14-1006344
City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: BACH
FILE
Project Address: 619 SW 297TH ST
Project Description: Generator gas line
9 Mechadical
Permit #: 14 -100634 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number: 720520 0050
Owner
ARRlican
Contractor
ALAN BACH
ERIC JOHNSON
WASHINGTON ELECTRIC LLC (GENERAL)
619 S 297TH ST
WASHINGTON ELECTRIC LLC
WASHIEL879BW (1/16/15)
FEDERAL WAY WA 98003
12501 SE 299TH PL
12501 SE 299TH PL
AUBURN WA 98092
AUBURN WA 98092
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Gas Pipe Outlets ............................. 1
CONDITIONS:
A permanently installed generator is not allowed to be placed within required yards (setbacks). See Bulletin
#150 for placement details.
PERMIT EXPIRES Saturday, August 9, 2014
Permit Issued on Monday, February 10, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
%ill LAIN VM
FINALED
�..:�
Cl" OF
Federal Way
PERMIT #:
14 -100634 -00 -ME
TINIS CkRD IS TOMAIN ON-SITE '
Construction InOection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 619 SW 297TH ST
Project: ALAN BACH FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)
Gas Piping (4125)13
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Vi6 Date 2. It
ec Date S _Y? � 1
❑
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date