Loading...
14-1006344 City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BACH FILE Project Address: 619 SW 297TH ST Project Description: Generator gas line 9 Mechadical Permit #: 14 -100634 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 720520 0050 Owner ARRlican Contractor ALAN BACH ERIC JOHNSON WASHINGTON ELECTRIC LLC (GENERAL) 619 S 297TH ST WASHINGTON ELECTRIC LLC WASHIEL879BW (1/16/15) FEDERAL WAY WA 98003 12501 SE 299TH PL 12501 SE 299TH PL AUBURN WA 98092 AUBURN WA 98092 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Gas Pipe Outlets ............................. 1 CONDITIONS: A permanently installed generator is not allowed to be placed within required yards (setbacks). See Bulletin #150 for placement details. PERMIT EXPIRES Saturday, August 9, 2014 Permit Issued on Monday, February 10, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: %ill LAIN VM FINALED �..:� Cl" OF Federal Way PERMIT #: 14 -100634 -00 -ME TINIS CkRD IS TOMAIN ON-SITE ' Construction InOection Record INSPECTION REQUESTS: (253) 835-3050 Address: 619 SW 297TH ST Project: ALAN BACH FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) Gas Piping (4125)13 Final - Mechanical (4065) Approved Approved to release test Approved By Date By Vi6 Date 2. It ec Date S _Y? � 1 ❑ Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date