Loading...
14-1020059 0 Mechanical E vCommunty&N. SerAces Permit #: 14 -102005 -00 -ME 33325 8th Ave S Federal way, WA 98003 Inspection Request Line: 2 Ph: (253) 835-2607 Fax: (253) 835-2609ELE p eQ (53) 835-3050 Project Name: LIGHTNER Project Address: 706 SW 296TH ST Parcel Number: 119600 4385 Project Description: Replace air handler and install heat pump Owner Ap lin cant Contractor GENE LIGHTNER JAIMIE HOW BRENNAN HEATING & A/C LLC JANET LIGHTNER BRENNAN HEATING & A/C (GENERAL) 706 SW 296TH ST 4601 S 134TH PL BRENNHA971R9 (12/29/15) FEDERAL WAY WA 98023-3549 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Air Handling Units ......................... 1 Compressors / Heat Pumps............ 1 PERMIT EXPIRES Saturday, November 1, 2014 Permit Issued on Monday, May 5, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ^ILI I 11L11T Date: FINALED . of V& Federal Way PERMIT #: 14 -102005 -00 -ME 1WS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQ TS: (253) 835-3050 Address: 706 SW 296TH ST Project: GENE LIGHTNER FEDERAL WAY, WA 98023-3549 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)as Piping (4125) 0 Final - Mechanical (4 5) Approved Approved to release test Approved By Date By Date By VV5j Date 1�fl Ic- I i't Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date