Loading...
15-100274City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 ��' FILE Ifuilding - Multi Vamily Permit #: 15 -100274 -00 -MF Project Name: CRESTVIEW WEST APARTMENTS BUILDING 6 Project Address: 27910 PACIFIC HWY S Bldg 6 Inspection Request Line: (253) 835-3050 Parcel Number. 720480 0210 Project Description: NEW - Construction of a 31,326 square foot, 3 -story, 27 -unit apartment building. Includes plumbing & mechanical. Owner CRESTVIEW WEST PARTNERS LP ARRlicant SEAN MCKENNA Contractor FARRELL-MCKENNA Lender 17786 DES MOINES MEMORIAL Dl CRESTVIEW WEST PARTNERS LP CONSTRUCTION LLC Yes BURIEN WA 98148 17786 DES MOINES MEMORIAL DF FARREC" 005L6 (6/20/16) Permit for Building Shell Only?............................No BURIEN WA 98148 17786 DES MOINES MEMORIAL D: Special Inspection(s) Required? ............................. Yes BURIEN WA 98148 31326 Census Category: 105 - New 5- or More Family Building Includes: #1 #2 #3 #4 Occupancy Class: R-2 Construction T Type V - B Occupancy Load Yes Floor Areas . ft. 24,792 1 0 1 0 1 0 Additional Permit Information New / Additional Sq. Feet -1 st Floor .................... 8264 New / Additional Sq. Feet - 2nd Floor ................... 8264 New / Additional Sq. Feet - 3rd Floor....................8264 New / Additional Sq. Feet - Deck ......................... Mechanical to be Included? ................................... Yes Number of Stories ................................................. 3 New / Additional Sq. Feet - Other ..........................3852 Permit for Building Shell Only?............................No Plumbing to be Included?.......................................Yes Special Inspection(s) Required? ............................. Yes New / Additional Sq. Feet - Total .......................... 31326 Occupancy # 1 - Use............................................... Apartment House Zoning Designation...............................................RM 1800 Mechanical Fixtures' Fans................................................ 93 Plumbing Fixtures Bathtubs ......................................... 27 Dishwashers .................................. 27 Laundry Washer Outlets ............... 27 Lavatories ....................................... 45 Sinks............................................... 27 Water Closets................................. 45 Water Heaters ................................. 27 PERMIT EXPIRES Saturday, October 3, 2015 Permit Issued on Monday, April 6, 2015 I hereby certify that the aVq(re it the occupancy and the 4Ve will Owner or ation is correct and that the construction on the above described property and accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. '' Date: � w City of Federal Way Certificate of Occupanc � ,,,. A This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed byCWy staff, Tenant Name: CRESTVIEW WEST APARTMENTS BUILDING Permit #: 15 -100274 -00 -MF Address: 27910 PACIFIC HWY S B1dR6 Includes: #1 #2 #3 #4 Occupancy Class: R-2 Construction T Type V - B Occupancy Load- oadFloor FloorArea (sq. ft.) 1 24,792 1 0 1 0 0 Owner Name: CRESTVIEW WEST PARTNERS LP Owner Address: 17786 DES MOINES MEMORIAL DR BURIEN WA 98148 Building Official u�3-AS Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most seventy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner /occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which itis situated. Such compliance is the responsibility of the owner and / or occupant of the premises. THIS CARD IS TOre4 ON-SITE CITY of Federal Way Construction In Record j% INSPECTION REQ3) 835-3050 PERMIT #: 15 -100274 -00 -MF Address: 27910 PACIFIC HWY S Bldg 6 Project: CRESTVIEW WEST PARTNERS LP FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Footings/Setback ( 11) Rough Electrical Approved Foundation Wall (4115) 0 Drainage/Downspout (4040) Approved to place concrete Approved to place concrete By Approved to backfill By Date By Date By Date 0 Final - Building (4050) Approved Byp_t Date _ s Rough Electrical Approved Final Electrical Approved Slab/Concrete Floor (4255) Re -steel (4215) By Plumbing Groundwork (4190) Approved to place concrete or grout Date Approved to cover concrete Approvedtalt7e By Date By 1"A -t_ Date 5- _ (�'" By � s'_- ( ?_ -I j- Underfloor Framing (4285) Floor Sheathing (4105)Shear Walls (4245) Approved to sheath floor Approved to install flooring \-- rpro d to install siding By e Date %., _u_ By Date 1.. ~ By Date rL -1a _is Roof Sheathing (4220) Rough Plumbing (4230) Mechanical Rough -in (4165) Approved to install roofing Approved 'P b Approved By Date -. V— s By (\ � Date CL` By Date _ 1 ` 15 Gas Piping (4125) 0 Fire/Draft Stops (4095) Prior to scheduling a Framing inspection; Approved to release test Approved � Electrical, Plumbing&Mechanical Rough -in and By Date By Date e�_ Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 ❑ Framing (4120) 0 Gypsum Wallboard Nailing (4130) Insulation (4150) Approved to insulate Approved to install wallboard Approved to install mud & tape By Date %- :2, -) 5 By Dated _ ., _) ._ By 0-2%!�\J-"o Date Suspended Ceiling Grid (4265) , . 0 Final - S K F & R (4060) E] Final - Planning Approved to drop the Approved Approved By Date By Date By Date Final - Plumbing (4075) Final - Public Works (4080)11 Final - Mechanical (4065) Approved Approved Approved By Date By Date, c - _ By e �� Date 10 _ a 0 Final - Building (4050) Approved Byp_t Date _ s Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date DATE INSPECTOR AREA AND TYPE ("— INSPECTION �-. — MNOMETOW ' c► V ��. 1 M,L,+ PIP 1 L, r _.. -1111M ME 1 1 October 29, 2014 ES -3628 F & M Development Company, LLC 17786 Des Moines Memorial Drive Burien, Washington 98148 Attention: Mr. Greg McKenna Subject: Geotechnical Evaluation Crestview West Apartments - Building 6 27910 Pacific Highway South Federal Way, Washington Dear Mr. McKenna: Earth i Solutions NW", Earth Solutions NW LLC • Geotechnical Engineering • Construction Monitoring • Environmental Sciences RESUBMITTED MAR 2 0 2015 CITY OF FEDERAL WAY CDS As requested, Earth Solutions NW, LLC (ESNW) has prepared this geotechnical evaluation letter for Building 6 of the Crestview West Apartments. The undersigned staff engineer observed the excavation of a test pit within the proposed building footprint on October 14, 2014. Project Description The subject site is located at 27910 Pacific Highway South in Federal Way, Washington. We understand Building 6 of the Crestview West Apartments complex has recently burned down. We understand the previous structure had been approximately 40 years old. We understand a new Building 6 apartment structure will be constructed to replace the structure which had burned down. We understand the .building footprint for the new building will approximate the old building footprint. Subsurface Conditions As part of this geotechnical evaluation, a test pit was excavated within the proposed building footprint for the purpose of assessing the soil and groundwater conditions. The test pit was advanced to a depth of approximately five and one-half feet below existing grade. ESNW observed the soil conditions underlying the existing foundation to consist existing fill in a loose to medium dense condition (at -depth). The existing fill was observed to be silty sand with gravel material. 1805 - 136th Place N.E., Suite 201 • Bellevue, WA 98005 0 (425) 449-4704 9 FAX (425) 449-4711 �_l F & M Development Company, LLC October 29, 2014 ES -3628 Page 2 Review of geologic mapping of the area indicates the site is underlain by glacial till (Qvt) deposits. The test pit was not advanced into native soil, however, we anticipate native glacial till soil will be encountered throughout portions of the building footprint. Geotechnical Considerations Based on the results of our study, the proposed apartment structure can be supported on conventional spread and continuous footings bearing on undisturbed competent native soil, recompacted native soil, or new structural fill. Based on the soil conditions encountered at the test site, existing fill will be encountered throughout the majority of the building footprint. The soils encountered at the test pit locations generally have a high sensitivity to moisture based on the fines content of the soil. Compaction of the soil to the levels necessary for use as structural fill will be difficult during wet weather conditions. Where loose or unsuitable soil conditions are encountered at foundation subgrade elevations during site preparation activities, compaction of the soils to the specifications of structural fill, or overexcavation and replacement with granular structural fill will be necessary. Structural fill should consist of suitable granular soils compacted to 90 percent of Modified Proctor. Organic material exposed at foundation subgrade elevations must be removed and grades restored with structural fill. Provided the structure will be supported as described above, the following parameters can be used for design of the new foundations: e Allowable soil bearing capacity 2,500 psf e Passive earth pressure 300 pcf (equivalent fluid) e Coefficient of friction 0.40 A one-third increase in the allowable soil bearing capacity can be assumed for short-term wind and seismic loading conditions. With structural loading as expected, total settlement in the range of one inch is anticipated, with differential settlement of about one-half inch. The majority of the settlements should occur during construction, as dead loads are applied. Seismic Considerations The 2012 IBC recognizes ASCE for seismic site class definitions. If the project will be permitted under the 2012 IBC, in accordance with Table 20.3-1 of ASCE, Minimum Design Loads for Buildings and Other Structures, Site Class D, should be used for design. In our opinion, the site is not susceptible to liquefaction. The soil relative density and the absence of an established shallow groundwater table is the primary basis for this opinion. Earth Solutions NW, LLC F & M Development Company, LLC ES -3628 October 29, 2014 Page 3 Limitations The recommendations and conclusions provided in this geotechnical evaluation letter are professional opinions consistent with the level of care and skill that is typical of other members in the profession currently practicing under similar conditions in this area. A warranty is not expressed or implied. Variations in the soil and groundwater conditions observed at the test pit location may exist, and may not become evident until construction. ESNW should reevaluate the conclusions in this geotechnical evaluation letter if variations are encountered. Should you require additional information, or have questions, please call. Sincerely, EARTH SOLUTIONS NW, LLC Henry . Wright, E.I.T. Staff Engineer Raymond A. Coglas, P.E. Principal Earth Solutions NW, LLC C" �..M Federal Way omm .1, • PERMIT APPLICATION I 0 2015 �j CM OF FEDERAL WAY PERPOT NUMBER ✓ - L -025!2 25!2 7 V - TARGET DATE (711 SITE ADDRESS SUITE/UNIT # '2.-1 r , T . ; . 06 ' i �N.i ;�, " PROJECT VALUAn(M z0ofto A8SSSSO TAX/ AR $2,2cA51000 R -" �- L s2- _Q_ 2— A— 0 - TYPE OF PERMIT BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT � i PROJECT DESCRIPTION Detailed description of work to 20Q r be included on this permit only PROPERTY OWNER RA= C e S' , Q S } Pc%.n i rS 0 PRLfARTPRONE '20(0 -2 -Li ", 11AVAM ADDRESS 1 1 ' b ides M�iV1Gi �vti✓r 1 , X•*AD. c ne 1 CrrT STATE I W Zw $H RAMS FROM RfAII.II#6 ADDRESS _ 11`7 � O ¢s .cin 'c. -K 1�. r. 6-RGII. VI ✓ atIL 115.( CONTRACTOR CrIT B'xr% STAT& A ZIP C1 at Li" PAX - N3 -MS. WA STATS CONTRA TOR'S LICENSE # Ci EXPIRATION DA FEDERAL WAT BUSUGM LICENSE # �c 15; i o�-TN HAIR cu"W w -A. ., L PRLIA" PRONE 2 - ADDREes Vrad ba 'Dr. Z­Y`tII' Vhin&lA a .1st APPLICART C BTATg ZIP fAX U!A ' W1_ -Z ' -C(o54 NAM PROfART PRONE PROJECT CONTACT KABJRI: ADDRESS the ZM � �r. ` (The individual to receive and respond to all correspondence Cl?T 6:ac�ta. STATE W� I ZIP `�:`l�i FAX 2ob-2Lk3-c)c4>S`4 concerning this application) PROJECT FINANCING NAM ❑ OWNER. FINANCED Required value of $5, 000 or more NAILING ADDRESS, CITY, STATE, ZIP PRONE (RCW 19.27095) �- I cert(& under penalty of perjury that I am the property owner or authorised agent of the property owner. I cert(fy that to the beat of my knowledge, the irijbrmation submitted in support of this permit application is true and correct. I cert(/}( that I will comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the issuance of this permit doss the owner's responsibility for compliance with local, stab, or federal laws regulating construction or, ensiron1 s. I jlRrther agree to hold tss the Rf Federal Way as to any claim (including cosh, ej4penses, and attorneys' fees incurred in clta ,which maybe made by arg(person, including the undersigned, and filed against the city, the Investigation and dgr.� but only where such cls ouf o the reliance of the city, including its gjylcers and employees, upon the accuracy of the Yes information mWptied to a art this application. i8IGNATIIRE:DATE PRINT NAME: I Bulletin #100 -January 1, 2013 Page 1 of 3 k:\Handouts\Permit Application MECHANICAL PERMIT Indicate how many of each typo AIR HANDLING UNITS AIR CONDITIONER BOILERS COMPRESSORS DUCTING PLUMBING PERMIT Indicate how many of each type offtxture to be installed or relocated as part of this project. Do not include existing fixtures to remain. BATHTUBS (or Tub/Sho ,Combo) �.�L LAVS (H—dSi.ka) _-Ll�_ TOILETS WATER PIPING Z% DISHWASHERS — RAINWATER SYSTEMS — URINALS r OTHER (Describe) DRAINS SHOWERS VACUUM BREAKERS of S. —� DRINKING FOUNTAINS 7_7 SINKS witcher,/utility 7` WATER HEATERS (Electric) — HOSE BIBBS — SUMPS 2Z WASHING MACHINES Z TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS Lak, ilit ' &\I $ EXISTING/PREVIOUS USE LOT SIZE (In Square Feet) EXISTING FIRE SPRIMKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? _7 lr VOT AQzt1Avvwv% Li4R of S. ❑ Yes A No utYes ❑ No Bulletin #100 -January 1, 2013 Page 2 of 3 k:\Handouts\Permit Application