Loading...
16-100716Mechahical City of Fedealay CommunityB EconrDev. Services Permit #: 16 -100716 -00 -ME 33325 8th Ave S Federal way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Inspection Request Line: (25 3) 835-3050 Project Name: MCVICIKER Project Address: 1513 SW 306TH ST Parcel Number: 514930 0240 Project Description: Replace Gas Water Heater Owner Applicant Contractor REBECCA I MCVICKER NORTHWEST PERMIT/ WESCO WASHINGTON ENERGY SERVICES CO 1513 SW 306TH 1345 W GULF RD (GENERAL) FEDERAL WAY WA POINT ROBERTS WA 98281 WASIHES851NS (9/7/17) 98023 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Mechanical Work Valuation?.................................1500 Hot Water Tanks ............................ Is this an Online or O.T.C. application? ................. es Mechanical Fixtures PERMIT EXPIRES Monday, August 8, 2016 Permit Issued on Wednesday, February 10, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and theCi of Federal Way. Owner or agent Date: . THIS CARD IS TOFZ: IN ON-SITE CITY of ., Federal Wa Construction Intion Record y INSPECTION REQU (253) 835-3050 PERMIT #: 16 -100716 -00 -ME Address: 1513 SW 306TH ST Project: REBECCA I MCVICKER FEDERAL WAY, WA 98023-3427 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date Date 3 _l (p — 1( Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date