Loading...
11-104871City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 LFII_ Megbanical fer>ft #: 11 -104871 -00 -ME Inspection Request Line: (253) 835-3050 Project Name: GESINGER 2 p'74, Project Address: 501 SW 295TH PL Parcel Number: 119600 4062 Project Description: GAS TO GAS WATER HEATER REPLACEMENT wner Applicant Contractor RICHARD E GESINGER WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO CHERIE A GESINGER NORTHWEST PERMIT/ WESCO (GENERAL) 501 SW 295TH PL 1345 W GULF RD WASHIES97IOB (9/2/13) FEDERAL WAY WA 98023-3531 POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 Mechanical Valuation............................................2150.50 Is this an Online or O.T.C. application? ................. Yes Hot Water Tanks ............................ 1 PERMIT EXPIRES Wednesday, June 6, 2012 Permit Issued on Friday, December 9, 2011 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and theCi of Federal. Way. Owner or agent: (I I Date: 511b 12 CITY OF Federal Way PERMIT #: Project: • 11 -104871 -00 -ME RICHARD E GESINGER THIS CARD IS TO MAIN ON-SITE Construction I ection Record INSPECTION REQUE TS: (253) 835-3050 Address: 501 SW 295TH PL FEDERAL WAY, WA 98023-3511. Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. v � N ❑ Mechanical Rough -in (4165)Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) Approved By Approved to release test Approved By Date By Date By Dates v � N ❑ Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date