Loading...
16-105697Project Name: ARCO FACILITY - PACIFIC HIGHWAY Project Address: 35505 PACIFIC HWY S q 1zc' Building -6. Commercial Permit #:16 -105697 -00 -CO Inspection Request Line: (253) 835-3050 Parcel Number: 292104 9127 Project Description: NEW - Construction of a 3,180 square foot ARCO convenience store, 1152 square foot car wash and associated site work. Plumbing and Mechanical included. Owner Applicant City of Federal Way Lender Community Development Dept. FILE 33325 8th Ave S Type V- B Federal Way, WA 98003 ENVIRONMENTAL LLC Ph: (253) 8352607 Fax (253) 8352609 Type V - B Project Name: ARCO FACILITY - PACIFIC HIGHWAY Project Address: 35505 PACIFIC HWY S q 1zc' Building -6. Commercial Permit #:16 -105697 -00 -CO Inspection Request Line: (253) 835-3050 Parcel Number: 292104 9127 Project Description: NEW - Construction of a 3,180 square foot ARCO convenience store, 1152 square foot car wash and associated site work. Plumbing and Mechanical included. Owner Applicant Contractor Lender TRIPLE B PAC HWY INC BALBIR BIRKBIRK BALBIR BIRKBIRK Type V- B 3817 S 377TH ST ENVIRONMENTAL LLC ENVIRONMENTAL LLC Type V - B FEDERAL WAY WA 98001 11220 SE 265TH PL 11220 SE 265TH PL 0 Mechanical to be Included? ..................................... KENT WA 98030 KENT WA 98030 17500 Census Category: 322 - New Service Station and Repair Garage Includes: #1 #2 #3 #4 Occupancy Class: M M Construction T Type V- B Type H- B Occupancy Load: 65.00 Type V - B Floor Area (sq. ft.) 4,312.00 5,432.00 0.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 4332 New / Additional Sq. Feet - 2nd Floor.................... 0 New / Additional Sq. Feet - 3rd Floor ..................... 0 Occupancy #I - Area (Sq. Feet).............................. 4312 New / Additional Sq. Feet - Basement .................... 0 Occupancy #I - Construction Type......................... Type V - B New / Additional Sq. Feet - Deck .......................... 0 New / Additional Sq. Feet - Garage........................ 0 Mechanical to be Included? ..................................... Yes Plumbing Work Valuation?..................................... 17500 Mechanical Work Valuation? .................................. 30000 Number of Stories................................................... I Occupancy #2 - Class .............................................. M New / Additional Sq. Feet - Other........................... 4332 Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only? .............................. No Plumbing to be Included? ........................................ Yes New / Additional Sq. Feet - Total........................... 8664 Will Certificate of Occupancy be Issued? ............... Yes Occupancy #1 - Use ................................................ Retail/Mercantile Comprehensive Plan Designation ........................... Commercial Enterprise Zoning Designation ................................................. CE Total Valuation: 425,992.44 IN Air Handling Units 2 Fans 2 Hoods 1 Hot Water Tanks 1 Drains 8 Lavatories 3 Sinks 3 Urinals 1 Water Closets 2 Hose Bibbs 2 CONDITIONS: 1. Installation of new underground storage tanks must meet the requirements of the state vnderground storage tank regulations (Chapter 173-360 WAC). The regulations and required forms are available from the Department of Ecology (DOE) at http://app.leg.wa.gov/WAC/default.aspx?cite=173-360, http://www. ecy.wa.gov/programs/tcp/ust-lust/2011/02-installation.html, or by calling (360) 407-7170, or toll-free in state 1-800-826-7716. to install tanks must be filed with DOE at least 30 days prior to installation. Within 30 days after colOffgIMto serVice, the tanks must be registered with the Departgnent of Revenue's Business License Service on a state notification form (http://bls.dor.wa.gov/forms/700041.pdf and https: //fortress.wa.gov/ecy/publications/SummaryPages/ECY02095.html). 3. The supervisor on-site during the installation must be licensed by passing an exam administered by the International Code Council (ICC) (www.iccsafe.org). 4. New tanks and any connected piping must be protected from corrosion by either a cathodic protection system, or by being constructed or coated with a non -corrosive material such as fiberglass. An acceptable method of leak detection must be employed, and the tanks must be equipped with spill prevention and overfill protection equipment. 5. Stage I vapor recovery equipment is required on all new gasoline dispensing facilities with a total gasoline nominal storage capacity greater than 10,000 gallons. Also, a certified Stage H vapor recovery system is required for these facilities in all Western Washington counties (Chapter 173-491 WAC). 6. Installation of permanent signs and split rail fencing around the wetland consistent with FWRC 19.145.180(2) and (3)(a)(iv), shall be completed prior to final inspection for the building permit. 7. The owner of the subject site shall improve the other half of the shared access driveway on South 356th Street; namely, joint access and utility easement #20131224000787, per the recorded text of the easement. This amounts to an area approximately 20 feet wide by 52 feet long on the adjacent property within the easement, assuming the existing driveway layout. These improvements shall be completed prior to final inspection of the building permit. PERMIT EXPIRES Sunday, 22 October, 2017 Permit Issued on Tuesday, April 25, 2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ��Washington and the City of Federal Way. Owner or agent: c��uc\ C'C�iel� Date: 41i_ Z_1V 01'7' City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: ARCO FACILITY - PACIFIC HIGHWAY Address: 35505 PACIFIC HWY S Permit # 16 -105697 -00 -CO Includes: #1 #2 #3 #4 Occupancy Class: M M Construction Type: Type V - B Type II - B Occupancy Load: 65.00 0.00 0.00 Floor Area (sq. ft.) 4,312.00 5,432.00 0.00 Owner Name: TRIPLE B PAC HWY INC Owner Address: 3817 S 377TH ST FEDERAL WAY WA 98001 Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/ occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which itis situated. Such compliance is the responsibility of the owner and / or occupant of the premises. crrr of Federal Way Y ' THIS CARD IS TO REMAIN ON-SITE, Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 16105697 00 Address: 35505 PACIFIC HWY S Project: TRIPLE B PAC HWY INC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Initial Erosion Control (4365)❑ Footings/Setback (4110) Q Foundation Wall (4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date By Date tj By %4 Date 7 (ZS 17 ® Drainage/Downspout (4040) ® Re -steel (4215) ® Plumbing Groundwork (4190) Approved to install siding Approved to backfill Approved to install r0 fmg 11 Approved to place concrete or grout By Approved to cover By Date By Date By A t, Date V By Date ¢ By Date �- By Date b. 7❑ Slab/Concrete Floor (4255) ® Underfloor Framing (4285) ® Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date 90 Shear Walls (4245) E Roof Sheathing (4220) Rough Plumbing (4230) Fire/Draft Stops (4095) Approved to install siding Approved Approved to install r0 fmg 11 Approved By Q,Date t rl By e, Date By Date ;L— ® Mechanical Rough -in (4165) ® Gas Piping (4125) ® Fire/Draft Stops (4095) s Approved Approved to release test 1BY Approved By Date ?-e- �$ By to a Date 96 Interim Erosion Control (4370) Prior to schedelieg a Framing Inspections U Framing (4120) trk Approved Eleeal, Plumbing & Mechanical Rough -in Approved to insulate and FbrlDraft Stop inspections must be signed- lav off and a cd IBC 109.3 4 By Date By 0 Date _� s (Insulation (4150)0 Gypsum Wallboard Nailing (4130) ® Suspended Ceiling Grid (4265) Approved Approved to install wallboard Approved to install mud & tape By Approved to drop file By Date ¢ By Date �- By Date b. Final - S K F & R (4060) Final - PlanningJBy Final'- Public Works (4080) Approved r�----� Approved --�---- Approved By Date By Date Date 44-1119; ® Final Erosion Control (4375) © Final - Mechanical (4065) © Final - Plumbing (4075) Approved Approved JBy V ->Approved By Date By Date _ i �l V. Date 0 Final - Building (4050) - Approved By Date .. Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date uj-" K DLC R ' Wall F k . ^cl6 wce- . K I -Ilk r AN Z • R ,til r„i c.a . r. 4 ¢-r0. a .. .►, - 7 � C�1�(' �1ti- 6vl'Cl`�` �� t 1/i ' GkC.�� W C 1 1 �iMJ o �v mss-• _ k� 0- uj-" K 1913 SW 324TH ST FEDERAL WAY, WA 98023 206-724-3686 tabsllctcDoutlook.com Test And Balance Report PROJECT: ARCO AM -PM 35505 PACIFIC HWY S FEDRAL WAY WA 98023 ENGINEER: BARGHAUSEN CONSULTING ENGINEERS INC 18215 72ND AVENUE SOUTH KENT WA 98032 GENERAL CONTRACTOR: BIRK ENVIROMENTAL 11220 SE 265TH PL KENT WA 98030 This is to certify that Test And Balance Specialties LLC has balance the systems described herein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard industry requirements and procedures and the results of these test are herein recorded. DATE: 7/26/2018 TECHNICIAN: JORGE ACOSTA Test And Balance Specialties LLC Page 1 7/26/2018 TABLE OF CONTENTS DESCRIPTION PAGE COVERPAGE---------------------------------------------------------------------------------------------------- 1 TABLE OF CONTENTS 2 TEST INSTRUMENT CALIBRATION DATES ----------------------------------------------- -------------------------- 3 PRO]ECT SUMMARY ------------------------------------ ---------------------------------------------------------- 4 LEGEND SHEET 5-6 HP -1 7 HP -2 8 EF -1 & KEF-1 9 •------------------------------------------------------------------------------------------------ TAB DRAWINGS 10-11 ------------------------------------------------------------------------------------------------- Test And Balance Specialties LLC Page 2 7/26/2018 TEST INSTRUMENT CALIBRATION DATES INSTRUMENT MANUFACTURER MODEL NO. SERIAL. NO. CALIBRATION DATE DIGITAL FLOW CAPTURE HOOD ALNOR EBT -721 90647007 4/7/2018 DIGITAL VELOMETER ALNOR RVA -801 A03110 8/7/2017 DIGITAL THERMOMETER (AIR) ALNOR EBT -721 90647007 4/7/2018 DIGITAL VEL GRID (AIR) ALNOR EBT -721 90647007 4/7/2018 DIGITAL MANOMETER (AIR) ALNOR EBT -721 90647007 4/7/2018 HYDRONIC MANOMETER ALNOR HM -670 70633302 4/9/2018 SUBMERSIBLE THERMOMETER ALNOR HM -670 70633302 4/7/2018 AMMETER FLUKE 323 29600018WS 3/27/2018 AC VOLT METER FLUKE 323 29600018WS 3/27/2018 DC VOLT METER FLUKE 323 29600018WS 3/27/2018 OHM METER FLUKE 323 29600018WS 3/27/2018 PHOTO TACHOMETER EXTECH 461895 461895 7/25/2017 CONTACT TACHOMETER EXTECH 461895 461895 7/25/2017 DIGITAL LOGGING THERMOMETER UEI DT304 140104278 3/27/2018 Test And Balance Specialties LLC Page 3 7/26/2018 PROJECT SUMMARY 1.0 The air systems were tested and the results are as tabulated on the attached data sheets. 2.0 Installation of the mechanical equipment appeared to be installed with good quality, and followed the design intent of the mechanical drawings. 3.0 The equipment performed as indicated on the design drawings. Control operation was functional. 4.0 Corrections for temperature and altitude have been made on all test results shown in this report. 5.0 Ceiling Diffusers were measured with a direct CFM read-out meter. Adjustments were made automatically for temperature by our instruments. 6.0 Supply and return grilles were measured by direct reading flow hood. 7.0 Exhaust inlets were measure by direct reading flow hood. 8.0 Pitotube traverse of equipment were done only where available. (2 pipe diameter upstream and 6 pipe diameter downstream of only elbows) 9.0 Air outlets were generally numbered with the closest to the fan being #1. Generally, supply outlets were numbered as 1, 2, 3,... exhaust outlets as El, E2, E3....., and return outlets as R1, R2, R3..., etc. 10.0 The testing and balancing was performed in accordance with the standard industry requirements and procedures, The results of these tests have been recorded and reported. Test And Balance Specialties LLC Page 4 7/26/2018 AHU AC OR ACU ACCO AD7 P.D. AMP AVG B.H.P. C.D. CFM C.E. CH CHWR CHW OR CHWS C.R. CT CWR CW OR CWS DB D.D. D.P. DIA DISP D.N.A. D.N.L EAT EDC EDH EF EMCS EWT FCU FH FG F.E. F.LA FPB FPM F.S. F.S.R FT. NO FTU GPM GFH HC HEATER O.L. HEPA N.F. HOA H.P. HPS HRC HVAC HWR HWS HX I.D. LEGEND SHEET AIR HANDLING UNIT AIR CONDITIONER UNIT AIR COOLED CONDENSING UNIT ADJUSTED PITCH DIAMETER AMPERE AVERAGE BRAKE HORSEPOWER CEILING DIFFUSER CUBIC FEET PER MINUTE CEILING EXHAUST CHILLER CHILLED WATER RETURN CHILLED WATER SUPPLY CEILING RETURN COOLING TOWER CONDENSER WATER RETURN CONDENSER WATER SUPPLY DRY BULB DIRECT DRIVE DIFFERENCE, NET DECREASE OR INCREASE DIAMETER DISPLACEMENT DATA NOT AVAILABLE DATA NOT LISTED ENTERING AIR TEMPERATURE ELECTRIC DUCT COIL ELECTRIC DUCT HEALER EXHAUST FAN ENERGY MANAGEMENT CONTROL SYSTEM (S) ENTERING WATER TEMPERATURE FAN COIL UNIT FUME HOOD FLOOR GRILLE FLOOR EXHAUST OR RETURN FULL LOAD AMPERAGE FAN POWERED BOX FEET PER MINUTE FLOOR SUPPLY FLOOR SUPPLY REGISTER FEET OF HEAD FAN TERMINAL UNIT GALLONS PER MINUTE GAS FIRED HEATER HEATING COIL THERMAL OVERLOAD PROTECTION FOR MOTORS HIGH EFFICIENCY PARTICULATE AIR HEPA FILTER HAND/OFF/AUTO SWITCH HORSEPOWER HIGH PRESSURE STEAM HEAT RECOVERY COIL OR HEAT RECLAIM COIL HEATING, VENTILATION AND AIR CONDITIONING HOT WATER RETURN OR HEATING WATER RETURN HOT WATER SUPPLY OR HEATING WATER SUPPLY HEAT EXCHANGER INSIDE DIAMETER Test And Balance Specialties LLC Page 5 7/26/2018 LAT LEAVING AIR TEMPERATURE LD. LINEAR SUPPLY DIFFUSER LPS LOW PRESSURE STEAM LT. LIGHT TROFFER LWG LOW WALL GRILLE LWR LOW WALL RETURN LWT LEAVING WATER TEMPERATURE MAU/MUA MAKE UP AIR UNIT MBH 1,000 BTU'S PER HOUR N.A. NOT ACCESSIBLE N.I. NOT INSTALLED N.T. NOT TAKEN N.V.L NO VALID LOCATION N.Z. NOZZLE O.D. OUTSIDE DIAMETER OPEN NO TERMINAL DEVICE INSTALLED O.S.A. MIN OUTSIDE AIR MINIMUM OAT OUTSIDE AIR TEMPERATURE PF POWER FACTOR PHC PREHEAT COIL PHC PHASE (S) PMP CIRCULATING PUMP P.P PERFORATED PLATE PSI POUNDS PER SQUARE INCH P.T. PITOT TRAVERSE RA RETURN AIR RF RETURN AIR FAN R.G. RETURN GRILLE RHC REHEAT COIL RPM REVOLUTIONS PER MINUTE SA SUPPLY AIR SAT SUPPLY AIR TEMPERATURE S.D. SUPPLY DIFFUSER SEF SMOKE EXHAUST FAN SF (AIR) SUPPLY FAN S.F. (ELECT) SERVICE FACTORS SHC STEAM HEATING COIL S.P. "W.C." STATIC PRESSURE RESISTANCE, MEASURED IN S.W.E. SIDEWALL EXHAUST S.W.R. SIDEWALL RETURN S.W.S. SIDEWALL SUPPLY TAB TESTING, ADJUSTING, AND BALANCING TSP TOTAL STATIC PRESSURE UH UNIT HEATER V VOLTS VAV VARIABLE AIR VOLUME VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE VP VELOCITY PRESSURE W WATTS WB WET BULB W.G. WATER GAUGE OF DEGREES FAHRENHEIT DP DIFFERENTIAL (DELTA) PRESSURE OR PRESSURE DROP DT DIFFERENTIAL (DELTA) TEMPERATURE, NET PSI POUNDS PER SQUARE INCH Test And Balance Specialties LLC Page 6 7/26/2018 TAB •T Specialties T Air And Hydronic Balancing PROJECT NAME: Arco AM -PM Federal Way AREA SERVED: Store DWG DESIGN 2.0 M REF: 2000 SCH MO REF: 1960 b : Jorge Acosta date: 7/26/2018 UNIT DATA HP -1 SYSTEM EQUIPMENT MFG. TRANE EQUIPMENT LOCATION CEILING MODEL TAM9AOC60V51DAA TYPE SERIAL NUMBER 17503KGLl V FAN DATA DESIGN ACTUAL TOTAL CFM- FAN 2000 1960 TOTAL CFM - OUTLET 2000 1960 RIA CFM 1675 1605 O/A CFM 325 355 FAN RPM RPM WA EXTERNAL SP 0.6 0.60 SUCTION SP BHP -0.45 DISCHARGE SP N/A 0.15 FAN SHEAVE FAN SHAFT DIA NO.BELTS / SIZE SHAFT C / C MOTOR SHEAVE MTR SHAFT DIA SHEAVE ADJUSTMENT DIRECT DRIVE MOTOR DATA DESIGN 0 ACT AL MOTOR MFG - WA HP 1 VOLTS 208 2091 1 FLA 6.4 6.01 1 PHASE 1 HZ 60 RPM WA SERVICE FACTOR 1 FRAME - 48 BHP 0.9 EFF N/A POWER FACTOR N/A STARTER HEATER ELEMENTS Thermally protected SPEED SETTING/ VFD Command HIGH AIR DISTRIBUTION DATA SHEET 11 AREA SERVED NO. CODE SIZE AK DESIGN FPM CFM INITIAL FPM CFM ISTRAT EGY % OF TEST 2 % OF DESIGN FPM CFM DESIGN FINAL FPM CFM % OF DESIGN HP -1 OFFICE 1 SD -2 6" Hood70 0 65 93% PREP 2 SD -2 6" Hood 150 32 129 21% 135 90% PREP 3 SD -2 8" Hood 150 63 129 42% 135 90% HALL 4 SDA 6" Hood 65 45 56 69% 60 92% WOMENS 5 SDA 6" Hood 50 50 43 100% 45 90% MENS 6 SDA 6" Hood 50 53 43 106% 45 90% STORE 7 SD -3 12" Hood 400 435 344 109% 370 93% STORE 8 SD -3 12" Hood 400 425 344 106% 365 91% STORE 9 SD -3 12" Hood 400 395 344 99% 380 95% STORE 10 SD -3 12" Hood 400 340 344 85% 360 90% SUPPLY TOTAL 2135 1838 1838 86% 1960 929A STORE R1 300 170 146 57% 230 77% STORE R2 1700 800 825 47% 1375 81% RETURN TOTAL 2000 970 970 49% 1605 80% OSA 1325 868 868 1 267% 355 109% REMARKS: Test And Balance Specialties LLC Page 7 7/26/2018 TAB T Specialties Air And Hydronic Balancing PROJECT NAME: Arco AM -PM Federal Way AREA SERVED: Store DWG DESIGN ACTUAL 2.0 M REF: TOTAL CFM - OUTLET SCH M0.1 REF: O/A CFM b : Jorge Acosta date: 7/26/2018 UNIT DATA HP -2 SYSTEM EQUIPMENT MFG. TRANE EQUIPMENT LOCATION CEILING MODEL TAM9A0C60V51DAA TYPE SERIAL NUMBER 17502P681 V FAN DATA DESIGN ACTUAL TOTAL CFM- FAN 2000 1944 TOTAL CFM - OUTLET 2000 1944 R/A CFM 1675 1600 O/A CFM 325 344 FAN RPM WA EXTERNAL SP 0.6 0.58 SUCTION SP -0.40 DISCHARGE SP 0.18 DRIVE DXTK- FAN SHEAVE DIRECT DRIVE FAN SHAFT DIA NO.BELTS / SIZE SHAFT C/C MOTOR SHEAVE MTR SHAFT DIA SHEAVE ADJUSTMENT MOTOR DATA DESIGN ACTUAL MOTOR MFG - N/A HP 1 VOLTS 208 209 FLA 6.4 6.0 PHASE 1 HZ 60 RPM WA SERVICE FACTOR 1 FRAME 48 BHP 0.9 EFF N/A POWER FACTOR WA STARTER HEATER ELEMENTS Thermally protected SPEED SETTING / VFD Command HIGH AIR DISTRIBUTION DATA SHEET 11 REMARKS: Test And Balance Specialties LLC Page 8 7/26/2018 TAB T Specialties �'"' Air And Hydronic Balancing PROJECT NAME: Arco AM -PM Federal Way UNIT DATA UNIT ID EF -1 AREA SERVED Women EQUIPMENT MFG GREENHECK MODELNUMBER SP -8200 SERIAL NUMBER 72329458-0035 FAN ESIGNUA TOTALCFM 220 215 FANRPM 1328 1300 E.S.P 0.25 0.20 MOTOR MFG FASCO HP NOT LISTED VOLTS 115 MPS 2 PHASE 1 HERTZ 60 RPM 1100 SERVICE FACTOR 1 FRAME 48 BHP #DIV/0! EFF NOT LISTED POWER FACTOR 1 HEATERS Thermall SPEED SETTING SINGLE SINGLE UNIT DATA UNIT ID KEF-1 AREA SERVED HOOD EQUIPMENT MFG CAPTIVE AIRE MODELNUMBER DU33HFA SERIAL NUMBER 3337347 IF -TAN -UTA— t AL CFM E 650 665 RPM 1328 1300 E.S.P 0.5 0.40 MOTOR MFG HSSA HP 1/3 VOLTS 115 118 MPS 3.8 3 PHASE 1 1 _ HERTZ 60 60 RPM 1625 SERVICE FACTOR 1 FRAME 48Y BHP EFF NOT LISTED POWER FACTOR 1 HEATERS Thermall SPEED SETTING I SINGLE I LO DWG REF: M O.2 by: Jorge Acosta date: 7/26/2018 _UNIT DATA UNIT ID AREA SERVED EQUIPMENT MFG MODELNUMBER SERIAL NUMBER N DATA ACTLIAE TOTAL CFM FAN RPM E.S.P MOTOR MFG HP VOLTS FLA PHASE HERTZ RPM SERVICE FACTO FRAME BHP EFF POWER FACTOR HEATERS SPEED SETTING SINGLE Test And Balance Specialties LLC Page 9 7/26/2018 SPLIT PACKAGED HEAT PUMP UNIT SCHEDULE LEGEND by MANwMnmQ/MDML/ swwM Tors weeµ u� Catll4 NGnNG INDOOR TIN X GlTll ELEC - MTA '� : 4vaT..MN Ban91M 11 RD1w+Ks Mas ( ) I u av SYMBDL ABBmvlsrlDx oArAlvrprl 0 BX M9X <FM �. 'fu" e:+R� EER sLLn RMP. r. F "' SPF u`I.'wo. Hp Kw - mm CowR. Ha R,I- Mu "uv NR (aNE)sNaP) *--W ®6® •HANE• iAM]9Meae15C STa1E __ __ _ __ _ .! __ __ __ __ __ 10011 .000 Op 10 fOd O ]< 30e -- 0 S. TO I O 333 llE f I ] < ] p 1 p B 10 -.- R\/RR ! RCTURN Ael DUCr (RRL/plpP) ENQX �FORRM_- ®6® •INANE' < 70BDA1000A STME S.0 55.5 N.5 90.0 e7.0 134 1 .b I 1M i1 SA.O JlK j".:!.'..BOB t m iJQe/nl.ai IT 00Cbl1�rlG4FE� L-e[R%p11.Plr REPRE9Qr8 _®- CO/SR (ARROYMUD X11 - OF -tom (<-WAr TrDMX Ir M IMOK) Qi EIECOK xGnNO/ .C- CDDLIHG PAC 0 SPIrt Q NOT Uam. Q PRonM TM fa1bMN¢ FAC10A' MSiALLED OPrNINe: ® Y�NaL PqN fttLIRN cONxFiigrl. Umm HGT PUMP UNR. S NSUlARO CISINEr MFROSf CYCIE. CaPRpSM IleAO STARE ND. Q! HIGH EfarclEMCT, STAVOMSD INDOOR FAV. dRmr OIM Q PR0.5E PROGRYIYA92 M[RIEMTAT. D. MTQCNH�rtRR SI UO 4M4Mt AN FRESH Aw PER VENL SCnEaxE O R-1tD RfiNNXRKFT. Q EW4FAEM NA AS YNSEUP An Fa 13M 3 Qa ECa04ZER 6 RF11EF (YICRONETL 4%1X0 -EQUAL fgAL HOOP SET FOR ]IS CM FAC. UI9F. Ql YEM p F,LRRS WOH If0NE3'ASLL JAM CaixaLfR OR EgML) _ EXHAUST FAN SCHEDULE QHMsr . srA FIFCTaCAL MiA 4MK ERNCE lM'At1011 aR PRESSURE RPM WDM MANULM]URpI 6 MODEL / REYM«] Ch M. w.G. ATR vaTS PNASE Ne ROOF JIe ] SDI e50 0500 (f/I) t p0 b CAPTVEVRE' WJ]HFA < 5 elY�1 fO ---- -' ® NES)ROaR -NG 0250 - b e0 'CREENNEC«' ® SLU eMLHNIE O.J]5 0b (1/<) e0 'CAPtNFNRE• aJOHfA QpI. ' - Q CODNG MWNTED ExHAUSr FAN. QS MUSNNooM TmE FAN. _-- ._ Q PROUDE N B[TxmN K -t ANO ND- /HPN3 LNRO Rs F Q3 INrpilDt« MTI IIGR HxraE. © SPEm COMRJLL£R. -TEN Qj W¢M BACmRAFr OMIPOi. OT PROAM MIM 11' ROOF CURB. «6-1 Is ENERGIIEO. rtN I'IQRIE C- mM.-, QA w eQ dSCONNECr Swra. AIR DEVICE SCHEDULE Wry -NOSA dfiLYA FICC � � w REMwKs g3 .'. Mm. %DML ra, urm '"E slzE (RIEHm) PANaE 8 4 'S a n n 4 v _ _ x - % _ _ _ ir015 PAS I 13 b-1 e'P tZ113' 0 -IBD x - �O GENERAL NOTES I CaS11M1CTa ro CaIpIY WM: - CURRdT sTArz 9U -NO CODE. wM LMAL AMENDMENTS - CURRENT 9TAR M[aINIICAL COOL wM LOCAL AMENOIIENn - CURIRNT STATS PLUM COOL wM LOCAL AY..Y 73 - ISMNEM STATIC EIlCTMCAL COOL. MM LOCAL AMENONFNTS - .,..0 FlRE COM, MYN LOCAL AIAQ - anIEXT STAR ENERGY COD[. MM LMAL AMENDIENn ]. ME CanACfOH 5 M9PaaIBIF Idl PERMt RES. ME CON- SNALL FLR45N ALL MATERIALS. LABOR. IC4UIPMQT, n Mit F -ON IANDMOR'QK eNMA'LL"EWPL'�A"Y M1 rNRAPftt T- � � mVERNINO RE¢ULATONS ANO MEET rlE APPROVAL M ME LOCK 195dcnoH. MA -1 ARTICLE a TSEM aF OUNNENT OTR% MAV TUT tiCATED SHALL. NOT M Ulm UNLESS APNIOMED IN MMa¢ BY TSE ENS�BMNEQ Fµ ANY ONANMS IN MECHKYCAL EL TC j*/OR OTHER RF9 .R,T U a iM vro SU. a.NTRACr ION .AT-iIO°CMpiIWK cost m MF OnRA. 5. TAKE ALL PRECAUTaI NECID RY TO PROTECT ME A ­SSI( NO AM AFTER MSTAIJATON. IN ME ERNT OF DWADL IWFDIA1mI REPAIR ALL DAMAGED AND O TIR Mde( TO ME APPROVAL OF TIME MW I— AT NO ADDITaAL COST TO TSR I—. e. -.I SETS 0 DOM IWC AND WINTC1 MANUIIS $HALL BE vle4m0 wa canEna v PRD:Lcr. )' w ADana ro EgRPYEMT wARRwlncs, FUMISX A werTEx WIRAnTEE AGNNST OMm IN 4ATW- ANp yNnN4AX91P MI ONE RAR. WMANTF£ SHALL MAINE RpNR OF OAMArt N, M REPIA¢YFNi K, ANY PART OF EWEMENT OR PREwSES CKSD BY EOUSNAI,l PNONMD. RR/RS REARM -/0.- " " ARCO ER/m R[CtN Al1Al1WCf/ Lt10RR MM TpIHNO VANL9 m r3Qln1 COMr1LCr10N (U DUEL IRRNc It• Mltx 1ML5! oTN01RTSF ND1ED flNOLt IAe[ 0LC1 eRANdI TAK[-Dn 011 T `RLCTR TO "0 rLcpu (5• �'__ r]n Duct -0 4arup T -STAT PRodUYYABIL TIERYOSiAT s SENSa _ 2G H A l S 'C^ m ^G � _ yP Nh` `C7jHc r"GtNf f. nN0 AHAIIL sOUM ENT. AA E9J12 (AtS71S1-e]u (175JISI-e1BI FAS ieM+W pFan<o1DA c Co. SSAsoIE SD aICT 910NE OETECTdI 1 ___-..__.__.. �4 .. YD 4ECWNN:LL D1MPFl1 ____ 0M. OlWE1ER O `U- A4D NirALLED BY MOIHANCAL COIIrRM10M1 O FUR 11 ANO NSALASO BI EIECfRIGI 11NNMMIFD �. COrIfRACIM AYO ® NSTALIFD BI EIECIRMC4 WMRW.TOR. "0.c. - OF -I- b=t (sO-wPRr aFFr1aER, RO-aEnRM OIfiLISER. E-LNXwat) tW AXI OMMT' IN aM - -y MECw MK EWBPYIX ��' // MllpUifp U. d1 A" vM - Q' _ srPt ®� <.M Ca1diKK1MO BOD BMN DRNT OIbPER � aRcurt cLc. cDUND Cool. CONNEa/WNNECTKn �.r .. XA __ _ __ . -- -._-- CONE. LONPR CONIMALEET SO -2 IIY It' ' IW -e)0 x _ _ _ x _ x _ _ _ TiUS PAS ]O SO -1 t0Y ,e•. x x x TT,3 TSR 'I' "0 - - - - - -�3 _ _ - _ _ _ PG -t PER OyIC] PFR DNOS �� TrtuS b -F I 3 Qi PRDwM OPPOSED BIPF DAMPER. O 13'PE ANp ?FY SHLLL M As RMCAIED ON OMwxG A EMN NR DEVICE. NC Stall. BE m OR IAS. QJ SEIECTaI M, .- OF AN Of ES IGNEIi/M ECi. AIR CURTAIN SCHEDULE MAN, MIME FAN FI£CnICK SFRNa �"'RIMS im wE10Nr MWEL WN. FPM MAx. CN M VOLTAGE PHASE IFNGM MPM (195) "EMARKS ® Sro)1N3U-A .A]5 5.10p ilyD f/3� f02 115 1 ITt' es ]I Il 1u 1 2 Qi MIB[ CROSMrCH N SAD C. TUi R[AM w11EH O0" OPENS. 0 sFIErn¢n a THE nxsHm o<Aw nnruN m INrERKn MsroIIFR/ARaMRCT. MINIMUM OUTSIDE AIR VENTILATION SCHEDULE MIDIMpmfJMe4e<u. veFMII,mMsaweMleSNASAMA­ ­10IoR Rate er W15,W 4Ci base0 0P ASHRA[ N0. 82.11010 mR< eF<Ammg zp0.Al, sv]t<m People OLIMOOr PopelaToO. Area Outd.11 zOM DsllbuNo Zone Vent let on Al4t< NUmberor AF DaupIRt Qu...,A,, AN< 'r EglveO OuleoOFA'F EfflclRnry[v !Oc<uparHy (AM/person) people n Id,Y41) D ity TOY, E,(Teble flow liable s ec<,' E u�_TaE I.F. �Cace ory <e lsl) Table 103.3 liable 403.31 (p/1DOOs1 Vbe/(CFM 103.11.2 Vol/ICFMI 403.1.13.I IHD1/ -I R FRo If9a ).5 IS 0.12 15 39D.1B 1N 390.n I. -- -- 5 Istorq< 393 0.0 0 0.12 0 ).16 100 16 090 W Iw Co DJIs � 36 NA NA OM NA NA N=. N - ort - ._- Drr" ] 1118 Lao to � 90 imaR MaKimMn,a al mmw<a raD3.3 <Kce r esnan me pcnl a 6e les:man ppe neu nm<m3.3. __ iD•ppoA<]tl Min mu De -g Ou•tltw !W 'A) e l Intake flow V I Gt/LCFM) Vp]/(CfM) 352 610 41 R 3 M40.1 - -.. l0 3L .. _.._-N ENERGY CODE NOTES: TI - ConiRC, ..B MSE_ AC3.2 11 4 C103.111.2. « 2) "v _ wSE[. 7 1111 B .. iN5U1n1[o to R e : Fv 01.3.1.1 .10 -11I BMNILI µ0 5) SI:nDIr -0 RETAY IIS 11 11111TIC111 SPACES . . C1G])p.2 wSfC. „0 4ryP 33 PFR 6) Et UN. N[OUIIEULN15 OF .pNIE aoJ>B wsfc. ]) 0 C oIN s1vl Anc Ea FOR <u - 'N1 ...: "s.. B) I'BC;YTFMS SIW L OF COMM SS OARED PCR [1a D _ - - .DESIGN CODES: NI -ANIFI.Yll t t NRxNA JNh MI CHAN Ch LODE 20 - - 20t Jf 2015 NrfNNAi oNN. ixF LODE till:AI.1. NF'NF0 INFO I'NIf)R TO CM CUBIC FEET PER 4NUTE __ W CONPEM9NE ""'r +---'--" - _-'- - DET. M]NL DRC. DRCONNECr 0n OOyrtl INw R00f 9�' ____ Ei QNAU. 1. (E) IXI9TNO EAT. ENLbq A'R RIIPQATURE DC BLNERK CONAACidI OF Ob fLYNN.'E NM xG 4o. LRNATxO. AND AB caNDRDas AYPKTY ER. AAAu-MINIMUM MECH, MI'X -1FMUY WJIWUo.EPCWRENr PRORtrgH (H Mb WOSA OU}90E Aw PX PMEE IAD RLTIIRN AIR DUCT . ARCO 91T1 �OOO ErIVPRI KIEL CAN0" W 0 MiCY CAR WASH 31M PI MRS 9MMEM- 1ewMTr FACILITYNiBO 7 SAD SU., AM Wcr V. 4rwNtEtS srE¢ - IYP TIPIML ua alAs oTEERwsE norm wn -- - DRAWING SCHEDULE MEET4AEo11 MSCAPrION Y0.1 40.3 X10 MJ.D Mel 4G.1 i NO- IEO[Iq. aMRK SLNmUTA I YEaANKAI SPEDFIGTONS YEaANKAL RDOR PLW I -.- I 00F PIAN YECNAN CK DETNLS Iwe X000 9 FANG SXa dGMINO I canal ( E - A�'A^ �W _ rAvw NOTES, SCHEDULES 8 LEGEND r.ESUS'(,F,--gip ,,,., 'M MoE1 HVAC GENERAL NOTES: by A Noao Y,NEw NP E,A rWN; sYSTEY. PER •IEEE M0.1 M•YDM rEC1UMN Mrz Or 880 CM Or OVt510E NP 9MLL BE mNT•uasEr x/). e. u] oum oPENINas IND NP msreuxmoN COYPONEms sMLL eE PRorccrEo WRNS JU•9D R OWIEIIFM9�� COMPICTOP BYALL PPOnp[ IpRp•AMmE " C IIP �)[ef 1111 Y�/Y PPNV[R AML OPEM)ION, MlC Or C•MYR FNV, MNeW " CN'fUPE Mm CpRN1MOrt PEdICRwxE m iNE EIOIII19f D—. ti$I[Y AT XCIPMI OPFP nN0 CDNOXpxB. IIECWWICK CM'TMCTM SITYL P01Fg1Y D C. ARCO O P" N YNOTES: (I ?�G H AO e.[YPO ]2Ir[ f5e5B nunl enY tMX De In GP5YOd1��81R. 3, FOLL ESfI SUPPLY NR� FlIW RN -1 l MIIX rwlletF �NNECTCM (VENRABPYS OR EOVAy. ND00 YW3W NR NA MIAC SYBTEY. mA01�h1O[1b60 ]. LL 80E RCTMN Ae WCT rPOY IM -i ?;L(tH ��: ' vC-2 Iro0 M� PEIt [eeET YD I NtNNAnON MIF ABOVE C0uN0 w]IN iiF)Oe1E CCNNFLICN C NGMC ®-- OP 880 CM OE OD15WE AYi SeYLL 6E WH �P CiY / 50 rt) e0B rP.w _O COMTINWV9I.Y �6RY:E A .FUWLL.E�CDUNe�M1MNRD [ MNlRCX01 ,83,8 )h0 Aw91XE �11N \J FU. COUNG•MNi1110�•Z C0�11NCLTOX (.�!'x]I EKY! / ➢Dau E l - zo. saE nm.,NiucE a ivPE 3 c E usrEn rom. c 3 xs -e Av RO i GF' Yem ). 18Y ECMUSf DUCT UP ro K-1011 1E Ivu netE) "T-114`0 ss°DcrY R7 a P�rtao�aFwwxE YAsrzR TMrnuosrAr, • ®••"� Y e 1 >- ,� s - � .� S TrlePwsru aworE sEnsarE • Ra• NF.r t ... Z1 __.. oulpie W„r ee w PNnaaoscPn�iuro 6 ` - o e os*11 c cE”' ,3. ,xvr ERNN18! NP Ducr w m Er -x oN b _ _ R1 eD z e • 1 ... _ 1] CIBIE DAPPER-AWUSf iWN FACE O Q 1 .. DENSER. ANEYOBTAT w -C 011 EOLLLL AA —14• r08 OH a (iTPILII N SWO C. N4A9 Nm r;? z.oc H 1 2 R•w oucr ro Dlrr>rxu_..- mi ,.. YAPnNN C- 2 —E usuuNc[s2CIFARM'CE cwlwslImF.s: nrA• ��/a 2� iE 'a \ r, j6 NR CURtNN, 1Ee Y0.1 iW BPEC. Ly fiwtrM e - f w/W {� y-. Iz / e M[RYOtfAT ro pFPPtt [I-1. SR FIN 4 TD pCPGF[ AT )TF. j6 ere P =.rY7 $ _ 'tri _ I . NE --WHET➢ goo-siwr APo sPRrcw � ) VIBMimN ItOUTORt IYIN 1' OeRECTION). '� - - Nowoe Such 90tYR: [wAr cross. cIw zoaa'crX �� ,''x." ,orrY .e �� calloulsac To 3ALL PIECE a 4 UPC ° o emu x0awwIX""• IN Cn1DoaArz CONfPQ nf01 F-2 TVA. 11 I CONCEMMrz 5`MICII d1 dmsT. Il�P�K COIF Lrj m CONOpBArz 9 RIM�PIIYP (LITR[ T T wIM 18 OR C �9'NOBCREf XP 1x'P 5,41 CW1K1, iERYIMTE Ai TT PIECE OF ATOM OP OT1[P APPPD+LO EIXNPf VPC AND LOfll JR50. 8 PCM n. _ aOcclw CONOFNMrz CON11mL Y'fP1 E -Z )MP r .UL1In CONOENSArz 9eITCl1 ON MIFF. L xau,e� Pra�.v 5 8 1U 5, ] Nei D1C1 aPner® MID ANI M. .WCHOR OVIOOOR XNIR M CONp1ElE - ARCO NT'1 5�c I Ocflr -- - ® P'N Olsfw•mw CpiONEMB SM1L NWBCNECPRm PID. PAD M O.0 3000 WWPM oN aE PRorzcrzo WM10 mNr,RucnoN 21, EDONp1I= Yomm eoR •rN AcnY,)oPs, FUEL CANOPY.Ia MPGA .A^ eY� �WCrw 12'P rJ PER TIC NO LOfIL 4NS0119. OONTRILS. YqM 80% \ NPnsoxTmM� REOVRoaNrs. YKPpETI aE Eauli coerROE 24R4e CAR WASH p'�OEirui�iro"iwa Paor wirN / e qC elPo Scree Arm Roof aP. _ aaw PAaRc NO a e.�p[•rm Rr a.sfis�nu,ez. FAc-FAC - -- - am ♦ TBD coM ivc'roa sNru PRanE PusdeuPc[ rEsr LEmRxwrz ro OWr1En - � .. ® R,. aEToa nME IPPnovN_ TEsr swu NVPrT PROPER aPERATn11. Mrz a --. oD1Mnr rM1, YNmw NP, u,P,ule INo cafrNNmrr PEREW3W.NLE aAT mNiPu.-raRM00Dsrwi cD11°nnenmgrmmorls. YEf.WYIOIL Tem xcP,P ^ [DFLOOR PLAN - MECHANICAL MECHANICAL FLOOR PLAN M4F .• _.., M2.0 ` RECEIVE® ` CITY OFVz��OEC 0 1616 PERMIT APPLICATION Federal Way PERMIT CENTER + 33325 8�h Avenue South +Federal Way, WA 98003-6325 CI �Y OF FEDERAL WAY 253-835-2607 + FAX 253-835-2609 +yermitcenter(a,cityoffederalway.com A CDS PERMIT NUMBER 1 (G _ �q _ C TARGET DATE SITE ADDRESS SUITE/UNIT # 35505 Pacific Highway South PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL # $1,297,884.32 CE 2 9 2 1 0 4- 9 1 2 7 TYPE OF PERMIT )I BUILDING X PLUMBING X MECHANICAL ❑ DEMOLITION )I ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT ARCO Fueling Facility Construction of a 3,180 s ware foot ARCO convenience store with a PROJECT DESCRIPTION Detailed description of work to _ A - two 2 be included on this permit only underground storage tanks, and a 1,152 square foot car wash. NAME PRIMARY PHONE Triple B Pac Hwy Inc. (206) 455-4776 PROPERTY OWNER MAILING ADDRESS E.MAU, 3817 S. 377th Street CITY STATE ZIP Federal Way__WA 98001 NAME PHONE To Be Determined MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # NAME PRIMARY PHONE Balbir Birk Birk Environmental LLC (206) 455-4776 MAILING ADDRESS 3817S . 817S. 377th Street _j E-MAIL APPLICANT CITY Federal Way STATE I WA ZIP 98001 FAX PROJECT CONTACT NAME Nick Wecker, Barghausen Consulting Engineers, Inc. PRIMARY PHONE (425) 656-7469 (The individual to receive and MAILING ADDRESS 18215 72nd Avenue South E-MAIL respond to all correspondence CI'T'Y STATE ZIP FAX concerning this application) Kent WA 98092 nwecker@barghausen.corr PROJECT FINANCING NAME ❑ OWNER -FINANCED When value is $5,000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. SIGNATURE:Or" )ff� DATE PRINT NAME: 1'r3 i & B Bulletin #100 — January 29, 2016 Page 1 of 2 k:\Handouts\Permit Application a VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ 30,000 Indicate how many of each type offixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. 2 AIR HANDLING UNITS 2 FANS GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS 1 HOODS (commcrc,w( BOILERS FURNACES 1 HOT WATER TANKS (Gos) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR VALUE OF PLUMBING WORK PLUMBING PERMIT Yes (wellhead protection, Lakehaven Lakehaven wetland $17,500 Indicate how many of each type offixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. BATHTUBS (or'ILb/Shower combo( 3 LAVS (Hand Sinks) 2 TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS 1 URINALS OTHER (Describe) S DRAINS SHOWERS VACUUM BREAKERS —T DRINKING FOUNTAINS 3 SINKS (Kitchen/Utility( WATER HEATERS (Electric) L HOSE BIBBS SUMPS WASHING MACHINES 19 TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS Yes (wellhead protection, Lakehaven Lakehaven wetland $ N/A EXISTING/PREVIOUS USE LOT SIZE (In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? Undeveloped 182,894 SF D Yes X No D Yes X No COMMERCIAL — NEW/ADDITION AREA DESCRIPTION Area In Occupancy Groupts) Construction # of Additional Information Square Feet a Stories Nam1 vII,DINo 3,1801,1,152-,M / I \ ADDITION COMMERCIAL — REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area in Occupancy Groups) Construction # of Additional Information S uare Feet a Stories 777 7 7777-777 Np \ COTAL 4.'\` \ $UII.D1Nd 41 TENANT AREA ONLY PRO,iNCT ARTA ONLY Bulletin #100 - January 29, 2016 Page 2 of 2 k:\Handouts\Permit Application CITY OF FEDERAL WAY Temporary Certificate of Occupancy This temporary certificate is issued pursuant to the requirements of International Building Code, Section 110.3. Business Name: Owner Name: Site Address: Permit number: Occupancy Class: Construction Type: Floor Area (sqf�): ARCO FACILITY — FEDERAL WAY Triple B Pac Hwy Inc. 35505 Pacific Hwy S 16 -105697 -00 -CO M �. 5,432 SL5ott Sproul, Building Official Its 4,312 8/15/18 Date This TEMPORARY CERTIFICATE OF OCCUPANCY expires on AUGUST 24, 2018 5:00 p.m. * * Temporary occupancy allowed per Development Services Manager * * ** The applicant will complete the items on the 8/10/2018 Punch List prepared by George Hauser including installation, testing and City approval of the storm water pump station by 5 p.m. on August 24, 2018 ** ** The five Land Use items must also be completed prior to issuance of Permanent C of 0 ** CITY OF FEDERAL WAY Temporary Certificate of Occupancy This temporary certificate is issued pursuant to the requirements of International- Building Code, Section 110.3. Tenant name: ARCO FACILITY — FEDERAL WAY Owner Name: Triple B Pac Hwy S. Site Address: 35505 Pacific Hwy S Permit number: 16 -105697 -00 -CO Occupancy Class: M M Construction Type: 2-11 V -B Floor Area: 5,432 sf 49312 Scott Sproul, Building Official August 10, 2018 Date This TEMPORARY CERTIFICATE OF OCCUPANCY expires on September 9, 2018 ** Temporary occupancy allowed for STOCKING AND TRAINING PURPOSES ONLY ** **An ADA -approved plate or other temporary measure must be installed over the missing sidewalk panel in the public right-of-way** **All site work and righto-of-way work must be completed to the satisfaction of the Public Works Director prior to issuance of the permanent Certificate of Occupancy**