Loading...
12-105239City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 � FILE Project Name: LEE Project Address: 253 SW 297TH ST Project Description: Replace gas furnace, like for like r R Mechanical Permit #: 12 -105239 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 7205310030 Owner A1212licant Contractor BAI CHEE LEE JAIMIE HOW BRENNAN HEATING & A/C LLC 253 S 297TH ST BRENNAN HEATING & A/C (GENERAL) FEDERAL WAY WA 98023-3551 4601 S 134TH PL BRENNHA971R9 (12/29/13) SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Valuation............................................1599 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Furnaces ......................................... 1 PERMIT EXPIRES Wednesday, May 15, 2013 Permit Issued on Friday, November 16, 2012 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington nthe Ci of Fed ral Way. Owner or agent:0?Ji Date: FINAUCb It 141 /1 & crrr OF 4A�� Federal Way THIS CARD IS TO' ON-SITE Construction In ction Record INSPECTION RE QUE TS: (253) 835-3050 PERMIT #: 12 -105239 -00 -ME Address: 253 SW 297TH ST Project: BAI CHEE LEE FEDERAL WAY, WA 98023-3551 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) 0 Gas Piping (4125)Final Final Electrical Approved - Mechanical (4065) 1:1Approved Approved By Approved to release test Approved By Date By Date By Date 11-21-1Z' Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way -� By Date By Date By Date