Loading...
11-104278 v ' M , t " ' R Mechanical • City of Federal Way * .{{.�� Community Development Services Permit #: 11 -104278-00-ME P.O.Box 9718 Federal Way,WA 98063-9718 FILE Ph:(253)835-2607 Fax(253)835-2609 Inspection Request Line: (253)835-3050 Project Name: HELLER ACOR Project Address: 648 SW 299TH ST Parcel Number: 233680 0030 Project Description: Remove and replace gas furnace and hot water tank Owner Applicant Contractor LINDA HELLER SARAH TURNER GLENDALE HEATING&A/C 648 SW 299TH ST GLENDALE HEATING&A/C GLENDHA053Q2 (11/2/13) FEDERAL WAY WA 98023 12462 DES MOINES WAY S 12462 DES MOINES WAY S SEATTLE WA 98168-2266 SEATTLE WA 98168-2266 Mechanical Valuation 4260.92 Is this an Online or O.T.C.application? Yes _ Furnaces 1 Hot Water Tanks 1 PERMIT EXPIRES Tuesday, April 17, 2012 Permit Issued on Thursday, October 20, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington Way. Owner or agent: 0NLiiNE Date: 10/z041 PINAtii;i0 4/ /(Z ' .THIS CARD IS TO MAIN ON-SITE ' CAmok �OF Construction I ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT#: 11-104278-00-ME Address: 648 SW 299TH ST Project: LINDA HELLER FEDERAL WAY, WA 98023-3557 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) ❑ Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By c Date i-'�.> f2....., Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date