09-101676Deolition
Permit #: 09 -101676 -00 -DE
Inspection Request Line: (253) 835-3050
Project Name: BESSLER
Project Address: 2854 SW 300TH PL Parcel Number: 416660 0170
Project Description: Demolition of (1) single family residence and (1) detached garage
City of Federal Way
Awlicant
Contractor
ROBERT BESSLER
Community Development Services
BRIDGE BUILT HOMES
2854 SW 300TH PL
PO BOX
P.O. Box 9718
980
Federal Way, WA 98063-9718
FEDERAL WAY WA 98023
1 L It":0
Ph: (253) 835-2607 Fax: (253) 835-2609
Deolition
Permit #: 09 -101676 -00 -DE
Inspection Request Line: (253) 835-3050
Project Name: BESSLER
Project Address: 2854 SW 300TH PL Parcel Number: 416660 0170
Project Description: Demolition of (1) single family residence and (1) detached garage
CONDITI aS:
After final inspection is complete a d dQoved, pleascontact K.L. Cimmer by e-mail at
Karic@cityoffederalway.com b fax at 253-83 609 to receive a refund of cash bond.
PERM' XPIRES Friday, May 6, 2011
Perm' ssued on Wednesday, May , 2009
1 hereby certi th t above infor tion is correct and that the construction on the above described property and
the occupanc d the use will in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: 2 - ( — Dater C�`r
Owne
Awlicant
Contractor
ROBERT BESSLER
BRIDGE BUILT HOMES
BRIDGE BUILT HOMES
2854 SW 300TH PL
PO BOX
BRIDGBH259QC (9/13/10)
FEDERAL WAY WA 98023
TACOMA 8499
PO BOX 99218
TACOMA WA 98499
CONDITI aS:
After final inspection is complete a d dQoved, pleascontact K.L. Cimmer by e-mail at
Karic@cityoffederalway.com b fax at 253-83 609 to receive a refund of cash bond.
PERM' XPIRES Friday, May 6, 2011
Perm' ssued on Wednesday, May , 2009
1 hereby certi th t above infor tion is correct and that the construction on the above described property and
the occupanc d the use will in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: 2 - ( — Dater C�`r
THIS CARD IS TO EMAIN ON-SITE r
MY of Construction I ection Record
Federal Way INSPECTION REQU TS: (253) 835-3050
PERMIT #: 09 -101676 -00 -DE Address: 2854 SW 300TH PL
Project: ROBERT & MICHELE BESSLER FEDERAL WAY, WA 98023-2325
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Final - Building (4050)
Approved
li_By ' /� Date 42�
Rough Electrical
Approved
1:1Approved
Final Electrical
1:1Approved
Right of Ways
By
Date
By
Date
By
Date
THIS CARD IS TO MAIN ON-SITE
CTY OF fommunifyDevelo m t Ins ection Record
p P
Federal Way IVR INSPECTION REQUEST PHONE # (253) 835-3050
PERMIT #: 09 -101676 -00 -DE
Owner: ROBERT BESSLER
Address: 2854 SW 300TH PL
FEDERAL WAY, WA 98023-2325
This card is part of your required inspection documents. Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD,
Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not
be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections
are logged on the back of this card.
Final - Building (4050)
Approved
By Date
For inspector reference only
0 Rough Electrical ❑ FINAL - Electrical
Approved Approved
By Date By Date
Omar ECEIVES
Federal Way
PERMIT -Of- LOLL-Z-(�o
�,�JSF MF CO ME EL PL DE EN FP
253$
;wAY MAY 0 6 2�P CATION
352607- PAX 253-835.2609
�My CF FEDERAL W
"O following to rerdred inf on - an incomplete application wiii not be a ccepts& Please Print kwjibbj (bt ink) or %Fe.
SITE ADDRESS _ZR!5"4 W �sP1'� �i. Ft4j
ASSESSOR'S TA8/PARCEL 1i
e_.
LEGAL DESCRIPTION (e g. Acme Estates, Lot 1)
TYPE OF PERMIT
0 BUILDING ❑ PLUAKMNG a MECHANICAL
¢1-DZKOLZTt0N a ELECTRICAL
PRDJECT DESCRIPTION (Provide dstaue4 dmxrv*on of work mduded on
.. � Mrs �. i-: L r TMJ•, �� .,1..�. l'.�. 1�
PROJECT NAM (Name ofd or Owner Last
PROPERTY
OWNER
CONTRACTOR
PROJECT
CONTACT
LENDER
Vt 11 [C-2 i
Sur=/um it
LOT SIZE (st)
NAME `
2
PRIMARY PHONE
ERT- Ar . v @It ` Ei
( z5a) 9 2 -"
MAEUNG ADDRESS CITY. STATE, ZIP
E -MALL ADDRESS
/'T�iE( e �"`.6A'Ld*` . 1 Gs"'. • F't+ :� R�r F:`�`li T 9
CELL PHONE
COMPANY NAME APPLICANT NAME
OFFICE PHONE
':2,LtIa HCiAeS %rO ' Q R.LS C
3
-O� 2
MAILING ADDRESS CITY. STATE, ZIP
CELL PHONE
O • 9921t.FkKSw�l�6
25 4
CRY OF FEDERAL WAY BUSINESS LICENSE NUMBER EX IPRATION DATE
FAX NUMBER
C3 Architect o Tenant a Agent 0-0ther
(Z -es-) 98.4
- vi
COlInRACMiCBRT TRATIONNUMMM XZIWATWKDATE
_�bCAI lut'P�MES�
�-
COMPANY NAME APPLICANT NAME
OFFICE PHONE
':2,LtIa HCiAeS %rO ' Q R.LS C
3
-O� 2
MAELMO ADOR833 CRY. STATE, ZIP
CELL PHONE
2s'!, 91
- 09 Z3
RELATIONSHIP TO PROJECT
FAX NUMB=
C3 Architect o Tenant a Agent 0-0ther
(Z -es-) 98.4
- vi
NAME PRIMARY PHONE E-MAIL ADDRESS
NAME
Per RCW 19.27.095. -
Lender b#Jbrnucdon is regmfred if project malas exceeds "000
MAILING ADDRESS
CITY. STATE, ZIP
PHONE
EXISTING ASSESSED/APPRAISED VALUE $. VALUE OF PROPOSED WORE _ (C., I
SPRIIYI{LERED BUILDING? a YES "0 FIRE SUPPRESSION SYSTEM PROPOSED/REQUIRED? a YES ki NO
WATER SERVICE PROVIDER o LAREHAVEN a HIGHLINE KTACOMA a PRIVATE (WELL)
SEWER SERVICE PROVIDER -, LAMWAVEN 0 HIGHLUM 0 PRIVATE (SEPTIC)
r
------....�... ••••••
JSAIwrutG PROPOSED TOTAL
EMENT
!�-
. FT. . FT. SQ. FT.
FIRST
1 7
SECOND
Zo`�
TIMID
PLATTED LOT?
ADDITIONAL FLOG &SCRIBE)
DEMO PERMIT REQUIRED?
DECK (COVERED OR ❑ COVERED?)
a NO
GARAGE g_CARPORT ❑
(�
NUMBER OF FLOORS
mrw20MAr �c„a o.®a. ,�„
"NEWHOMES ONLY'" NUMBER OF BEDROO
ESTIMATED G PRICE $
Indicate number of each type of fixture to be butalied or rielocat art of this project. Db not otdrtde
existing fixtures to re3mave.
Value of Msduueical work $ 22. Lr— �' — (A SOF OR ESTIMATE BE INCLUDED r'
=F
Z AIR HANDLING UNITS EVAPO THE COOLERS —� OUTLETS WooDSTovEs
--'�_ BBQs F Ges W HEATERS MISC (Describe)
BOILERS INSERTS HOODS
COMPRESSORS FURNACES ( RANGES
DUCTS OAS LOO SETS REMO. SYSTEMS
BATHTUBSr Iaet4e/smwr _ LAVS (abs." URINALS
DISHWASHERS RAINWATER SYST VACUUM BREAKERS
DRINKING FOUNTAJA _a SHOWB&Sfis- 9M . WATER CLOSETS (r ,*
B`LECTRM WA HEATERS _� Sjllm _�_ WASHING MACHINES
HOSE BIBBV SUMPS
I — tM under Purtut+J °JPerJWV that t am the property owner or authorised ageeet of the City a(%4t lg% the O&Wul R nsfGOrd in g to t t Rf fitww** P t appthelication is tnu and oorree �c� }� p�°�--p wWe all
that the � of
die
does not remove the owner' ewpons fora npliaece �s0ate, or i nft I d that the isgumme of this permit
-rfardw agree to hold harmless the e' 9 or enedronneental laws.
i+enesttgation and Glome of such ° � of sa y be Way as td any claim (inetudtng costa, exPensss, and atlornege fees incurred in the
when such claim arises out o the o thewhich me made by � Pte, treeiudbW the 9n@4 and filed against the cit% but aaetg
the CRY as apart of this applicat e, f °� �Q g � °ffl� � °mP�J�, upon the of the bVb—ation supplied to
SIGNATURE:
wow and/or Authorized
r I c
a NEW a ADDITION
a ALTERATION
a REPAIR a TENS QUIROVENENT
BIITLDING SHELL ONLY?
ZONING DESIGNATION
NEW ADDRESS REQUIRED?
a YES a NO
a YES o NO
BASIC PLAN?
CHANGE OF IIS&?
IIP/SEPA/SU?
a YES
a YES
o YES
a NO
a NO
a NO
PLATTED LOT?
a YES a NO
DEMO PERMIT REQUIRED?
a YES
a NO
Bulletin #100 — January 1, 2009 Page 2 of 4 WandoutsTemdt Aunlication
CITY OF f
4OW4 sr4w��
Federtd Way
n= , WAY
CITY Ur rF-- Al_
CL#S
*4 '
RECEIVED
MAY 0 6 2009
DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
33325 8h Avenue South
PO Box 9718
Federal Way WA 98063-9718
253-835-2607; Fax 253-835-2609
www.cityoffederalway.co
DEMOLITION PERMIT REQUIREMENTS
A demolition permit is required to remove any structure or structures on a subject property. Check with the City's Planning
Division to see if the proposal exceeds thresholds that trigger an environmental review. An environmental review and
submittal of an environmental checklist may be required, which will extend the time period before a demolition permit can
;sueds.
Prior to submitting a demolition permit, the following items (as applicable) must be signed by the respective
agency (see attached Demolition Permit Contact List).
NorE roAPPL[cAN7'. Utilities shall be disconnected and services performed, if applicable, prior to issuance of the demolition permit. All applicable
items below are to be simed and dated by the respective agency representatives.
1. ASBESTOS AVATEMENT
(Copy of approval fcrm and asbestos survey from Puget Sound Clean Air
Agency provided)
/t1nhJP"e-&& ehed
(C ty of Federal Way Building Offidal)
2. GAS SUPPLY
(Gas to be shut off, meter removed and final bili paid)
A/YA
(Puget Sound Energy)
3. SEPTIC SYST:?M
(Tank to be removed or tank to be drained and filled)
Lk &r Atte. .11710/
(King County Environmental Services)
4. SANITARY SEWER (Check applicable box)
o Sewer line capped at property line
o Existing sewer line to remain and be used by proposed new structure
(Lakehaven Utility District)
S.GARBAGE
(All household garbage disposed off and final bill paid)
VI (Waste Management/Other Company)
❑ Completed Construction Permit Application form
❑ Provide the following fees:
1. Demolition Permit Fee
2. Automation Fee
3. WA State Surcharge
4. Cash Bond Deposit
& ELECTRICITY
(Electricity to be strut off and meter removed)
(Puget Sound Energy)
7. FUEL STORAGE TANKS
(Above or below grade fuel tanks, have been pumped or removed
under Fire Department permit prior to any dismantle/excavation)
.gIG✓l6ttls�i2' �f%scGhc�%
(South King Fire and Rescue)
S. WATER - Public Source (Check applicable box)
o Meter to be removed and final utility bill paid
Meter to remain and be protected
Si�it�lafGc®7 i;'ffitC��
(Water Supplier)
*****s OR ******
9. WATER - Private Well (Check applicable box)
o Private well filled and capped
o Private well to be used for other purposes
(King County Environmental Services)
Based on valuation. See table on pg 4 of the construction permit application.
$6.00
$4.50
120% of calculated building permit fee
Refundable upon Completed Final Inspection
Bulletin #122 - Januar � 1, 2009 Page I of l k.\Handouts\Demolition Permit Requirements
APR -23-2009 1:3:43 From: %.
- APR -23-2e O9 13:03 From:ELECIO FIRST REP 2533956806
APR -23-2M 11:04 Fran:
NY 23 09 I&Ws ' Blid0e81dWw"
To: 3 984 6675
To2534766421
To:M339
2664 s W vwT I es�5
til_ . � l�r�, •�
P.212
P.2,2
F.3,3
Q.2
t�I11RAl�lr a. oorriMrrr neva filno�
33355 a Av mw Sale
C" OF IPAI� tvoHaa"s
Fadeetd Way WA �MM4YJ1
FederC�l 233$15 1601.0a 53.133.w
A!3 +
DEMOUTION PERMIT REQUIREAAENTS
A dnmcrlc a pc uh b m Win d b INW a am aaarslss or wi, mmanas4pqpw Check witbbe Civ PI mMW
Div do n rn we i'to pkapmt e:eaedt tlaeall "ed b W a ea>'ieoaao Id wdew. An cavkaumW tovie:w and
wb dW *11a c WANW=ril ehaokiisk MOW t www d, Which v4 a2md tip tinea p=W ba bn a denoi bm pwok cap
be rued.
O Polar is aablsW4 a dwxWNoa paesp% Ire 1lik bW§g Us (of tippipp MO ==t be skew i by the raapaedve
aim! (In disdod Deaeatrtn?tieaeEt (bated U4
%MOlR7aA111lrARM,t;W/tierAWJWAllWMCant0d=r*uP6raa(fOPRmd P*V&kNwWv0/"Aw*&[hepow&A24V& &
laasb�dlrr.,e io1 � %J'varrlrarAre 4u1 e
s. �safznos a
(COPY alb alTil ant �Mef tiaml R� �1a1d t]epa �f r
4 - Q - o'
2. am OWLY
(Ola to oe !.t d� mmr im aa0 sw tlmll b3 pp*
3.9sT>OC by'bM
Vft bet Mwalarty tote Saud ani n"
4. sA1+Q wv 11 im (04* aNBC" bad
oSeww**G"K at propfgvn
eb1da+QeeWN tble wnauu=Wiwilpowr*udkn
S GAMINE
-'_--mift nim s. vNi
13 CwM*@hde.wkwtipR by Applealisa lana
O Tta+iia the taffewi ft Leu:
L Dftw tion raraalt Vw
Z Aatoao ds& tee
3. WA $fats Band wp
S Ccleh Bald DW"
7. FMSTORM TAM
{Above w talar arodS IW W t; herb been pun W w m mw W
under "M osperbrprtlplrrrh p ft tlo aw ditle--01 kae on
and
IL =TIM • Pli flo tialnft (*reek appliable box)
PAW a u r7![10rabard b w UWAN iwd
S;p�i
MNA ORfw«0
9 VM=-MINNUM(CkedcaWkab:eMx)
e3 Mwe PIN tJtat and aspen
Iz J4fueee r!1 b Iw red 1vd111rpwPsps
oi�edM�wiw� tiCplbJow q 4eFCK COpS�diOi pCrnaZap/lialtfon
3M
64.50
I�03i•[oiloltald �i perait the
tdua8ebilrOan Ciwpluldlfed LgrRiop
Ddodn Alit -Jwntr r r, 29D?hr 1 N 1 kUbsftwMwwwM phWannL aewh�riiili
May. 5. 20091 1:19We*.j-Langseth Environmental Servicesy-IHLu No. 3422 r- P. 1 oiioi
Apr 30 09 01:09p Bri*6vl1lHo* 253 75 A -Z
RetnaTRENroiCOMMVMs11 DSVCWPgi:Nr$I It"Ces
33325 80'Avf;rlt;.- South
PD -9 :e 97)8
CITY OF 4V lWoml Way WA P0.3-9718
• �'ed�ir� I W� 257-835-160'1; Fix253-8. 4-1409Y flad
www.owrldlt •sy.eom
DEMOLITION PERMIT REQUIREMENTS
A demotic on ptmit is required to remove any mctuit or struMms•on it subject proporV, Check wish 016 City's F lamming
Divisico to I see i rthe proposal exceeds thresholds trot trigger OR envilwmcftl review. An environttle:llW review a Id
submitt4l of an tenviirottmental ehe&3161 MAY t�P required, which v+fli extend 4hb time period before s demolition per nitcan
be issued.
(3 Prlor b sub;nittiag a demo]ldom Permits the [olltrwing items (as appfAcable) must be olpfad by tho rolpeWve
sigene]- (see attached Detaolition Perimt Coatitct Iasi).
NO>',R7r'Atl i►GfNI'= (AdItlea shall bt di mileleted and ae►vleot pe#brmed, %ppli0ft priori* i rsuamcd Of demgrt+o>t penrr►l, AO asplivable
Items MOW= to Ile s PANdppQda/ by the nesparm apacyrepreienladws.
1. ASOEMOS AblI 1'EMENT
(copy of app Koval fzrm and a1b88t0e! anvey from holier Sound Clean Air
Age W WVA fed)
--MTV ifM Way u ng t
2. GAS SUPPLY
(teat b be shut off', rttecer removed and final bel paid)
(Ager Sound Energy)
.3. SEPTYC 9ft-WIM
(Yank to be i emoverl ar tank to be drained and 11118*)
�fdny tw Iame r8t
4, SANITANY SEWER (Check appiicable box)
0 Sewer Brie tappet( at property line
o Ddsong se mer. Iing to remain and be used by propoae0 nein tnntctwe
(isioehauen nutty 095tr M
S. GAR"615
(Ail nousehol i gttba)e dispostd oft and final bill tmld)
(:vPtste fNana6eMRn'J�erAet1y)
Q Comph#ed Coh9trre0l012 Permit Application.forat
61 ELECTRLCrTV
(HeMidty ltf be shut orf and mmger removed)
SetW Eneltm .
y. FU9L STORAf3E TANKS
(Above or below de ' ccam�,, have beers Dui of 1r'move0
undujkeftd 'prlorb1) smanWexm%*Jon)
td11 tong ire and flesate)
O. WATER - Public Source (Cheat applicable bot)
o Mater•tb be .mrrlOred and Anal 010 bill paid
Peter rezvoln 6of �"'�Q
ter )
9. WAT611 - P►ijee Weil (Check applicable bon)
o ft►lvol vid (,tied 5nd upped
* plivate wail to belused for other purpasal
Fit* caw* tulWannleatal sv*rs)
O Providt the following feein 11- Demolition Permit Fee BwW on valuation; gee tableoit pg 4 of theconclructfon permit -pplicatlon-
2. AN tomstion .pee $6.00
3. WA 'State Surcharge 34,51)
4. Cash goad Deponit I Z09t ofcelculawO btilldfas permit the
AoNndoble apan delnpieted Fina) tA"Mion
9ullctin0122 •IMMIg1.2009 palclprl k�Haad0�bti0amdn�OaPartAl•Iilif9ftrit
r agc i vi i
Chris Brid e
From:
"Criscuolo, Liana" <Liana.Criscuolo@kingcounty.gov>
To:
<bridgebuilthomes@gwestoffice.net>
Sent:
Wednesday, April 22, 2009 3:21 PM
Subject:
Asbuilt records for 2854 SW 300th Place
To whom it may concern;
There are r o records of a septic system asbuilt for the above-mentioned parcel. When the septic tank i 3 found it
can be properly abandoned one of two ways; 1) pump, fill with compacted soils and crush lid or pump and
remove tank. A licensed pumper then will complete a tank abandonment form and send to the Health
Departmen :.
Thank you,
Liana Criscuolo, RS
206-296-9742
L /22/2009
Approved' Transaction• Page 1 of 1
pscIear air.org
Puget Sound r! <<an i.,r Agency
Single -Family Notification Case #: 200900781
This page mu! t be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for
inspection at i II times at the asbestos project or demolition site (Reg III, 4.03(a)(6)).
Fee Amount Faid $75.00
Credit Card T-ansaction # VX3F3DCAOC3B
Transaction Cate
04/28/09
Owner's Nam a
Rob & Michele Bessler Phone (253) 576-6006
Site Address
2854 SW 300th PL
Site City
Federal Way Zip 98023
Contact Persc n
Chris Bridge Phone (253) 691-0323
Mailing Address
6203 Hawthorne Terrace
Tacoma, WA 98422
This project includes asbestos removal.
Project Size linear feet / 380 square feet
Project Start Date 04/28/09 Completion Date 04/28/09
Asbestos will be removed by a licensed asbestos abatement contractor
This project includes a demolition.
Demolition Start Date 05/15/09 Completion Date 05/18/09
Demolition w II be completed by a demolition contractor
I certify that:
(1) This is a single-family residence project. The structure is used by one family who owns the property as their domicile.
(2) The infom ation I have provided is to the best of my knowledge accurate and complete.
(3) I understand the fee for this Notification is nonrefundable.
Create Anot ier Notification
If you have qt estions, contact us at asbestos@pscleanair.org or 206.689.4058.
https:Hseci tre.pscleanair.oriz/Asbestos/Approved.aspx 4/28/2009
04/30/2009 15:54 253-502694
Apr 30 09 01;05p BridgeBuiltl o
,�
CITY OF
Federal Way
WATER CITY -TACO PAGE 01/01
253675 p•z
DIEPAR7KENTOF CommvNrry UEvELor.Mr.NT Smvwn
33325 8` Avenue South
PO Box 9718
Fedaral Way WA 98063-9718
2S3-835-2601; Fax 253-M-2609
www. SW ITedernlv►ry Com
DEMOLITION PERMIT REQUIREMENTS
A demolition pe rmit is required to remove any sm aure or structuress on a subject property. Check with tate City's Planning
Division to we if the proposal exceeds %gesholds that trigger an environmental review. An environmental review and
submittal of an environmental checklist may be required, which will extend tht time period before a demolition permit can
be issued.
LJ Prior to sub;:nittiatg a demolition permit, the roamdug items (as applicable) must be signed by the respective
agency (see attached Demolition Permit Contact List).
No7e ro.tl'PLt:ANI'_ (hfliaes shall be disconnecred and services performed, if applicable, prior.ro issuanm of the dem of lioa JnnaiL All applicable
irems below are ro ue s:rdattd by the respeatnre oga'rtcy rep—datives.
1. ASBESTUS AEIATEMENT
(Copy of approval foal and asbestos survey Rom Rrget Sound Clean Air
AgeM amvided)
(C'ty or Federal Way Building offlcal)
2. GAS SUPPLY
(Gas to be shut OR, meter removed and final bid paid)
(Puget Sound Ere W
31. SEPTIC: SYSTCEM
(rank to be remom i or tank to be drained and tilled)
(King County Environmenlial SenAoes)
4, SANIMY SEATER (Check applicable box)
0 Sewer Erie upped at property line
a Bdsdnq sewer line to rem lln and be used by proposed neve structure
(Lakenaven Utility District)
5. GA-lit"GE
(All homhdd garbage disposed off and flnel bill paid)
(W,,ste Nwagemerg0therCoTq")
❑ Completed Construction Permit Application form
6. ELEGTRIt3TY
(eectricity lC be shut off 2nd meter removed)
(Puget Sound energyJ -
7. FUEL STORAGE TANKS
(Above or below grade ftA tank,, have been pumped or Mrrloved
under Fie Department permit prior to any dismantle/excavation)
(South Kmg Are and Rome)
& WATER - Public Source (Check applicable box)
a Meter to be removed and Finai utility bill paid/ /1
A�eter r remain �A 4 Zn _W1`7
—ilo: OR ******
9. WATER - Private Weil (Check applicable box)
a Private wel filed land upped
o Priwa. well to be fused for other purposes
pang county r:nv(rarvrte bl SMALTS)
Q Provide the followiag fees: 1. Demolition Permit Fee Based on vniustiom See table on pg 4 of the construction permit appl icstion.
2. Astotnstion Fee $6.00
3. WA State Surcharge 54-50
4. Cash Bond Deposit 120%efcalculaw building permit lac
Refundable upon dampleted Final Inspection
Bullctin 0122 –January 1. 2009 Ploc 1 or 1 k%andautsZemulition PcirritAaquirements
DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
33325 8`i' Avenue South
PO Box 9718
CITY OF Federal Way WA 98063-9718
Federal Way 253-835-2607; Fax 253-835-2609
www.citvoffederalway.com
ffederalway.com
DEMOLITION PERMIT REQUIREMENTS
A demolition permit is required to remove any structure or structures on a subject property. Check with the City's Planning
Division to see if the proposal exceeds thresholds that trigger an environmental review. An environmental review and
submittal of an environmental checklist may be required, which will extend the time period before a demolition permit can
be issued.
❑ Prior to submitting a demolition permit, the following items (as applicable) must be signed by the respective
agency (see attached Demolition Permit Contact List).
NOTE TOAPPLlCANT. Utilities shall be disconnected and services performed, if applicable, prior to issuance of the demolition permit. All applicable
items below are to be signed and dated by the respective agency representatives.
1. ASBESTOS ABATEMENT
(Copy of approval form and asbestos survey from Puget Sound Clean Air
Agency provided)
(City of Federal Way Building Official)
2. GAS SUPPLY
(Gas to be shut off, meter removed and final bill paid)
(Puget Sound Energy)
3. SEPTIC SYSTEM
(Tank to be removed or tank to be drained and filled)
Lc/f�r %�ftuelic�/
(King County Environmental Services)
4. SANITARY SEWER (Check applicable box)
❑ Sewer line capped at property line
❑ Existing sewer line to remain and be used by proposed new structure
/ o//
(Lakehaven Utility District)
S.GARBAGE
(All household garbage disposed off and final bill paid)
VIA
(Waste Management/Other Company)
0 Completed Construction Permit Application form
6. ELECTRICITY
(Electricity to be shut off and meter removed)
414tK0'! MAdheol
W (Puget Sound Energy)
7. FUEL STORAGE TANKS
(Above or below grade fuel tanks, have been pumped or removed
under Fre Department permit prior to any dismantle/excavation)
.11,6#1 ver A#^411eW
(South King Fire and Rescue)
B. WATER - Public Source (Check applicable box)
❑ Meter to be removed and final utility bill paid
Meter to remain and be protected
Si�tt�af7,rrr A>�%CtiCt�/
(Water Supplier)
****** OR ******
9. WATER - Private Well (Check applicable box)
❑ Private well filled and capped
❑ Private well to be used for other purposes
King County Environmental Services)
0 Provide the following fees: 1. Demolition Permit Fee Based on valuation. See table on pg 4 of the construction permit application.
2. Automation Fee $6.00
3. WA State Surcharge $4.50
4. Cash Bond Deposit 120% of calculated building permit fee
Refundable upon Completed Final Inspection
Bulletin #122 —January 1, 2009 Page 1 of 1 k:\I-landouts\Demolition Permit Requirements
r
4ik
DEPARTMENT OF COM**TY DEVELOPMENT SERVICES
33325 81h Avenue South
CITY OF PO Box 9718
Fe�e253
00% Wai Federal Way WA 98063-9718
✓( -835-2607; Fax 253-835-2609
www.ciiyoffederalway.com
DEMOLITION PERMIT CONTACT LIST
This list of agencies may assist you in expediting the demolition permit process. Refer to the demolition permit
requirements for signature blocks. All applicable signatures are required prior to permit approval.
1. Asbestos Removal: Puget Sound Clean Air Agency
8. Septic: King County Environmental Services
14350 SE Eastgate Way
Bellevue, WA 98007
206-2964932
9. Fire Department: South King Fire & Rescue
33325 8h Avenue South / PO Box 9718
Federal Way, WA 98063
253-946-7248
Bulletin #109 — March 1, 2007 Page 1 of I k:\Handouts\Demolidon Permit Contact List
d s
110 Union Street, Suite 500
Seattle, WA 98101-2038
206-343-8800 —OR— 800-552-3565
www.pscleanair.org
2. Electricity:
Puget Sound Energy
Tacoma Public Utilities
Attn: Construction Coordinator
Customer Service
22828 68'' Avenue South, Suite # 102
—OR— 747 Market Street
Kent, WA 98032
Tacoma, WA 98402
888-225-5773
253-383-9600 or 253-383-2471
3. Gas:
Puget Sound Energy
805 1566 Avenue NE
Bellevue, WA 98004
888-225-5773
4. Telephone:
Qwest Communications
801-962-2475 (phone) / 801-237-6491 (fax)
5. Water:
Lakehaven Utility District
Tacoma Public Utilities
Technical Service Division
Customer Service
31623 First Avenue South —OR—
747 Market Street
Federal Way, WA 98003
Tacoma, WA 98402
253-941-2288
253-383-9600 or 253-383-2471
6. Garbage:
Waste Management
655 Second NW
Auburn, WA 98071
253-833-3333 (residential) — OR — 253-939-9792 (commercial)
7. Sewer:
Lakehaven Utility District
Technical Services Division
31623 First Avenue South
Federal Way, WA 98003
253-941-2288
8. Septic: King County Environmental Services
14350 SE Eastgate Way
Bellevue, WA 98007
206-2964932
9. Fire Department: South King Fire & Rescue
33325 8h Avenue South / PO Box 9718
Federal Way, WA 98063
253-946-7248
Bulletin #109 — March 1, 2007 Page 1 of I k:\Handouts\Demolidon Permit Contact List
d s
APR -23-2009 13:43 From: To984 6675
PPR' -23-2009 13:03 From:ELECW FIRST REP 2533956806 To:TJ12534766421
APR -23-2099 11:9+1 From:
Apr 23 09 look ' Beedpe9 *bnnp
CITY OR ktho
Feft ral Way
To:c S13B56996
ze�4 sW QCOMM vt-., I^Clk
3
P.212
P.21'2
P.313
P.2
OVwwn atTtwCdKVMrrrDavarantoffgwwts
333M a• Awma scan
t0 Dan 9M t
PdenJ Way WA OADSWI1
333439-Zorsa Za-LiSa"
2g5¢ SW 30o P�
DEMOLITION PERMIT REQUIREMENTS
A dentuitiate pc astir a et�giiitted b remove arty oraornrtonr ona =*ctp Mp"w. Ckuk With be Cipfs Phuitw
Dkbim to see' 220 Pcapaol C;eaedf thrr)eohla tient MON as e+riaaaa hd xWew. M etrr'awm"tpi tevim aed
R*Wuof as c ovttUNW0l cheotiist uW ba mWin d, wWCb w{a eeand ft *w puled beta a demd&oo Dwu* cm
be is
O Ptbr to wbi Li 14 st dMWWN ptrn% tre Ik ine ag XW (tn t►pp&*b) t=t be; dV" by tba raapn:tiy�t
89=9 We �d DmdWa ?a ed as%d IJet).
eons 7DAVJCW.&w, LviH.ar ttittirbrslicov, .d a rPe jl+.,�L 9' P W&k yiwim tttatravft afifWAna rbe P~ Id yjRas6rs
"babw wr xal s AUNdSMIAO&N tli. gx'wq raP�peaa,tlYv
;L AsaP=M MnMT
(ODPW�of WIN tarn and attttglos aMH tv++PtW 9aMtd t]tta Ar ..
_ :Nar l
2• GM SL"LY
[O; m oe !.t oR nneew �t+aa etw tt►,et bi pr'4
3.Sww&y'STN
ir+* 10 be tt!ltOYtl ar test to � apr+ee.r �
e. SANSIMV !FINK (Che* an@mbk oat)
o satyr iter tappK at ptwty ice
a ehssmrg MW Ut tt►ttwm am ba No I V"Sw sot *Uwe@
LGAMM
(AP ttta dawOftpdwmoaradbaealpaid)
o CkMN*d dc.u1kvcti.R fApp lc d a tbm
D Pro ms the t orowhq hw: L Dea MWA tamp Fw
L Aalomatha toe
X WA Stats bwd arp
4- aak Hand pspasit
7. PUL t;TOMA TANO
WM or New Graft" Wft hem batt ptur*W w n, u i
under Rte 0w b=tpw* Oft to arty dbirtaiWa mow)
(tet rano mm and ftMA) '
R WAVU • PUM w m - (Chwk sppiiabie box)
Kd rta toMnmieo-aed Mi tf►ba wd
o NW b MUMa:0 be$
muff—
«nw ORO*****
4. VM= -P MeelMb/ (Calk iolub'a box)
o MAW Wd tfty w d cqM
o MAO w l b hs tatd to dAvptrp�
94wd.avaLaeiaaFee1&bkwpa4ertheamSMK teaatatrtitsWkakkn
36"
9450
jamere"a w bwwmis pb+je ru
iarimdserkw=calwvdnw impewan
thidn Ak id -]sur ► �, x709 nF 1.I1 1CC�udotlittlnralfaR t�tl �haawra
May. 5. 20091 1:19PM;c5s-L seth Environmental Servicesy—iji u No. 3422 r- P, 1 ui,r,i
`r 0 09 01:09 BrldgeaulllWo 263 9675 A Z
Apr 3 A ,
' netnaTM NIMpcommutirrYDgvcwr.NiNrbt itvlcea
31325 80'Aveen:.t South
Pb -8 :.it 9718
CITY OF O Feds"I Way WA 910-.3-9711
. Fed�r�� i Way257-835-1607; Fax253.8. •5-2609
DEMOLITION PERMIT REQUIREMENTS
A demolition pcmit is required to fe:Qteve any structutt or structures on A subject proporly, Cheek with die City's Planning
Division to see i rthe proposal exceeds thresholds that trigger an enviroomc tel mview. An attvironmenlal review V A
subm(tt,41 of an 6vimirnental obeokllsl may by requtt,ad, which will extend -thb time period befare it demolition per rtitcan
be issued.
❑ prior to subsnittleg a demoll loin permit, the follm►ing items (as oppticable) trust bo oigned by the r*$Peel:;va
agency (see sUat:hed Demolition Pertrmt Contact Liist)-
fY0y8T*.tM CAjVI: V(difflej 1rholl be dimit,1e910d Ped twvleot per/brmed, r1wlicoble, prior!* issuance of thedemolwan permit All oapftabte
items befowam la lie the ntspIm6w apricyreprerentarrvas.
1. ASt1E'! MS AbWMMEN'T
(copy of appmui ttrm and albeatoe sunny him Puget Sound Clean Air
Wtv VFFOR My U1141nif 00511
2. GAS SUPPLY
(Gar: b be shut off, rtieW famoved and final bill (►ilii)
(Arget Sound nergy)
3. SGMC t)Y5TLIM
(Tank to be minaml or conk to be drained and Mail)
1g au tonne tali
4, SANITARY SEWER (Check applicable box)
0 Sewer ane rapped at pmpaq line
o Exlsdnp sewer ling to rernaln and be used by propowit new sft tUre
(Lawaven witty 01"M
S. CAR6AGE
(All h wxhofd gflrbb)e dbposad off and final bill poll)
(wmmste htanapempn�vtner ccmpar�y)
O Completed Co)rstruptlopl Permit Applicat(on.form
6, ELEGTRICM
(EleC;rielty te be ShUt OF and rMW removed)
L
get 5attnd Energy)
7, FUEL STORAit3E TANKS
(Above or below de la�s. have beers pumped & f moved
anI 11% V, W smb111110M atlon
dP-Pauth long Fire and Reaotre)
L WATER - Public Source (Chant applicable bort)
o Matar'Go be :eneomd and Mal uddly bili paid l
�Msit rwarng09
m
ter Wier)
I "OPEN pa.r..R.
!. WATIN • P1ltfute Well (Check applicable boo)
c
a Mvo ell Tided ind nipped
a Feivatt wall to behtsed flu odor purposes
Ong cau►ty Eq*dnmental SOME")
❑ Provide the following fees: a- Demolition Permif Fee Bated on valvollon; gee table on pg 4 of thecomruction permit -pplication,
2. Ar tomatrton .!Fee $6.00
3. WA State Surcharge $4.59
4, Cash Road Deposit I Z01% of calculstgri btilld(ttg permit flea
Aelbndoble apan dotnpleted Fine) Tagpirction
Bullalim R122rlanriry I. aoD9 Pap: I or I k- Mendpuul0emat(So@ Penrit Rquifemwnls
ragvivii
El
Chris Bridge
From:
"Criscuolo, Liana" <Liana.Criscuolo@kingcounty.gov>
To:
<badgebuilthomes@gwestoffice.net>
Sent:
Wednesday, April 22, 2009 3:21 PM
Subject:
Asbuilt records for 2854 SW 300th Place
To whom it may concern;
There are no records of a septic system asbuilt for the above-mentioned parcel. When the septic tank i s found it
can be properly abandoned one of two ways; 1) pump, fill with compacted soils and crush lid or pump :Ind
remove tank. A licensed pumper then will complete a tank abandonment form and send to the Health
Department.
Thank you,
Liana Criscuolo, RS
206-296-9742
z /22/2009
Approved Transaction Page 1 of 1
pscIeanair.org
Puget Sound Clean Air Agency
Single -Family Notification Case #: 200900781
This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for
inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)).
Fee Amount Paid $75.00
Credit Card Transaction # VX]F3DCA0C3B
Transaction Date
04/28/09
Owner's Name
Rob & Michele Bessler
Phone (253) 576-6006
Site Address
2854 SW 300th PL
Site City
Federal Way
Zip 98023
Contact Person
Chris Bridge
Phone (253) 691-0323
Mailing Address
6203 Hawthorne Terrace
Tacoma, WA 98422
phis project includes asbestos removal.
)roject Size linear feet / 380 square feet
)roject Start Date 04/28/09 Completion Date 04/28/09
tsbestos will be removed by a licensed asbestos abatement contractor
phis project includes a demolition.
)emolition Start Date 05/15/09 Completion Date 05/18/09
)emolition will be completed by a demolition contractor
I certify that:
(1) This is a single-family residence project. The structure is used by one family who owns the property as their domicile.
(2) The information I have provided is to the best of my knowledge accurate and complete.
(3) I understand the fee for this Notification is nonrefundable.
Create Another Notification
If you have questions, contact us at asbestos@pscleanair.org or 206.689.4058.
https:Hsecure.pscleanair.orit/Asbestos/Approved.aspx 4/28/2009
W,
Assured Quality Environmental, Inc.
2702 A Street
Tacoma WA 98402
253-572-7175
Fax number
253-779-4020
Send to:
Bridge Built Homes
From: Liz
Attention: Chris
Date: 2/2/2009
Fax Number: 251-984-6675
Phone Number: (253) 512-7175
❑ Urgent
❑ Reply ASAP
❑ Please comment
❑ Please Review
❑ For your Information
Total pages, including cover:
ORIONEnvironmental Services
34004 - 9'h Avenue South ♦ Suite 5 ♦ Federal Way, Washington 98003-6740
• Tacoma (253) 952-6717 ♦ Seattle (253) 874-8118 • Facsimile (253) 927-4714 • Email lnfo@0r1onES.net
WBE W2F9219763
Polarized Light MicroscopyTest Report
EPA Method
600/R-98/116
Client
Assured Quality Environmental, Inc.
Date
January 27, 2009
2702 "A" Street
Page
Page 1 of 4
Tacoma, WA 98402
Invoice
090352
Date Received
January 23, 2009
Project Number Chris
Project Name 2854 South West 30e Place
Federal Way, Washington
Client
Orion
Sample Asbestos Other
Number
Number
Stereo Scone Exam
Treatment Percent
Type Fibers
AM -001a
90123-99a
Texture
- ND
-
Assoc. w/ AM -001c
AM-00lb
90123-99b
Skim Coat
- ND
Assoc. w/ AM -001 c
AM -001c
90123-99c
Plaster
- ND
- Cellulose
Homogeneous
AM -002a
90123-100a
Texture
- ND
- -
Assoc. w/ AM -002b
AM -002b
90123-100b
Wallboard
- ND
- Cellulose
Homogeneous
AM -003a
90123-101a
Skim Coat
- ND
-
Assoc. w/ AM -003b
AM -003b
90123-10lb
plaster
- ND
- Cellulose
Homogeneous
AM -004a
90123-102a
Greenish -Blue Vinyl Tile
- ND
"
Homogeneous
AM -004b
90123-102b
Black Felt Backing
- ND
- Cellulose
Assoc, w/ AM -004a
AM -004c
90123-102c
Dark Mastic
Chloroform ND
- Cellulose
Assoc. w/ AM -004a
AM -005a
90123-103a
Dark Gray Vinyl Sheeting
- ND
- Cellulose
w/ Black Felt Backing
Homogeneous
34004 - 9'h Avenue South ♦ Suite 5 ♦ Federal Way, Washington 98003-6740
• Tacoma (253) 952-6717 ♦ Seattle (253) 874-8118 • Facsimile (253) 927-4714 • Email lnfo@0r1onES.net
WBE W2F9219763
ORION
Environmental Services
A r. Yi r�rriti nr�»�nr��al �`nrNryinnnn i~nNanttinn l ;wr
Polarized sight Microscopy Test Report
EPA Method 600/R-98/116
Client Assured Quality Environmental, Inc.
2702 "A" Street
Tacoma, WA 98402
Project Number Chris
Project Name 2854 South West 30081 Place
Federal Way, Washington
Client Orion
Number Number Sterga Scone Exam
Date January 27, 2009
Page Page 2 of 4
Invoice 090352
Date Received January 23, 2009
SamPle Asbestos Other
Treatment Percent Tvne Fibers
AM -005b
90123-103b
Tan Mastic Chloroform
ND
- Cellulose
Assoc. w/ AM -005a
AM -006a
90123-104a
Gold Vicryl Sheeting -
ND
- Cellulose
w/ Black Felt Backing
Homogeneous
AM -006b
90123-104b
Tan Mastic Chloroform
ND
- Cellulose
Assoc. w/ AM -006a
AM -007a
90123-105a
Beige Marble Pattern Vinyl -
ND
- Cellulose
Sheeting w/ Black Felt
Backing
Homogeneous
AM -007b
90123-105b
Brown Mastic Chloroform
ND
- Cellulose
Assoc. w/ AM -007a
AM -0088
90123-106a
Black Flooring -
ND
- Cellulose
Underlayment
Homogeneous
AM -008b
90123-106b
Tan Mastic Chloroform
ND
- Cellulose
Assoc. w/ AM -008a
AM -009a
90123-107a
Tan w/ Green / Red / Beige -
ND
- Cellulose
Pattern 'Vinyl Sheeting w/
Dark (xray-Grecn Felt
Backing
Homogeneous
AM -009b
90123-107b
Brown Mastic Chloroform
ND
- Cellulose
Assoc. w/ AM -009a
34004
- 9'" AventIe South ♦ Suire 5 ♦ Federal Way, Washington 98003-6740
♦ Tacoma (253) 952-6717 ♦ Seattle (253) 874-8118 ♦ Facsimile (253) 927-4714 ♦ Email
Info@OrionES.net
WBE W2F92I9763
ORIONEnvironmental Services
An Environmental Compliance Consulting Firm
Polarized sight Microscopy Test Report
EPA Method 600/R-98/116
Client Assured Quality Environmental, Inc. Date January 27, 2009
2702 "A" Street Page Page 3 of 4
Tacoma, WA 98402 Invoice 090352
Date Received January 23, 2009
Project Number Chris
Project Name 2854 South West 30e Place
Federal 'Way, Washington
Client Orion Sample Asbestos Other
Number Number Stereo Scone Exam Treatment Percent Tie Fibers_
AM -009c
90123-107c
Tan Mastic
Chloroform
ND
- Cellulose
Assoc. w/ AM -009a
AM -010a
90123-108a
Brown w/ Beige Strcaks
ND
- -
Vinyl Tile
Homogeneous
AM -010b
90123-108b
Dark Mastic
Chloroform
4
Chrysotile Cellulose
Assoc. w/ AM -010a
AM -011
90123-109
Window Glazing
-
ND
- Cellulose
Homogeneous
AM -012a
90123-110a
Black Roofing Mastic
Chloroform
ND
- Cellulose
Assoc. w/ AM -012b
AM-0I2b
90123-110b
Black / White / Gray 3 -Tab
Ash
ND
- Cellulose
Roofing
Fiberglass
Homogeneous
AM -012c
90123-110c
Black Roofing Felt Paper
Chloroform
ND
- Cellulose
Assoc. w/ AM -012b
AM -013
90123-111
Flat Black Roofing
Ash
8 .
Chrysotile Cellulose
Homogeneous
AM -014
90123-112
hoofing Tar Paper
Chloroform
ND
Cellulose
Homogeneous
34004 - 9"' Avenue South • Suite 5 • Federal Way, Washington 98003-6740
• Tacoma (253) 952-6717 • Seattle (253) 874-8118 • Facsimile (253) 927-4714 • Email lnfo@OrionES.net
WBE W2F9219763
ORION Environmental Services
An Environmental Compliance Consulting Firm
Polarized Light Microscopy Test Report
EPA Method 600/R-98/116
Client Assured Quality Environmental, Inc.
2702 "A" Street
Tacoma, WA 98402
Project Number Chris
Project Name 2854 South West 300"' Place
Federal Way, Washington
Client Orion.
Number Number Stereo Scope Exam
Date January 27, 2009
Page Page 4 of 4
Invoice 090352
Date Received January 23, 2009
Sample Asbestos Other
Tre� Percent Type Fibers
Dup: Laboratory QA/QC Duplicate; M; Mastic ((a), (b), (c), etc.]: Sample layers numbered from front to back.
Comments: For layered samples, each component has been analyzed separately. ND means non -detect for
asbestos fibers by EPA Method 600/R-98/116.Disclaimers: PLM has been known to miss asbestos in a small
percentage of samples that contain asbestos. Thus, these laboratory results represent due diligence, however
negative or [1 % PLM results can not be guaranteed. Per PPA guidelines samples will be archived for 30 days
then will be disposed of, This report may only be reproduced in full with written approval of ORION
Environmental Services.
Analyzed By
21&1dC14'i2Reviewed By
Dennis Rauscbenberg Donna McNeal
Laboratory Analyst Laboratory Director / CEO
Leadrng SnaironmentafCompfiana Comw9ing Into tf a 2111 Century
34004 - 9"' Avenue South ♦ Suite 5 ♦ Federal Way, Washington 98003-6740
Tacoma (253) 952-6717 ♦ Seattle (253) 874-8118 ♦ Facsimile (253) 927-4714 ♦ Email Info@OrionES.net
WBE W2F9219763
a
0
ASSURED QUALITY
ENVIRONMENTAL INC.
SITE INSPECTION REPORT
ASBESTOS "GOOD FAITH" SURVEY
PROPERTY
2854 SW 300' PL.
Federal Way, WA
PREPARED._ FOR:
Bridge Built Homes
0
Good Faith Asbestos Survey
SCOPE OF WORK
0
On January 23, 2009 Assured Quality personnel conducted a "Good Faith" asbestos
survey (per U.S.E.P.A. /A.H.E.R_A. guidelines as designated and specified by Puget
Sound Clean Air Agency and Washington State Labor & Industries) of a residential
structure located at 2854 SW 300th PL. Federal Way, Washington.
Field inspection, data collection and report generation were. based on the following Scope
of Work:
Perform visual inspection to identify and inventory all accessible .suspect -
asbestos containing materials.
Bulk sampling and analysis of all identified suspect asbestos -containing
materials.
• Provide written report.
BASIC CONSTRUCTION
The structure. is a Residential structure built around the 1950's or 1960's. The exterior
siding of the structure is wood siding. The roof of the structure is composite roofing.
HEATING AND VENTILATION SYSTEM
Base board air system provides the heat in this structure.
PLUMBING SYSTEM
The plumbing is metal piping.
INTERIOR CONSTRUCTION, FINISHES AND FLOORING
The interior finishing of the structure is plaster and vinyl tile.
SAMPLE METHODS ANA LABORATORY INFORMATION
A walk through inspection of all areas was performed to identify which building
materials may have the potential for containing asbestos.
After identifying the suspect asbestos -containing materials, bulk samples were collected,
placed in plastic bags, numbered and recorded. Care was taken to clean all tools between
sampling in order to avoid cross -contamination. The samples and appropriate chain of
custody forms were then sent to Orion Laboratories to be analyzed for the type and
content of asbestos, if any. The samples were analyzed using Polarized Light Microscopy
(PLM) Stain Dispersion Technique in accordance with EPA Methods 600/R-93/116.
The following section contains tables listing all materials sampled by location,
description, type, asbestos percentage (if any) category, and results of materials sampled.
Assured Quality Environmental Inc. February 2, 2009
•
Good Faith Asbestos Survey
SUMMARY OF MATERI(AlI.S FOUND POSITM
•
Upon completion of the survey and review of the laboratory data, the following materials
were found to contain asbestos at the structure designated as 2854 SSV 300th PL. Federal
Way, Washington.
• Client sample# AM-OlOb Mastic Assoc. W/ AM -010a (Basement
Approximately 240 SF)
• Client sample# AM -013 Flat Black Roofing (Approximately 140 SF)
No other Asbestos was detected in any sample collected at this structure.
DEFINITIONS
Asbestos means the asbestiform varieties of Actinolite, Amosite (Cummintonite-
grunerite), Tremolite, Chrysotile (Serpentine), Crocidolite (Riebeckite), or Anthophyllite.
Asbestos -Containing Material means any material containing . more than one percent
(1%) asbestos as determined using the method specified in EOA regulations (Polarized
Light Microscopy).
Friable means materials that can be crumbled or reduced to powder by hand pressure.
Homogeneous Areas means an area which appears similar throughout in terms of color,
texture, and date of materials application.
Miscellaneous Materials means interior building material on structural components,
structural members of fixtures, such as floor and ceiling tiles, and docs not include
surfacing material or thermal system insulation (AHERA definition).
Surfacing Material means material that is sprayed -on, troweled -on, or otherwise applied
to surfaces, such as acoustical plaster on ceilings, and fireproofing materials on structural
members, or other materials on surfaces for acoustical, fireproofing, or other purposes
(AHERA definitiou).
Assured Quality Environmental Inc. February 2, 2009
Good Faith Asbestos Survey
Thermal System Insulation means material applied to pipes, fittings, boilers, breeching,
tanks, ducts or other interior structural .components to prevent heat loss or gain, or water
condensation, or for other purposes.
CONCLUSION
Abatement and disposal of asbestos -containing materials must be conducted by a
Washington State Licensed Asbestos Abatement Contractor using Washington State
Certified Asbestos Abatement Workers. Should employees or contract personnel
encounter any suspect asbestos -containing materials, itis their responsibility to:
• Contact a representative of the. owners.
• Consult the inspection report to determine whether or not the suspect
material contains asbestos.
• Ensure that all employees and contractors are informed and advised of
the location and type of materials that contain asbestos.
Any additional hidden or covered suspect materials, discovered during demolition or
renovation, that are similar to those identified in this survey must be treated as asbestos -
containing materials unless determined otherwise by laboratory analysis.
Note: Assured Quality Environmental does not guarantee approximations of quantities of
ACM, which may be listed with the analysis. It is therefore recommended professional
abatement price and/or disposal quotes be obtained by inquiring as to fees per area of
specific ACM material (i.e. square or linear foot, etc.), or by site assessment.
Any and all materials identified as ACM in this report must be abated prior tb ACM
disturbance, renovation, or demolition. All materials identified as ACM must be
professionally abated by a licensed asbestos abatement contractor prior to any
disturbance.
A copy of this report should be kept on site during any asbestos abatement, renovation, or
demolition.
Please contact the undersigned for any further assistance or if any questions or concerns
arise relative to this report.
Sincerely,
a._..z M..A.- r
Andrew Mantonya
AHiERA Building Inspector
3509-09-01-4405
Expiration Date January 16, 2010
Assured Quality Environmental Inc.
February 2, 2009
0
Good Faith Asbestos Surrey
0
Appendix #A
INSPECTOR'S CERTIFICATION
Assured Quality Enrizonmental Inc.
February 2, 2009
is
eftl Ica 9 0 om ction
f It pf,
PRESENTED BY:
COLE AND ASSOCIATES, TRAINING AND CONSULTING, INC.
THIS IS TO CERMI Y THAT
ANDREW L. MANTONYA
8220110TH ST. PUYALLUP, `NA 98373
HAS SUCCESSFULLY COMPLETED THE STATE OF FLORIDA APPROVED ,
AHERA BUILDING INSPECTOR REFRESHER
TRAINING COURSE
AS REQUIRED BY 40 CFR 753, SUBPART E, APPENDIX C
PROVIDER NUMBER 0003574
STARTING ON FRIDAY, JANUARY 16, 2004
ENDING ON FRE)AY, JANUARY 16, 2009
Cole and Associates, Traming and Coral iN Isu;.18000 72nd Ave S Suite 160
Kent, WA 48032 (425) 7?SSWS Paz (425) 7935.552
1 -877 -455 -BEAR and 1-888.414.8008
www.etcbew.eom
Training Administrator
Traini6i Director
3509-09-01-4405
1/16/2010
Certification Number
-Expiration Date
Cole and Associates, Traming and Coral iN Isu;.18000 72nd Ave S Suite 160
Kent, WA 48032 (425) 7?SSWS Paz (425) 7935.552
1 -877 -455 -BEAR and 1-888.414.8008
www.etcbew.eom
Good Faith Asbestos Survey
Appendix #B
FIELD DATA / LABORATORY RESULTS
Assured Quality Environmental Inc.
February 2, 2009
0
NO -W ENMOMEMwdL SERXAMPT F CrlC9v)DY ivORM _ __. _ _� -._-•
' - P.Rfl.TECT
PA
LIlG1�IT IYAlVII: SITE AIlDR1�SS: RELINT(pUlb'ALD BY:
RIM
,i.
TELEPHONE: nq&TEC11 1
?�OR.q RECE s
FAX: � DATE SAMPLE�. D: � . - •- r� .._ .
yr
CELLULAR: - DATE / TIME.
a 0 4 HOUR 024 -FOUR 030DAY
N
}
u
e
y PAGE OF
■
.y
i ■{
Mo. . !ie
MINE
y
i
f
#A"�Lllik. Mir,
m
'LI
MIN
Ill. _
lmpow�- N. mo a-m-avarLi
P4,"", MIN
min,
y PAGE OF
NOW O.rV AL SjWyTC�s
-%4MME CUSTODYF`ORIV .
Dl�n rn�* r �►vrrnra.� a
R4 GE EDF
�]E
SSURED
UAL1TYENV'1R0NMrriTA1, MC.
2702 "A" St. 9 Tacoma. WA 98402
Tacoma
1;7?_7175
Febr=7 2ad 2009
cbxi3
PO Boi 99219 -
Federal Way WA 99496
Seattle
763-7177
Re: Asbestos Abatement Quotation
2854 SW 3001hPl
Federal Way 98023
Chris:
... ..... ..
Assured Quality Environmeat-2. Or
proposal for Asbestos Abate rnogAtiM.F.
that our proposal meets your ts.
We propose to remove asbesios"c6auinirg
above for the stun of
SCOPE OF W�0-
1) Price includes the remove of
mastic.
2) Price includes the remove of
0
General Contractors Specializing in Asbestos/Lead
Removal, Interior Demolition and Mold Remediation
(360) 769-7175 Fax (22) 779-4020
oppornmity to provide you with this
: forward to wodmg with you, and hope
located at the address listed
240.0 i1c and associated
of Flat Roofing.
CONDITION:
1) Price includes Asbestos liability Insurance for Two Million ($2,000,000) Dollars.
2) Price Includes Disposal of ACM.
3) All work will be strictly performed pex EPA, WISIU & -OSHA Standards.
4) Price is based on Power and Water being provided by the Owner.
5) Price is based on all items removed from the area of abatement prior to out
Mobilization.-)
6) Price includes one permit.
7) Price air monitoring by AQE' Inc. only. 'PIN
xia
8) TERMS; PAYMENT IN FULL UPON COMPLETION OF WOM- 1.5%
Page 2
Interest charge due on unpaid balance.
EXCLUSIONS:
1. Price does not include Sales Tax.
2. Price is based on one mobilization.
3. AQE can not be held responsible for staple holes and tape residue during the
construction of our containment.
4. Price does not include the replacement of any items removed.
Thank you for giving us the opportunity to bid this project for you. If you have any
questions reearding this bid, please contact us at (253) 572-7175, or on rnv_ cell phone @a
253-377-7890.
Acceptance, gtf Proposal
By=
Date:
2
( 'f
City of Federal Way
Community Development Services
P.O. Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
41 1 Demolition
Permit #: 09 -101676 -00 -DE
Inspection Request Line: (253) 835-3050
Project Name: BESSLER
Project Address: 2854 SW 300TH PL Parcel Number: 416660 0170
Project Description: Demolition of (1) single family residence and (1) detached garage.
Owner
Applicant
Contractor
ROBERT & MICHELE BESSLER
BRIDGE BUILT HOMES
BRIDGE BUILT HOMES
2854 SW 300TH PL
PO BOX 99218
=@NQGBH259QC (9/13/10)
Ic
FEDERAL WAY WA 98023
TACOMA WA 98499
BOX 99218
k
- '900
TAC WA 98499
After final inspection is complete and app
Karic@cityoffederalway.com OR by fax a
V71mmer by e-mail at
a refund of cash bond.
PERMI EXP i Fri ay, May 6,
mit Iss d o ednesday, May 6, 21
1 hereby certify that thebove in mation t a d that the construction
the occupancy and the a will b ' accordance with the laws, rules reg
�and the City of F deral
Owner or aoenX � 4
\thebove described property and
tions of the State of Washington