Loading...
10-104195City of Federal Way Electrical Community Development Services Permit #. 10-1 04195 -00 -EL P.O. Box 9718 Federal Way, WA 98063-9718 Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (253) 835-3050 Project Name: DASH POINT STATE PARK Project Address: 5700 SW DASH POINT RD Parcel Number: 102103 9002 Project Description: Repair Meter base and weather head Owner Applicant Contractor WASHINGTON STATE PARKS HAL HEATHER WASHINGTON STATE PARKS PO BOX 42650 WASHINGTON STATE PARKS OLYMPIA WA 98504 5700 SW DASH POINT RD 5700 SW DASH POINT RD FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 Is Use Educational or Institutional?.......................NO Service greater than 999 Amps? ............................. No FINALF-D 10//e/jo FILE 4 THIS CARD IS TO 'MAIN ON-SITE �,TyoF Construction In ction Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 10 -104195 -00 -EL Address: 5700 SW DASH POINT RD Owner: WASHINGTON STATE PARKS FEDERAL WAY, WA 98023-2045 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Final - Electrical (4055) By nApproved j3k,, Date /Q •!Z ,l0 FILE UFER Ground (4295) Ditch cover (4030) Power (4275) Slab/Concrete Floor (4255) Approved By Approved Approved to place concrete By Date By Date By Date Final - Electrical (4055) By nApproved j3k,, Date /Q •!Z ,l0 FILE Pool Bonding (4195)Temporary Power (4275) Service (4235) By Approved By Approved By Approved By Date By Date By Date E] Feeders/Sub-panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) By nApproved j3k,, Date /Q •!Z ,l0 FILE Rough Electrical Approved Final Electrical Apprm ed Right of Way Approved By Date By Date By Date