11-102344WR
City of Federal Way
Community Development Services
P.O. Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
� FILE
0 Mechanical
Permit #: 11 -102344 -00 -ME
Inspection Request Line: (253) 835-3050
Project Name: FLYNN a,q t $k
Project Address: 622 SW 294TH ST Parcel Number: 119600 1895
Project Description: REPLACE GAS 50 GALLON HOT WATER HEATER
caner
Anmlicant
Contractor
GREGORY L FLYNN
WESCO NORTHWEST PERMIT
WASHINGTON ENERGY SERVICES CO
622 SW 294TH ST
NORTHWEST PERMIT/ WESCO
(GENERAL)
FEDERAL WAY WA 98023-3541
1345 W GULF RD
WASHIES971OB (9/2/11)
POINT ROBERTS WA 98281
2800 THORNDYKE AVE W
SEATTLE WA 98199
Mechanical Valuation............................................950.00 Is this an Online or O.T.C. application? ................. Yes
Hot Water Tanks ............................ 1
PERMIT EXPIRES Sunday, December 11, 2011
Permit Issued on Tuesday,June'` 14, 20'11
1 hereby certify that the above information is correct and that the construction on,the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: OW/ Date:
RN A b A P—%& 61?,9111
THIS CARD IS TMAIN ON-SITE
CWV Construction I ection Record
Federal Way INSPECTION REQ TS: (253) 835-3050
PERMIT #: 11 -102344 -00 -ME Address: 622 SW 294TH ST
Project: GREGORY L FLYNN FEDERAL WAY, WA 98023-3541
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
E] Mechanical Rough -in (4165)El
Gas Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By 10c, Date G/_ e
FILE
El
Rough Electrical
Approved
E]
Final Electrical
Approved
Right of Way a�
Approved
By
Date
By
Date
By
Date