Loading...
11-103511" City of Federal Way 0 Community Development Services P.O. Box 9718 Federal Way, WA 98063-9718 Ph: (253) 835-2607 Fax. (253) 835-2609 FILE Project Name: MCMULLIN Project Address: 211 SW 305TH ST 4§nilding - Single Family Permit #: 11 -103511 -00 -SF Inspection Request Line: (253) 835-3050 Parcel Number: 556000 0420 Project Description: REP - Intial inspection and assessment of fire damage. ***NO CONSTRUCTION WORK TO BE DONE ON THIS PERMIT*** Owne Applicant Contractor Lender JEREMY & LARA MCMULLIN ALLIANCE RESTORATION ALLIANCE RESTORATION 211 SW 305TH ST 18133 NE 68TH ST SUITE D-150 ALLIARS987LP (6/18/12) FEDERAL WAY WA 98023 REDMOND WA 98052 18133 NE 68TH ST SUITE D-150 REDMOND WA 98052 Census Category: 433 - Residential alt/add - increase in number of units Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Areas . ft. 0 0 0 0 New / Additional Sq. Feet - 3rd Floor....................0 Mechanical to be Included?....................................Yes �t>,,nfor �' ...� . ; New / Additional Sq. Feet - Basement .............. -A Plumbing to be Included?.......................................Yes . 1 1 v� Y"lshis Peri r'L` PERMIT EXPIRES Sunday, February 26, 2012 Permit Issued on Tuesday, August 30, 2011 1 hereby certify that th above information is correct and that the construction on the above described property and the occupancy and a use will be"n accordance with the laws, rules and regulations of the State of Washington -- and the City of Federal Way. Owner or agent: Date: F�;'4A," § OPINAtLPD s/af1/Il CITY of Federal Way PERMIT #: 11 -103511 -00 -SF THIS CARD IS TO MAIN ON-SITE Construction I ection Record INSPECTION REQUE TS: (253) 835-3050 Address: 211 SW 305TH ST Project: JEREMY & LARA MCMULLIN FEDERAL WAY, WA 98023-3949 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are log. -ed on the back of this card. Ei SWM Precon Site Mtg (4400)Initial Erosion Control (4365) Floor Sheathing (4105) Plumbing Groundwork (4190) Approved to insulate Approved By To be done prior to breaking ground By Approved to cover By Date By Date By Date Gas Piping (4125) Approved to release test By Date 11111011111111 Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. 1BC 109.3.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date Fire/Draft Stops (4095) Approved By Date 13 Interim Erosion Control (4370) Approved By Date Underfloor Framing (4285) ❑ Floor Sheathing (4105) Approved to insulate Shear Walls (4245) By Approved to sheath floor By Date Approved to install flooring By Date Approved to install siding By Date By Date By Date Roof Sheathing (4220) ❑ Rough Plumbing (4230) E] Mechanical Rough -in (4165) Approved to install roofing Approved Approved By Date By Date By Date Gas Piping (4125) Approved to release test By Date 11111011111111 Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. 1BC 109.3.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date Fire/Draft Stops (4095) Approved By Date 13 Interim Erosion Control (4370) Approved By Date El Framing (4120) Insulation (4150) Approved to insulate Right of Way Approved By Approved to install wallboard By Date Date By Date El Final Erosion Control (4375) Final - Mechanical (4065) Approved Right of Way Approved By Approved By Date Date By Date El Final - Plumbing (4075)Final - Building (4050) Approved Right of Way Approved By Approved By Date Date By Date El Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date cm os 'A Federal Way COMMUN17YDEVEIAPMFW SERVICES 253-835-2607• FAX 253-835-2609 wwwxi i volWeralwau. com PERMIT SF F APPLICATION CO ME PL DE EN FP RECEIVED 7Dt a$ AUG;30 2011 SITE ADDRESS Zl ( Sy CDS PROJEACT VALUATION ZONING ASSESSOR'S TAX/PARCEL # 5— -5: —C—)© �/ - 1.L � Z- 9 ` TYPE OF PERMIT ❑ BUHMING ❑ PLUNMING ❑ MECHANICAL EMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT ffenant Name/Homeowner Last Name] £f��,. ii.. V !``�,���/1 ` JT�7✓ s PROJECT DESCRIPTION uwm Detailed description of Mork to VPERACg., be included on this permit only NAME PRDPXT PHO PROPERTY OWNER MAHING ADDR M E -MAD, CITYVIAM NAW mown MAILING ADDRESS - E-MAIL CONTRACTOR C D ST TE ZIP FAX WA STATE CONTRACTOR'S LICENSE # S ESPIRATION DATE FEDERAL WAY BUSINESS LICENSE # NAME c.0 PHONE t3 MARANG ADDRESS 57 - E "A" APPLICANT 6:E 9tw CITY ST TE ZII' FAX PROJECT CONTACT NAME PHONE (The individual to receive and MAIIINGADDRESS E-MAIL respond to all correspondence concerning this application) CITY STATE ZIP FAX ALTERNATE CONTACT NAME: PHONE E,MAB. PROJECT FINANCING NAME 0 OWNER -FINANCED Required value of $5,000 or more (RCW 19.27.095) MAELING ADDRESS, CITY, STATE, ZIP PHONE I certify under penalty of perjury that I am the property owner or authorised agent of the property owner. I certVy that to the best of my knowledge, the Wormation submitted in support of this permit application is true and correct. I cert(jy that I will comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, andJiled against the city, but only where suc laim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the ir4formation suppli o the city as a part of this application. SIGNATURE: DATE 0" 1 PRINT N Bulletin #100 - January 1, 2011 Page 1 of 3 k:\Handouts\Permit Application