Loading...
12-103468City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2807 Fax: (253) 835-2809 Project Name: SHELLEY Project Address: 29635 20TH PL SW wilding - Single Family Permit #: 12 -10346$ -00 -SF Inspection Request Line: (253) 835-3050 30a! � Parcel Number: 012103 9003 Project Description: ADD - Construction of 156 square foot detached storage shed (in shoreline setback). Owner ARRlicant Contractor Lender PETER SHELLEY TERRY JENSEN TERRY JENSEN CONSTRUCTION PETER SHELLEY 29635 20TH PL SW PO BOX 1326 CORP 32123 1ST WAY S FEDERAL WAY WA ISSAQUAH WA 98027 TERRYJC0160Z (5/28/13) FEDERAL WAY WA 98003 PO BOX 1326 ISSAQUAH WA 98027-0053 Census Category: 434 - Residential altladd - no change in number of units Includes. #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load Floor Areas . ft. 0 0 1 0 0 Additional Permit Information New / Additional Sq. Feet -1 st Floor .................... 0 New / Additional Sq. Feet - 3rd Floor....................0 BasicPlan?........................................................... No New / Additional Sq. Feet - Garage.......................0 New / Additional Sq. Feet - Other ..........................156 New / Additional Sq. Feet - Total .......................... 156 New / Additional Sq. Feet - 2nd Floor...................0 New / Additional Sq. Feet - Basement...................0 New / Additional Sq. Feet - Deck .......................... 0 Mechanical to be Included?...................................No Plumbing to be Included?......................................No Zoning Designation...............................................RS 15.0 No Fixtures Associated With This Permit It PERMIT EXPIRES Monday, February 25, 2013 Permit Issued on Wednesday, August 29, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington nd the City of Federal Way. Owner or agent: Date: 0 _ /-- V FINbL1.la� 1�3�13 CITY OF `� Federal Way PERMIT #: 12 -103468 -00 -SF THIS CARD IS TO REMAIN ON-SITE Construction In Record INSPECTION REQ TS: (253) 835-3050 Address: 29635 20TH PL SW Project: PETER SHELLEY FEDERAL WAY, WA 98003-4241 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Site Mtg (4400) Initial Erosion Control (4365) Footings/Setback (41 0) Approved To be done prior to breaking ground Approved to place concrete By I Date By /113 Date By Date Hoof Sheathing (4220) Approved to install roofing By y iG/ "ate % y Approved x 2/_ Date IZ - Z Z - /Z 11 By Approved Date Prior to scheduling a Framing inspection; Foundation Wall (4115) Framing (4120) Insulation (4150) Electrical, Plumbing & Mechanical Rough -in and Drainage/Downspout (4040) Slab/Concrete Floor (4255) Approved to install wallboard Approved to place concrete By Date 1Z - ZZ r t Z Approved to backfill L 4 Date Gypsum Wallboard Nailing (4130) Approved to place concrete By Date - ,� _ By Date By Date 9 lr Underfloor Framing (4285) Approved By Date By Date By Floor Sheathing (4105) Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date �$ Hoof Sheathing (4220) Approved to install roofing By y iG/ "ate % y Approved x 2/_ Date IZ - Z Z - /Z 11 By Approved Date Prior to scheduling a Framing inspection; Rough Electrical Approved Framing (4120) Insulation (4150) Electrical, Plumbing & Mechanical Rough -in and Approved to insulate By Approved to install wallboard Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3A By Date 1Z - ZZ r t Z By L 4 Date Gypsum Wallboard Nailing (4130) 0 Final Erosion Control (4375) Final - Building (4050) Approved to install mud & tape Approved Approved By Date By Date By ' /`�! Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date 100 , Fe PERMIT Federal Way C IVE� COMMUNITY DEVELOPMENT SERVECES p p L I CAT I O N 253-835-2607• FAX 253-835.2609 wta.-w.tituo(federalwau.roM �� 2 J __�sn►.WAY �43- --/- U --,/- -k If - MF CO ME PL DE EN FP ?I/y/ /A1-00 SITE ADDRESSC.•n1 Q vS 6 S �� � 0 rki PC. C, SUITE/UNIT M PROJECT VALUATION ZONING ASSESSOR'S TAR/PARCEL $ 156(D 1 -0--LZ-L CL- 3 - TYPE OF PERMIT BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT (Tenant Name/HomeoumerLast Name) J J PROJECT DESCRIPTION Detailed description of work to S %f C be included on this permit only PROPERTY OWNER NA19_e 2 SWR PRIMARY PHONE MAILWG ADDRESS n _ c .ail A/ E-MAIL CITY �v STATE ' ZIP `l4'd z NAME_ R A ��i�-� /moi. s CO ^'ST PHONE S - 5S - 9SDC > �t MAmDt • %0_1 Z aj CONTRACTOR CITY 5e4 Atg n,; ZIP �62 FAX WA STATE CIONTRACTOWS LICENSE Y Ll Zit c C 0 EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE X NAME A PHONE APPLICANT MAILING ADDRESS E-MAIL CITY 7iTATEl ZIP FAX PROJECT CONTACT NAME PHONE (Tice individual to receive and %2m" WMAH, respond to all correspondence MAILING ADDRESS concerning this application) CITY STATE ZIP FAX ALTERNATE CONTACT NAME: PHONE E-MAIL PROJECT FINANCING NAME � ~ ❑ OWNER -FINANCED Required value of $5,000 or more Required rvQ MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as apart of this application. SIGNATURE: DATE 7 I'f PRINT NAME: 67 Bulletin #100 — January 1, 2011 Page 1 of 3 k:\Handouts\Permit Application -41 Ph. 253-896-1011 RAUBMITf ED AUG 072012 0 GeoResources, LLC 5007 Pacific Hwy. E, Suite 16 Fife Washington 98424 Fg.253-896-2633 CITY OFFEDERAL WAY CLYb July 16, 2012 The Shelley Family c/o Terry Jensen Custom Homes PO Box 1326 Issaquah, Washington 98027-0058 (425) 557-9500 Updated Geologic Hazard Assessment Proposed Shed 29635 — 20th Place SW Federal Way, Washington PN: 012103-9003 Job: Shelley.20thPIS.GHA.0 This letter presents the results of our geologic hazard assessment for the proposed shed to be located landward of the shoreline cabana at 29635 — 20th Place SW in the Lakota/Adelaide area of Federal Way, Washington. The location of the proposed site configuration is included on Figure 1. Our understanding of the project is based on our discussions with you, our September 21, 2011 and May 24, 2012 site visits, and our experience in the area. We completed a Geologic Hazard Assessment for the shoreline cabana dated October 4, 2011. We understand the City of Federal Way is requiring an assessment to address impactsof the proposed 12 foot by 13 foot shed to replace an existing shed on the site. The proposed shed replacement will be located into the toe of the slope and landward of the shoreline cabana. The recommendations in our previously prepared Geologic Hazard Assessment remain applicable to the site, given the proposed improvements. As stated in the previous assessment; no erosion, landslide, seismic, or steep slope hazard existing on the site. In our opinion, the proposed shed will not create any new adverse affects to the site or adjacent areas. We have appreciated working for you on this project. Please do not hesitate to call at your earliest convenience if you have any questions or commL tni-- Respectfully submitted, GeoResources, LLC Renee M. Phillips, GIT Staff Geologist RMP:KSS:rmp Doc ID: Shelley.20thPIS.GHA.0 Attachment Figure 1: Site Plan KEITH SCOTT SCHEMES Keith S. Schembs, LEG Principal • 0