITED 30406 PACIFIC HWY S UNIT A ANABLE SOLUTIONS POSSIU*0440K (1/21/12) FEDERAL WAY, WA 98003-5129 PO BOX 747 28908 SW 371ST ST RAVENSDALE WA 98051 FEDERAL WAY WA 98022 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Areas . ft. 0 1 0 0 1 0 New / Additional Sq. Feet - 3rd Floor....................0 Mechanical to be Included?....................................No New / Additional Sq. Feet - Basement...................0 Plumbing to be Included?.......................................No CONDITIONS: Subject to field inspection without plans PERMIT EXPIRES Sunday, October 30, 2011 Permit Issued on Tuesday, May 3, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington C nd the City o Federal Way. Owner or agent: Date: F I Npd,�&'D 8 /1511 CrrY OF Federal Way PERMIT #: 11 -101553 -00 -CO THIS CARD IS TO REMAIN ON-SITE Construction I>iection Record INSPECTION REQ TS: (253) 835-3050 Address: 30420 PACIFIC HWY S Suite 2 Project: EUGENE LOHER FEDERAL WAY, WA Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Site Mtg (4400)Initial Erosion Control (4365) Footings/Setback (4110) By Approved By To be done prior to breaking ground By Approved to place concrete By Date By Date By Date Foundation Wall (4115) Drainage/Downspout (4040)Re-steel (4215) By Approved to place concrete By Approved to backfill By Approved to place concrete or grout By Date By Date By Date E] ❑ Slab/Concrete Floor (4255) Underfloor Framing (4285) ❑ Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date Shear Walls (4245)0 Roof Sheathing (4220) Fire/Draft Stops (4095) Approved to install siding Approved to install roofing Approved By Date Date,5 -4— By,, Date f q,l Prior to scheduling a Framing inspection; Q Interim Erosion Control (4370) Framing (4120) Approved Electrical, Plumbing & Mechanical Rough -in and Approved to insulate By Date Fire/Draft Stop inspections must be signed -off and By Date �� approved. IBC 109.3.4 Insulation (4150) Gypsum Wallboard Nailing (4130) Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date 7 -��. �� By Date �- 2� By Date ❑ Final - Fire Department (4060) Final Erosion Control (4375) Final - Building (4050) Approved Approved Approved By /42Z Date `/u -P By Date By `� Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date