Loading...
15-100005City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: SHIRER Project Address: 32412 51ST AVE SW Project Description: Gas fireplace insert with piping 11 .1 MechAnical Perm#: 15 -100005 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 1898310010 Owner Annlicant Contractor DOUGLAS SHIRER NORTHWEST PERMIT/ WESCO WASHINGTON ENERGY SERVICES CO JONI SHIRER 1345 W GULF RD (GENERAL) 32412 51 STAVE SW POINT ROBERTS WA 98281 WASFUES971 OB (9/2/15) FEDERAL WAY WA 98023-1936 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Fireplace Inserts ............................. 1 Gas Piping ...................................... 1 PERMIT EXPIRES Wednesday, July 1, 2015 Permit Issued on Friday, January 2, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: CMDate: FlumALED THIS CARD IS TO MAIN ON-SITE CITY OF Construction I ection Record Federal Way INSPECTION REQ TS: (253) 835-3050 PERMIT #: 15 -100005 -00 -ME Address: 32412 51 ST AVE SW Project: DOUGLAS SHIRER FEDERAL WAY, WA 98023-1936 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) as Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date Dates ­' By Date 5—, 5--/ I MA FAF Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date