14-101426•
'
City of Federal Way
GLADYS WILLIAMS
Community & Econ. Dev. Services
33325 8th Ave S
WASHINGTON ENERGY SERVICES CO
Federal Way, WA 98003
W
FILE
Ph: (253) 835-2807 Fax (253) 835-2809
34421 25TH AVE SW
Project Name: WH LIAMS
Project Address: 34421 25TH AVE SW
Project Description: gas to gas water heater replacement
0 Mechanical
Permit #: 14 -101426 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number: 011470 0030
Owner
AR1211can
Contractor
GLADYS WILLIAMS
NORTHWEST PERMIT/ WESCO
WASHINGTON ENERGY SERVICES CO
ROBERT L WILLIAMS
1345 W GULF RD
(GENERAL)
34421 25TH AVE SW
POINT ROBERTS WA 98281
WASMES9710B (9/2/15)
FEDERAL WAY WA 98023-3014
2800 THORNDYKE AVE W
SEATTLE WA 98199
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Hot Water Tanks ............................ 1
PERMIT EXPIRES Saturday, September 27, 2014
Permit Issued on Monday, March 31, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance2,0&.31
with the laws rules and regulations of the State of Washington
oON y
Owner oragent: Date:
rFINALED
J
OF V&
Feeral Way
PERMIT #:
Project:
14 -101426 -00 -ME
GLADYS WILLIAMS
THIS CARD IS TO ON-SITE
Construction In ecti4 Record
INSPECTION REQ TS: (253) 835-3050
Address: 34421 25TH AVE SW
FEDERAL WAY, WA 98023-3014
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Mechanical Rough -in 1 5)
as Piping (4 5)
Final - Mechanical (4065)
Approved
Approved to release test
ed
By Date
By Date
Y !, � Date
FILE
El
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date