Loading...
16-102123_ Mechanical City of Comm nity & Econ. Dev. Services Permit #: 16 -102123 -00 -ME 33325 8th Ave S FILE Federal way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (2 53) 835-3050 Project Name: WALTERS Project -Address: 125 SW.3033RRsD SST Parcel Number: 233730 0140 Project Description: Replace 40'61 water heater Owner A li�cant Contractor GERALDINE A WALTERS ETHAN ONAT WASHINGTON ENERGY SERVICES CO JAMES A WALTERS WASHINGTON ENERGY SERVICES CO (GENERAL) 225 SW 303RD ST 3909 196TH ST SW WASMES85INS (9/7/17) FEDERAL WAY WA LYNNWOOD WA 98036 3909196TH ST SW 98023 LYNNWOOD WA 98036 Additional Permit Information Mechanical Work Valuation?.................................1332.90 Is this an Online or O.T.C. application? ................. Yes Hot Water Tanks. .......................... Mechanical Fixtures' s 1 PERMIT EXPIRES Monday, October 31, 2016 Permit Issued on Wednesday, May 4, 2016 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: K I I I K I r. Date: f \XANVe" THIS CARD IS TO ON-SITE CITY OF • - - Construction In ection Record Federal Way INSPECTION REQ TS: (253) 835-3050 PERMIT #: 16 -102123 -00 -ME Address: 225 SW 303RD ST Project: GERALDINE A WALTERS FEDERAL WAY, WA 98023-3935 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) ❑ Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) ❑ Approved By Approved to release test Approved By Date By Date By Mei Date 9- 12, I y Rough Electrical Approved Final Electrical Approved ❑ Right of Way Approved By Date By Date By Date