16-102123_
Mechanical
City of Comm nity & Econ. Dev. Services Permit #: 16 -102123 -00 -ME
33325 8th Ave S FILE
Federal way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (2
53) 835-3050
Project Name: WALTERS
Project -Address: 125 SW.3033RRsD SST Parcel Number: 233730 0140
Project Description: Replace 40'61 water heater
Owner
A li�cant
Contractor
GERALDINE A WALTERS
ETHAN ONAT
WASHINGTON ENERGY SERVICES CO
JAMES A WALTERS
WASHINGTON ENERGY SERVICES CO
(GENERAL)
225 SW 303RD ST
3909 196TH ST SW
WASMES85INS (9/7/17)
FEDERAL WAY WA
LYNNWOOD WA 98036
3909196TH ST SW
98023
LYNNWOOD WA 98036
Additional Permit Information
Mechanical Work Valuation?.................................1332.90 Is this an Online or O.T.C. application? ................. Yes
Hot Water Tanks. ..........................
Mechanical Fixtures' s
1
PERMIT EXPIRES Monday, October 31, 2016
Permit Issued on Wednesday, May 4, 2016
hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: K I I I K I r. Date:
f \XANVe"
THIS CARD IS TO ON-SITE
CITY OF • - - Construction In ection Record
Federal Way INSPECTION REQ TS: (253) 835-3050
PERMIT #: 16 -102123 -00 -ME Address: 225 SW 303RD ST
Project: GERALDINE A WALTERS FEDERAL WAY, WA 98023-3935
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
❑
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Mei Date 9- 12, I y
Rough Electrical
Approved
Final Electrical
Approved
❑
Right of Way
Approved
By
Date
By
Date
By
Date