Loading...
13-100353City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 FILE Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: KEMBLE Project Address: 33314 40TH AVE SW Project Description: Gas to gas water heater replacement. Mechanical Permit #: 13 -100353 -00 -ME Inspection Request Line: (253) 8353050 Parcel Number: 327900 0400 Owne Awa Contractor DAVID G KEMBLE WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO 33314 40TH AVE SW NORTHWEST PERMIT/ WESCO (GENERAL) FEDERAL WAY WA 98023 1345 W GULF RD WASIRES9710B (9/2/13) POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures'' Hot Water Tanks ........................... 1 PERMIT EXPIRES Monday, July 22, 2013 Permit Issued on Wednesday, January 23, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: IRWE'l N� F(PA l/Zq/l3 CITY OF VAI� Federal Way PERMIT #: is THIS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQ TS: (253) 835-3050 13 -100353 -00 -ME Address: 33314 40TH AVE SW Project: DAVID G KEMBLE FEDERAL WAY, WA 98023-2914 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough -in (4165)13 Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) 1:1Approved Approved By Approved to release test Approved By Date By Date By Date —O-/& El Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date