Loading...
15-103528Ouildint - Bingle Faifi ly Permit #: 15 -103528.4b -SF Inspection Request Line: (253) 835-3050 Project Name: MIRROR ESTATES LOT 7 Project Address: 920 SW 315TH PL Parcel Number: 555700 0070 Project Description: NEW - Construction of a 2,683 square foot 2 -story single family residence with a 70 square foot covered entry, 243 "outdoor room" and 412 square foot attached garage. Includes plumbing & mechanical. ***4 bedrooms; $509,450 estimated selling price*** Ownr ARRlican City of Federal Way Lender Community Econ. Dev. Services a3325 8th Ave S JAGIRA HANE Federal Way, WA 98003 W FILE Ph: (253) 835-2607 Fax: (253) 835-2609 HENLEY USA INC Ouildint - Bingle Faifi ly Permit #: 15 -103528.4b -SF Inspection Request Line: (253) 835-3050 Project Name: MIRROR ESTATES LOT 7 Project Address: 920 SW 315TH PL Parcel Number: 555700 0070 Project Description: NEW - Construction of a 2,683 square foot 2 -story single family residence with a 70 square foot covered entry, 243 "outdoor room" and 412 square foot attached garage. Includes plumbing & mechanical. ***4 bedrooms; $509,450 estimated selling price*** Ownr ARRlican Contractor Lender HENLEY USA INC JAGIRA HANE HENLEY USA INC OWNER IS LENDER 11100 MAIN ST SUITE 100 HENLEY USA INC HENLEUL898DB (3/10/17) New / Additional Sq. Feet - Garage ....................... 412 BELLEVUE WA 98004 11100 MAIN ST SUITE 100 11100 MAIN ST SUITE 100 New / Additional Sq. Feet - Other .......................... 70 BELLEVUE WA 98004 BELLEVUE WA 98004 3408 Census Category: 101- New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: No Floor Areas . ft. 0 0 0 0 Additional Permit Information New / Additional Sq. Feet - 1 st Floor....................1661 New / Additional Sq. Feet - 2nd Floor ................... 1022 New / Additional Sq. Feet - 3rd Floor....................0 New /Additional Sq. Feet - Basement .................. 0 Basic Plan?........................................................... No Occupancy # 1 -Construction Type. ....................... Type V - B New / Additional Sq. Feet - Deck ..........................243 New / Additional Sq. Feet - Garage ....................... 412 Mechanical to be Included? ................................... Yes Occupancy #I - Class ............................................. R-3 New / Additional Sq. Feet - Other .......................... 70 Plumbing to be Included?...................................... Yes New / Additional Sq. Feet - Total .......................... 3408 Occupancy # 1 - Use............................................... Residence (1 or 2 family) Mechanical Fixtures Ducting ........................................... 1 Fans................................................ 7 Fireplace Inserts............................. 2 Furnaces ......................................... 1 Gas Piping ...................................... 1 Gas Pipe Outlets............................. 8 Hot Water Tanks ............................ 1 Plumbing Fixtures Bathtubs ......................................... 2 Dishwashers................................... 1 Laundry Washer Outlets................ 1 Lavatories....................................... 5 Showers.......................................... 1 Sinks............................................... 1 Water Closets ................................. 3 Hose Bibbs..................................... 2 PERMIT EXPIRES Tuesday, February 2, 2016 Permit Issued on Thursday, August 6, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use w' be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date` Z �I& I �w ar City`&`federal Way T '� Certificate of Occupanc i 1:1 This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by_jty staff. Tenant Name: MIRROR ESTATES LOT 7 Address: 920 SW 315TH PL Permit #: 15 -103528 -00 -SF Includes: #1 #2 #3 #4 Occu ancy Class: R-3 Construction Type: Type V - B Occupancy Load Floor Area (sq. ft.) 0 0 0 0 Owner Name: HENLEY USA INC Owner Address: 11100 MAIN ST SUITE 100 BELLEVUE WA 98004 Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severiy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises. � + y CITY OF Federal Way PERMIT #: 15 -103528 -00 -SF THIS CARD IS TO IN ON-SITE Construction In ection Record INSPECTION REQ TS: (253) 835-3050 Address: 920 SW 315TH PL Project: HENLEY USA INC FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Insulation (4150) Approved to install wallboard By�js Date �- Final - Mechanical (4065) Approved By A43 Date It( 11L Gypsum Wallboard Nailing (4130) Approved to install mud & tape S Date 1 t 10 )<� Final - Plumbing (4075) Approved By ko Date Final Erosion Control (4375) Approved By Date E] Final - Building (4050) Approved By Af� Date El SWM Precon Site Mtg (4400) ❑ Initial Erosion Control (4365) Electrical Approved Footings/Setback (4110) Approved By To be done prior to breaking ground Approved to place concrete By Date By Date— By _ Date' _ _ Insulation (4150) Approved to install wallboard By�js Date �- Final - Mechanical (4065) Approved By A43 Date It( 11L Gypsum Wallboard Nailing (4130) Approved to install mud & tape S Date 1 t 10 )<� Final - Plumbing (4075) Approved By ko Date Final Erosion Control (4375) Approved By Date E] Final - Building (4050) Approved By Af� Date El Foundation Wall (4115) Drainage/Downspout (4040) Electrical Approved Plumbing Groundwork (4190) Approved to place concrete By Approved to backfill Approved to cover By Dat _ _ By Un/i Date 4) 111 I (S— By Date Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By K4 Date x,12 ( I<` By V4 Date I o t ti ( - E] Roof Sheathing (4220) Rough Plumbing (4230) ■ Shear Walls (4245) Approved to install siding Approved to install roofing Approved By NQ Date ( a( t 4i 1 t C By PA -L— Date l u -1_2-15' By Date to ( t 4 l i Fire/Draft Stops (4095) Gas Piping (4125) Mechanical Rough -in (4165) Approved Approved to release test Approved By VV� Date to ( 23 (19- By V4 Date t o( 27 (15- By Date jWW I A I Framing (4120) Interim Erosion Control (4370) Prior to scheduling a Framing inspection; Approved Electrical, Plumbing & Mechanical Rough -in and Approved to insulate B Y Date Fire/Draft Stop inspections must be signed -off and B Y Vu13 Date ti I I approved. IBC 109.3.4 Insulation (4150) Approved to install wallboard By�js Date �- Final - Mechanical (4065) Approved By A43 Date It( 11L Gypsum Wallboard Nailing (4130) Approved to install mud & tape S Date 1 t 10 )<� Final - Plumbing (4075) Approved By ko Date Final Erosion Control (4375) Approved By Date E] Final - Building (4050) Approved By Af� Date El Rough Electrical Approved E]Final Electrical Approved Right of Way Approved By Date By Date By Date I cm of Federal Way RECEIVE JUL 2 0 2015 PERMIT OPPLICATION 7 CITY OF FEDERAL WAY PERMIT NUMBER5 _ YD, -0j 2 g _ TARGET DATE SITE ADDRESS SUITE/UNIT # 920 SW 315th PI. Federal Way, WA 98023 PROJECT VALUATION ZONING ASSESSOR'S TAR/PARCEL # $ 327,916.91 RS 5 5 5 7 0 0- 0 0 7 0 TYPE OF PERMIT BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT Enclave at Mirror Lake lot 7 PROJECT DESCRIPTION Detailed description of work to g family home (mechanical, plumbing New single fil hmhanical, lumbin and electrical included Plan 21-40.02 F / 2R be included on this permit only PROPERTY OWNER NAME Henley USA, LLC PRIMARY PHONE 425-646-4022 MAILING ADDRESS E-MAIL 1 1 10 Main St. #100 Seattlepermits@mainvuehomes.com CITY Bellevue STATE ZIP 98004 FAX 425-646-4024 NAME Some as owner PHONE MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # HENLEUL898DB 03 /10 /2017 NAME Jagira Hane PRIMARY PHONE Same as owner APPLICANT MAILING ADDRESS Same as owner E-MAIL jagira.hane@mainvuehomes.com CITY STATE ZIP FAX PROJECT CONTACT NAME Jagira Hane PRIMARY PHONE MAILING ADDRESS Same as owner E-MAIL jagira.hane@mainvuehomes.com (The individual to receive and respond to all correspondence CITY STATE ZIP FAX concerning this application) PROJECT FINANCING NAME ® OWNER -FINANCED Required value of $5,000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the ci a part of this application. r SIGNATURE: DATE PRINT NAME: Jagl a Hane Bulletin #100 - January 1, 2013 Page 1 of 3 k:\Handouts\Permit Application MECHANICAL PERMIT Indicate how many of each typt AIR HANDLING UNITS AIR CONDITIONER BOILERS COMPRESSORS DUCTING VALUE OF MECHANICAL WORK $ 7,248 fixture to be installed or relocated as part of this project. Do not include existing fixtures to rem 7 FANS 8 GAS PIPE OUTLETS OTHER (Describe) 2 FIREPLACE INSERTS HOODS (commercial) 1 FURNACES ) HOT WATER TANKS (Gas( GAS LOG SETS REFRIGERATION SYST GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ 5,600 Indicate how many of each type offixture to be installed or relocated as part of this projecL Do not include existing fixtures to remain. 2 BATHTUBS (or Tub/shower Combo) _ 5 LAYS (Hand Sinks( 3_ TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS 1 SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS ) SINKS (Kitchen/Utility) ) WATER HEATERS ( 2 HOSE BIBBS SUMPS WASHING MACHINES 17_ TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS N/A Lakehaven Utility District Lakehaven Utility District N/A EXISTING/PREVIOUS USE LOT SIZE )In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? N/A 8,139 SF ❑ Yes X. No ❑ Yes X No Bulletin #100 — January 1, 2013 Page 2 of 3 k:\Handouts\Permit Application M[RROR ESTATES LOT7